Possible Injection Scheme in the (80 km) TOE: Tunnel Of Everything Lucio Rossi, Attilio Milanese and Davide Tommasini CERN Work of H. Piekarz (FNAL) widely.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

LHC Machine Protection
11 March 2012 Holger Witte Brookhaven National Laboratory Advanced Accelerator Group A Dipole (without) Grain Oriented Steel.
Target chase, decay and absorber cooling for LBNE A. Marchionni, Fermilab 8th International Workshop on Neutrino Beams & Instrumentation CERN, November.
TASD R&D IDS-NF Mumbai. 2 Alan Bross IDS Plenary Meeting – Mumbai October 12-14, 2009 Detector R&D There are 3 components to this detector and their respective.
Linac-LHC ep Collider Options F. Zimmermann, F. Bordry, H.-H. Braun, O.S. Bruning, H. Burkhardt, A. de Roeck, R. Garoby, T. Linnecar, K.-H. Mess, J. Osborne,
Cyclotron Refurbishing & Development Meeting March 6, 2008.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 LBNL: Helene Felice – Tiina Salmi – Ray Hafalia – Maxim Martchevsky.
Ultimate Storage Rings PEP-X and SPring-8 II R. Hettel for the PEP-X design team and T. Watanabe et al., SPring-8 FLS 2012 JNAL March 7, 2012.
EuCARD HE-LHC’10 AccNet mini-workshop on a „High Energy LHC“ October 2010, Villa Bighi, MALTA Considerations about the injectors of the HE-LHC R.
E. Todesco DIPOLES FOR HIGH ENERGY LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Bordini, L. Bottura, G. De Rijk, L. Evans, P. Fessia, J.
Petavac Boson-Boson Collisions at 100 TeV Peter McIntyre and Akhdiyor Sattarov Department of Physics Texas A&M University 1  (TeV) 10.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
FLUKA status and plan Sixth TLEP workshop CERN, October 2013 F. Cerutti #, A. Ferrari #, L. Lari *, A. Mereghetti # # EN Dept. & *BE Dept.
11 October 2006Basic Layout of LER G. de Rijk1 Basic Layout of LER  The basic idea  VLHC type magnets  LER in the LHC tunnel  Layout  LER experiment.
LER Workshop, CERN, October 11-12, 2006LER Accelerator Major Components - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Outline:
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
Concept of a hybrid (normal and superconducting) bending magnet based on iron magnetization for km lepton / hadron colliders Attilio Milanese, Lucio.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
Loss problems associated with the acceleration of radioactive beams and what we can do about it A.Jansson f fermilab Loss issues (and ideas for solutions)
Magnets for muon collider ring and interaction regions V.V. Kashikhin, FNAL December 03, 2009.
The FCC Magnet Program: Challenges and Opportunities for HTS
P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 1 Outline  A quick review of the VLHC oA short description oSome important technical points.
Cryogenic Experts Meeting (19 ~ ) Cooling scheme discussion for 300 Tm High Energy Beam Transfer line (HEBT) with large inclination MT/FAIR –
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Compact & Low Consumption Magnet Design Workshop for Future Linear and Circular Colliders Geneva, November 26-28, 2014 Saving opportunities in accelerator.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
880.P20 Winter 2006 Richard Kass 1 The Large Hadron Collider LHC is located at CERN CERN is located near Geneva Part of CERN is in France The LHC collides.
Eric Prebys, FNAL Snowmass 2013 Community Planning Meeting Fermilab, October 11-13, 2012 Minneapolis.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Conveners: Eric Prebys; Luca Bottura (s. secr.) October 16, 2010.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
LARP Collaboration Meeting, April 19, 2007Super-Ferric Fast Cycling SPS – Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac - Motivation.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LIUWG Davide Tommasini ALTERNATIVES FOR D1s Requirements Normal conducting (resistive) Superferric iron dominated Superconducting costheta Side.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
HHH From Pipetron to LER: history of a brilliant idea and goal of this workshop Lucio Rossi CERN CARE-HHH workshop on LER CERN -11 October 2006.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
New Magnet Technology (for high field) Lucio Rossi CERN INFN - CNS1 future strategy Elba 22 May 2014.
Henryk Piekarz SC Magnets at Fermilab HTS Cable Test for a Fast-Cycling Accelerator Dipole Magnet E4R Test Goals and Arrangement Review September 10, 2009.
Rapid Cycling Magnets - HTS-based Design Concepts Henryk Piekarz with J. Blowers, S. Hays and V. Shiltsev Fermilab MAP Winter Meeting, SLAC, 3-7 December,
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
Beam screen cooling: scaling from LHC to FHC Philippe Lebrun FHC meeting on beam pipe design, CERN 20 December 2013.
FHI experimental opportunities? FHI meeting 17/9/14.
New Magnet Design for FCC- ee Attilio Milanese, CERN 26 Oct presented by Frank Zimmermann.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
contribution to the round table discussion
Warm magnets for LHeC / Test Facility arcs
Accelerator Magnet Technology for future machines
LHeC interaction region
Arc magnet designs Attilio Milanese 13 Oct. 2016
Pierre-Alexandre Thonet
Beam Pipe Meeting Introduction
HIGH ENERGY LHC E. Todesco CERN, Geneva Switzerland
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
Accelerator R&D Results from the B-factory
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
Review of Quench Limits
RHIC Magnets for JLEIC Yuhong Zhang May 11, 2018.
Electron Collider Ring Magnets Preliminary Summary
MEIC Alternative Design Part V
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

