Tomeka Williams, Professor Of Business-Cost and Financial Management Defense Acquisition University-CNE “Should Cost” Analysis.

Slides:



Advertisements
Similar presentations
Introduction to the Federal Acquisition Regulations - FAR
Advertisements

1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
OVERSIGHT & COMPLIANCE BRANCH (OCB) PRICE REASONABLENESS TRAINING January 20,
POLICY AND OVERSIGHT DIVISION (POD) February 2014 Documentation of Evaluation for Award 1.
AACEI Contingency Forum Contingency Management
Introduction to Military Certification Office
Contract Pricing Training. Curriculum Modernization Functional Advisor letter of 2001 directed DAU to modernize curriculum: – based on updated competency.
Closeout (Preparing for the End)
4/28/2015 Presented by David McQuay, Jr., CPA 1 Non-Profit Financial Management Florida Non-profit Housing, Inc. Self-help Housing Conference.
Accounting System Requirements The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations 1 Further.
WELCOME! Small Business Boot Camp 3 What are Rates, Build Ups, Pricing and Cost Centers?
DCAA – WHO WE ARE and WHAT TO EXPECT
Congress and Contractor Personal Conflicts of Interest May 21, 2008 Jon Etherton Etherton and Associates, Inc.
National Contract Management Association – Norfolk Chapter Contracting Ground Rules.
Cost Accounting Standards Accounting 6310 Richard McDermott, Ph.D.
1851 State constitution created Indiana’s multi-layered local government system, which is still used today One-size-fits-all approach not applicable today.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Basic Financial Requirements for DoD Government Contracting 2015 National SBIR/STTR Conference The views expressed in this presentation are DCAA's views.
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
Contract Pricing – Certified Cost or Pricing Data
Determine the Difference between Internal and External Cost Reporting © Dale R. Geiger
Chapter 17 Acquiring and Implementing Accounting Information Systems
I n t e g r i t y - S e r v i c e - E x c e l l e n c e PPNM’s/PNM’s Date: 29 Dec 2006.
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
The Brooks A&E Act National Oceanic & Atmospheric Administration Acquisition & Grants Office January 24, 2006.
Fed Acq 101 Speaker: Sterling Whitehead. What does Sterling do? Contract for goods and services Write RFPs and RFQs Translate rocket science into everyday.
Grant Requirement Reminders Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
FAR Part 2 Definitions of Words and Terms. FAR Scope of part (a)This part – (1) Defines words and terms that are frequently used in the FAR; (2)
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
GWAC Ordering Procedures Overview
Nuts and Bolts of Government Accounting
How to Prevent Findings Part 2 Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Documenting the Participation of Fishing Vessel Crew Members in Alaska’s Commercial Fisheries Documenting the Participation of Fishing Vessel Crew Members.
Courses that Meet Government Contractor Needs
COMPETITION REQUIREMENTS
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
1 Always Changing / Always Challenging Accounting for Government Contracts.
PERT Overview Federal Perspective Annual PERT Workshop February 7-9, 2012 Nevada Site Office Evelyn Landini, Contracting Officer Brookhaven Site Office.
FAR Part 31 Contract Cost Principles and Procedures.
Don Mansfield Professor of Contract Management Defense Acquisition University.
U.S. DEPARTMENT OF LABOR EMPLOYMENT AND TRAINING ADMINISTRATION ARRA GREEN JOB AND HEALTH CARE / EMERGING INDUSTRIES NEW GRANTEE POST AWARD FORUM JUNE.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
1 Internal Audit. 2 Definition Is an independent activity established by management to examine and evaluate the organization’s risk management processes.
Monitoring Region 3 Discretionary Roundtable May 20 – 23, 2008 Mary Evans And Conyers Garrett EMPLOYMENT AND TRAINING ADMINISTRATION UNITED STATES DEPARTMENT.
Pricing Services Contracts Air Force Materiel Command Bill Sain HQ AFMC/PKPC DSN I n t e g r i t y - S e r v i c e - E.
14-1 CHAPTER 14 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Analysis for Planning.
1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Introduction to Procurement for Public Housing Authorities Independent Cost Estimates and Cost/Price Analyses Unit 3.
1 Services Contracting in the DoD: An Empirical Analysis of the Use of a Project Management Approach Breakout Session # D14 Dr. Rene G. Rendon, CFCM,
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
Presented to: By: Date: Federal Aviation Administration Ready for Cost Type Contracts - Accounting Systems and Administration Small Business Vendor Day.
“Should Cost” Analysis
FAR Part 2 - Definitions of Words and Terms
The Administration’s Small Business Agenda
“Should Cost” Analysis
Administrivia Settings Controls Attendees Record
2015 Leadership Conference “All In: Achieving Results Together”
Internal and Governmental Financial Auditing and Operational Auditing
Costs and Economics of Construction
(Additional materials)
BUS 315 Education for Service-- snaptutorial.com.
BUS 315 Teaching Effectively-- snaptutorial.com
A Pricing Perspective on Contract Cost/Price Analyst
Certified Cost or Pricing Data vs
Presentation transcript:

