Synergy Distributed Meeting Scheduler High Fliers.

Slides:



Advertisements
Similar presentations
Synergy Distributed Meeting Scheduler(SDMS) TEAM:4 Rutvij Mehta Shruti Mehta Shveta Mupparapu Meghna Swetha Raguraman Rakesh Sanapala Venkata Jaganadh.
Advertisements

The Complete Administration System for the Domiciliary Care Provider.
Improving the way we learn
Paperless Online Payroll, Integrated HR & Report Generating System.
Architecture Decision Group Group Organization & Processes April 7, 2015 | Tuesday.
Project Presentation-Phase 2 Requirements Elicitation Specification Validation T ERA S OFT D ISTRIBUTED M EETING S CHEDULER Team Blitzkrieg: ADITYA DHAMANKAR,
Chapter 14 Requirements and Specifications. Copyright © 2005 Pearson Addison-Wesley. All rights reserved Software Engineering The implementation.
Week 2 Lecture 2 Structure of a database. External Schema Conceptual Schema Internal Schema Physical Schema.
Network security policy: best practices
CORE 1: PROJECT MANAGEMENT Overview TECHNIQUES FOR MANAGING A PROJECT Communication Skills Active Listening Mirroring Paraphrasing Summarizing Clarifying.
Phase II Instructor: Dr. Lawrence Chung Rachel Bock, Ruben Cavazos, Chih-Lin Cheng, Victor Isbell, Swathi Kandimalla, Nikhil Mishra, Amy Polcari, Ramon.
IPortfolio assignment Mandatory Unit evidence. Centres may use some or all of these activities or some of their own devising to help candidates complete.
M EETING S CHEDULER S YSTEM Team Members: Aaron Tull Rachel Weldon Derek Horner.
Web Development Process Description
Gregor v. Bochmann, University of Ottawa Based on Powerpoint slides by Gunter Mussbacher with material from: Wiegers: Software Requirements, Chapter 5.
Dineshwari Byrappa Nagraj Rashi Gupta Shreya Modi Swati Satija Magesh Panchanathan.
Page 1 ICT in Time Management Grade 11 ICT Mrs. Ghazaal.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
Presented by Vinit Patwa Prasanna Kumar Thiagarajan Shiva Sangam Meghana Satpute Azharuddin Mohammed Ritesh Patel Tarun Chandra Samireddy Rutvij Desai.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
SDMS Project Phase Ⅰ Duk-Jin Kim Tu Peng Yan Shi.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Eric Anderson Liga (Li-Chia Kuo)‏ Elodie Mambounou José Perez Daniel Qi Le Qiao (Joe)‏ Arturo Saracho Russell Smith Josh Wu Tech-9 Members Advanced Requirements.
Project Scope N EXT L EVEL Consulting TEAM I Roman HamediSean Griffin Tierny MirandaKrystal McDonald Richard RohrmanSam Thakkar Lydia Watts.
Synergy Distributed Meeting Scheduler Phase I interim report.
Synergy Meeting Scheduler System GeetanjaliJeffYogita.
Meetings Lesson 6 Documentation The main documentation for meetings are an agenda and minutes.
Synergy™ Distributed Meeting Scheduler Organize meetings with SDMS SynergySoft, Inc. presents:
Synergy Meeting Scheduler System T-squared, S-cubed TJ Andrews Thriveni Movva Sadequa Azam Sama Malik Scott Denson.
Presented by Michael Hale Nelson Lopez Malini Srinivasan Sai Prasanth Sridhar Wanjun Huang Limin Tang Rutvij Desai.
Professional video communications Outlook/Exchange Scheduler for Codian.
User Management. Basics SDMS shall maintain a database of all users. SDMS shall maintain a database of all users. SDMS shall not limit the number of registered.
How to schedule on RBHA.NET Select Request Form. Login Full name and NARBHA .
Phase 1 Interim Instructor: Dr. Lawrence Chung Rachel Bock, Ruben Cavazos, Chih-Lin Cheng, Victor Isbell, Swathi Kandimalla, Nikhil Mishra, Amy Polcari,
Meeting Scheduler Carl Fernandes Mahbubur Rahman Haque Muaz Jamshed Rahul Kotian Ramakrishnan Jayavelu Sujith John Zachariah Interim Presentation -2 on.
Processing and Resolving the Incident
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
Registration Solutions for your Event Management.
Presented by –Call of Duty School of Requirement Engineering University of Texas, Dallas Web Meeting Scheduler System System Requirement Specification.
 SAP AG 2007, SAP CSUN 2007 Conference Presentation / 1 Presented by Team “Call of Duty” 29 th April 2010 CS 6361, University of Texas At Dallas.
1 Efficient- Flexible- Cost Effective. 2 The key is to ensure that your clients have a positive experience remotely irrespective of the process you wish.
Planning and Scheduling Meetings Using your Outlook Calendar.
SynergySoft™ Distributed Meeting Scheduler Requirements Review Yasaman Haghpanah Ravindra Rudraraju Sowjanya Sakruti Jim Whitaker.
Presented by –Call of Duty School of Requirement Engineering University of Texas, Dallas Web Meeting Scheduler System System Requirement Specification.
NEM201 Week 4 Project Plan Create and complete outstanding items. 01. Front Cover 02. Document details 03. Scope Document 04. Technical Design 05. Creative.
HighImpact Soft Final Presentation Dare Famodimu Eric Deshazer Sergio Loza Scott Willock.
HighImpactSoft 2010 Organizing a Better Future. Agenda Specify Goals ScopeDefinitions Process Model Preliminary Requirements Issues and solutions TraceabilityPrototype.
COMM 3050 – Online Project Update. Project Roles  Organizer Responsible for creating Zoom account technical aspects and posting recorded meeting to S:
TOPSpro Special Topics I: Database Managemen t. Agenda for Module I: Database Management  TOPSpro Backup/Restore Wizard  TOPS-TOPS Import/Export Wizard.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Synergy Distributed Meeting Scheduling System Francisco Puente Arundhati Solapurkar Jung-Chi Lin.
Resource Management Scenario Overview
Cisco WebEx.
Conference Bridge Aria Telecom Solutions Pvt. Ltd.
Standard Operating Procedure
Web Meeting Scheduler System
School/Unit Representatives Meeting September 2016
2010 Organizing a Better Future
Tailor slide to customer industry/pain points
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Business Meetings : Purposes
REQUIREMENTS ENGINEERING
Resource Management Scenario Overview
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Enterprise Requirements Literal
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Corporate Communications Application Areas
Radiopharmaceutical Production
Duk-Jin Kim Tu Peng Yan Shi
Presentation transcript:

Synergy Distributed Meeting Scheduler High Fliers

Deepthi Durgempudi Nithya Bondalapati Mahitha Devalapalle Puneeth Simha Ragavika Tarigopula Siddharth Dhall Sindhura Vallabhaneni Team

Purpose Process Fishbone Analysis Business Use Case Diagram i* Diagram Business Class Diagram Constraints Specification Models Issues and Solutions Addressing Requirement Changes Prototypes Agenda

Develop a software that would help users schedule meetings more easily and intelligently The software should outperform any such system that is currently available in the highly competitive market The software should be adaptable to any application, such as scheduling courses, flights, room assignments at hospitals and hotels, and much more Purpose

Process SADTs

Process SADT –Level 1

Process SADT – Level 2

Process SADT - Level 3

FISHBONE ANALYSIS

problem :Inefficient and time consuming process of scheduling meetings manually Affects: Company work force The impact is :Loss of productive time which in-turn affects the companys productivity. A successful solution: A flexible and efficient system to schedule meetings in a less time consuming manner. Problem Statement

Problem Fish Bone Diagram Unauthorized users may access the meeting information Difficulty in keeping track of the meeting location and meeting date Large number of negotiations Time consuming process of selecting a meeting date that is convenient to all the attendees People are facing many difficulties while Scheduling meetings manually Difficulty in monitoring meetings Difficult to schedule a meeting whenever we want (anytime- 24/7) Difficulty in scheduling meetings if attendees cannot be physically present during the meeting Hard to reflect changing participants constraints

Business Use Case Diagram

I* Diagram

Business Class Diagram

Product SADTs

Product SADT – Level 0

Product SADT – Level 1

Specification Models

System Use Case Diagram

System Sequence Diagram

System Activity Diagram

System Class Diagram

Constraints

Security

Reliability

Maintainability

Issues and Resolutions

What does the term monitor meetings refer to? Solution 1: Record the entire meeting in video format. Solution 2: Record the entire meeting in audio format. Solution 3: Keep a record of meeting minutes. Final Resolution: The first two solutions are out of the control of SDMS. Moreover, the meeting initiator can request for recording equipment while initiating the meeting (or later) if required. Therefore, the third solution has been chosen as the optimal one. Issue 1 – Monitor meetings

How to determine if one meeting is important than the other? Solution 1: The system shall accept an importance rating along with other meeting details from the meeting initiator while scheduling a meeting. When two meetings contend for the same location at the same time, the system shall determine which is more important based on this importance rating. Solution 2: When there is contention for meeting location, the system shall notify the meeting initiators of both the meetings, who can then negotiate external to the system to decide which meeting should be given preference. Final Resolution: The first solution can be misleading, because the importance rating will be based on the perception of the meeting initiator and cannot be considered as a standard. Therefore, the second solution has been chosen as the optimal resolution for this issue. Issue 2 – Need to accommodate a more important meeting

Addressing Requirement Changes

Some meetings are organized and scheduled at the same time, as a chunk, where partial attendance can be allowed. How to allow partial attendance? Solution 1: Participants can specify to the meeting initiator that they will be attending only part of the meeting by adding comments along with acceptance of a meeting invitation. Solution 2: Do not allow partial attendance at all Final Resolution: Since it is possible that a person wants to go to both the meetings scheduled at the same time, solution 1 has been chosen as the appropriate option. Requirement change 1

Meeting locations should be convenient, and information about meetings should be secure. Location Convenience: Already addressed as the system allows important participants to specify their location preferences. Information Security: Since the system shall be accessible by only authorized users, it can be ensured that outsiders cannot access meeting information. Also, one user cannot access the calendar of another user within the system. Requirement Change 2

Prototypes

Prototype – Welcome Page

Prototype – Admin Screen

Prototype – User Login

Prototype – User Functions

Prototype – Meeting Details

Prototype – Initiate Meeting

THANK YOU!!!