Possible Injection Scheme in the (80 km) TOE: Tunnel Of Everything Lucio Rossi, Attilio Milanese and Davide Tommasini CERN Work of H. Piekarz (FNAL) widely used

HE-LHC cost: rough evalution based on LHC LHC (machine): about 3 BCHF (material, 2008), 1.7 BCHF for the magnet system, HE-LHC: The non-magnet is  same 1.5 BCHF – Magnet System Nb 3 Sn (26 TeV c.o.m.) :  3.5 BCHF (for a total of 5 BCHF for the whole machine) – Magnet System HTS (33 TeV c.o.m) :  5 BCHF (for a total of 6.5 BCHF for the whole machine) – The above cost are for a new machine, like LHC. Economy could be made because Cryo and other systems need only renovation; – however one should consider cost of LHC removal)

Other important issues, among many Synchrotron radiation 15 to 30 times! The best is to use a window given by vacuum stability at around K (gain a factor 15 in cryopower removal!) First study on beam impedance seems positive but to be verified carefully Use of HTS coating at 50 K on beam screen to be explored Beam in & out Both injection and beam dump region are constraints. Ideally one would need twice stronger kickers Beam dumps seems feasable by increasing rise time from 3 to 5  s Injection would strongly benefit from stronger kickers otherwise a new lay-out is needed (different with or wihtout experiments)

For HE-LHC :injection based on SPS+ Possible use of Tevatron and HERA dipoles… HE-LHC Linac4 SPS+ New injectors optimization

Alternate scenarios for Injectors Keeping SPS (and its transfer lines: 6 km!): Low Energy Ring in LHC tunnel with superferric Pipetron magnets (W. Foster). Work done by Fermilab (H. Piekarz), see Malta workshop proc. – cost of LER is lower than SC-SPS option. – Integration is difficult but no show-stoppers

Specific issues of the VHE-LHC Beam Energy/Dipole Field optimization might be different Aperture can be larger Synchrotron radiation MUST be removed at the highest possible temperature: Photon stopper? A solution could be use of HTS coated on a beam screen at around 100 K. The wall resistance will be very low and the 2.5 MW/ring (about 30 W/m) can become 25(x2) MW of cryopower! Kicker problems will be strongly reduced.

Injection Scheme The first baseline was to use LHC Either with a SPS+ or wiht a LER in LHC However if the LHC is used ONLY for injector it is not worth – About 40 MW continuous power at plug for Cryo only – Maintenance of a difficult 27 km tunnel and 7 km injection lines for 10% of use Proposal: remove LHC and inject from SPS into a 80km-LER

Injection scheme: SPS+  LHC  VHE-LHC is to expensive (50 MW power for cryo) 28Jan20138

Possible arrangement in VHE-LHC tunnel From H. Piekarz Malta Prooc. Pag mm V gap 50 mm H gap 30 mm V gap 50 mm H gap 28Jan20139