Tomeka Williams, Professor Of Business-Cost and Financial Management Defense Acquisition University-CNE “Should Cost” Analysis

Society of Cost Estimating Glossary SHOULD COST A concept of contract Pricing that employs an integrated team of Government Procurement cost and price analysts, contract administration, auditors, and Engineering representatives to conduct a coordinated, indepth Cost review and Evaluation of a program at the contractor's plant. Its purpose is to identify uneconomical or inefficient practices in the contractor's management and operations, to quantify the findings in terms of their impact on cost, and to develop a realistic price objective for Negotiations or for the program that reflects the results of the shouldcost effort. SHOULD COST ESTIMATE An Estimate of contract price which reflects reasonably achievable contractor Economy and Efficiency, and is developed by a Should Cost analysis at a contractor's plant.

Should Cost Estimate Addresses costs of specific contracts, not a full life-cycle costs. Purpose: Identify uneconomical or inefficient practices in contractor’s management or operation Quantify findings in terms of cost Develop a realistic price objective for negotiation or for the program that reflects the should cost effort Definition: Taken from the National Estimating Society Dictionary, Fall 1986

Should Cost Estimate, continued Typically employ two teams Production Overhead Teams work together to evaluate and challenge a contractor’s existing methods, materials, facilities, work force, management, and operating procedures Based on contractor’s proposal Results can be used to negotiate new Forward pricing Agreements

Should Cost Review –FAR Should-Cost Review. (a) General. (1) Should-cost reviews are a specialized form of cost analysis. Should-cost reviews differ from traditional evaluation methods because they do not assume that a contractor’s historical costs reflect efficient and economical operation. Instead, these reviews evaluate the economy and efficiency of the contractor’s existing work force, methods, materials, equipment, real property, operating systems, and management. These reviews are accomplished by a multi-functional team of Government contracting, contract administration, pricing, audit, and engineering representatives. The objective of should-cost reviews is to promote both short and long-range improvements in the contractor’s economy and efficiency in order to reduce the cost of performance of Government contracts. In addition, by providing rationale for any recommendations and quantifying their impact on cost, the Government will be better able to develop realistic objectives for negotiation. (2) There are two types of should-cost reviews -- program should-cost review (see paragraph (b) of this subsection) and overhead should-cost review (see paragraph (c) of this subsection). These should- cost reviews may be performed together or independently. The scope of a should-cost review can range from a large-scale review examining the contractor’s entire operation (including plant-wide overhead and selected major subcontractors) to a small-scale tailored review examining specific portions of a contractor’s operation.