Possible VHE-LHC with a LER suitable for e + -e - collision (and VLHeC) Cheap like resistive magnets Central gap could be shortcircuited Or use of 4 beams to neutralize b-b LER can bend electron GeV proton or 5 TeV/beam Limited power both for resisitive (e+e-) and for p-p (HTS) Sc cables developed already for SC links (HiLumi). SR by e- taken at 300 K Cheap like resistive magnets Central gap could be shortcircuited Or use of 4 beams to neutralize b-b LER can bend electron GeV proton or 5 TeV/beam Limited power both for resisitive (e+e-) and for p-p (HTS) Sc cables developed already for SC links (HiLumi). SR by e- taken at 300 K 28Jan201310

A few numbers for proton injector 75 kA With I = kA Bmax= 2 T

A few numbers to use the same magnet for e+ - e- I =3 kA The injection field is low, 74 Gauss (no diluition). Concern for field quaity. We think is possîble with «noble» Fe grain oriented but probably also with normal Fe-Si. Already tested at100 Gauss. Next magnet (for RCS) will be tested to 50 Gauss. Diluition can also be a possibilty (not good for p-p injector) The injection field is low, 74 Gauss (no diluition). Concern for field quaity. We think is possîble with «noble» Fe grain oriented but probably also with normal Fe-Si. Already tested at100 Gauss. Next magnet (for RCS) will be tested to 50 Gauss. Diluition can also be a possibilty (not good for p-p injector)

A Super-Resistive cable Cable: inner core of 40 mm Cu (700 mm2) + outer core : 2 layers, 150 strands of MgB 2, 1 kA each; Outer size 45 mm. 120 kA =>120 k€/km ! For electrons: us Cu water cooled, J ov 2.5 A/mm2 (easy): P plug =11 MW/80km For protons: 800 A/strands 120 kA (for >2.1 T); the central copper is the stablizer Power: 0.1-W/m at T op = 10 K consumption/cable should be possible: 10 kW of cold power: P plug = few MW This is for each channel… Cryostat : 60 mm He envelope : 50 mm SC part: 2 layers MgB 2 (Bi2212)150x  1mm Cu inner core 40 mm Cooling hole: 10 mm Cryostat : 60 mm He envelope : 50 mm SC part: 2 layers MgB 2 (Bi2212)150x  1mm Cu inner core 40 mm Cooling hole: 10 mm 20 mm thick shield around cable Gaps: 2 x V30xH60 mm 20 mm thick shield around cable Gaps: 2 x V30xH60 mm

Possible arrangement LER for e + e GeV 4 magnets, 8 channels 4 channel P = 44 MW (say 50) LER p-p injector 1 Magnet, 2 channels T op 10 K; P cryostar < 10 MW If useful the second magnet is powered as return line T BS : 100 K ? ; P = 2x25 MW Photon stoppers are a must Use of 1 or 2 channels for e ring for a 150 GeV e - vs TeV p e - vs. Ions is also possible LER for e + e GeV 4 magnets, 8 channels 4 channel P = 44 MW (say 50) LER p-p injector 1 Magnet, 2 channels T op 10 K; P cryostar < 10 MW If useful the second magnet is powered as return line T BS : 100 K ? ; P = 2x25 MW Photon stoppers are a must Use of 1 or 2 channels for e ring for a 150 GeV e - vs TeV p e - vs. Ions is also possible

Few preliminary considerations Probably different optimization is possible for the channels used as collider at flat top and the ones used as synchrotrons for continuous injections Relatively fast cycle (Hz) seems possible Very rough cost of the LER magnets (no cryo): <500 MCHF for 2 magnets (4 channels) If the TLEP is to be pursued before VHE-LHC and if there is an interest for HE-LHC anyway in // one can install HE-LHC (27 TeV) meanwhile installing TLEP, and then re-use the HE-LHC magnets and cryo-system for VHE-LHC (saving 1/3).

16 In principle a plan for all is possible (for LHC exploitation): is critical time According to Physics needs, the 80 km tunnel can: – Be alternative to HE-LHC – Or complementary to HE-LHC – Accomodating at moderate extra-cost TLEP and VLHeC – Skipping HE-LHC, TLEP/VLHeC may shorten 5-10years VHE-LHC 28Jan2013