Should Cost Review –FAR (b) Program should-cost review. (1) A program should-cost review is used to evaluate significant elements of direct costs, such as material and labor, and associated indirect costs, usually associated with the production of major systems. When a program should- cost review is conducted relative to a contractor proposal, a separate audit report on the proposal is required. (2) A program should-cost review should be considered, particularly in the case of a major system acquisition (see part 34), when -- (i) Some initial production has already taken place; (ii) The contract will be awarded on a sole source basis; (iii) There are future year production requirements for substantial quantities of like items; (iv) The items being acquired have a history of increasing costs; (v) The work is sufficiently defined to permit an effective analysis and major changes are unlikely; (vi) Sufficient time is available to plan and adequately conduct the should-cost review; and (vii) Personnel with the required skills are available or can be assigned for the duration of the should-cost review. (3) The contracting officer should decide which elements of the contractor’s operation have the greatest potential for cost savings and assign the available personnel resources accordingly. The expertise of on-site Government personnel should be used, when appropriate. While the particular elements to be analyzed are a function of the contract work task, elements such as manufacturing, pricing and accounting, management and organization, and subcontract and vendor management are normally reviewed in a should-cost review. (4) In acquisitions for which a program should-cost review is conducted, a separate program should-cost review team report, prepared in accordance with agency procedures, is required. The contracting officer shall consider the findings and recommendations contained in the program should-cost review team report when negotiating the contract price. After completing the negotiation, the contracting officer shall provide the ACO a report of any identified uneconomical or inefficient practices, together with a report of correction or disposition agreements reached with the contractor. The contracting officer shall establish a follow-up plan to monitor the correction of the uneconomical or inefficient practices. (5) When a program should-cost review is planned, the contracting officer should state this fact in the acquisition plan or acquisition plan updates (see subpart 7.1) and in the solicitation.subpart 7.1

Should Cost Review –FAR (c) Overhead should-cost review. (1) An overhead should-cost review is used to evaluate indirect costs, such as fringe benefits, shipping and receiving, real property and equipment, depreciation, plant maintenance and security, taxes, and general and administrative activities. It is normally used to evaluate and negotiate an FPRA with the contractor. When an overhead should- cost review is conducted, a separate audit report is required. (2) The following factors should be considered when selecting contractor sites for overhead should-cost reviews: (i) Dollar amount of Government business. (ii) Level of Government participation. (iii) Level of noncompetitive Government contracts. (iv) Volume of proposal activity. (v) Major system or program. (vi) Corporate reorganizations, mergers, acquisitions, or takeovers. (vii) Other conditions (e.g., changes in accounting systems, management, or business activity). (3) The objective of the overhead should-cost review is to evaluate significant indirect cost elements in-depth, and identify and recommend corrective actions regarding inefficient and uneconomical practices. If it is conducted in conjunction with a program should-cost review, a separate overhead should-cost review report is not required. However, the findings and recommendations of the overhead should-cost team, or any separate overhead should- cost review report, shall be provided to the ACO. The ACO should use this information to form the basis for the Government position in negotiating an FPRA with the contractor. The ACO shall establish a follow-up plan to monitor the correction of the uneconomical or inefficient practices.

When to do a Should Cost Estimate Some initial production has already taken place The contract will be awarded on a sole-source basis There are future year production requirements for substantial quantities of like items The items being acquired have a history of increasing costs The work is sufficiently defined to permit an effective analysis and major changes are unlikely Sufficient time is available to plan and conduct the should cost analysis adequately Personnel with the required skills are available or can be assigned for the duration of the should cost analysis

REFERENCES Burt, David. (2010) Should Cost. AFIT. Retrieved on September 29, 2010 from oct/burt.html oct/burt.html DAU (2010) BCF 204: Intermediate Cost Analysis, Chapter 1. pp 8-9. SEER. Should Cost Modeling: Taking the Guesswork Out of What a Project Should Cost. Retrieved on September 29, 2010 from Should Cost / Should Cost Estimate Definition. Retrieved on September 29, 2010 from FAR Should Cost Review. Retrieved on September 29, 2010 from 83_ _ US. Army Material Command. Should Cost Analysis Manual. Retrieved on September 29, 2010 from bin/GetTRDoc?AD=AD746253&Location=U2&doc=GetTRDoc.pdfhttp:// bin/GetTRDoc?AD=AD746253&Location=U2&doc=GetTRDoc.pdf

Further Information Armed Service. Procurement Regulations (C). Department of Defense, Raymond E. Harris “Should Cost,” briefing presented at 1970 DCAS Pricing Conference Proceedings, October “Recent Development and Future Trends In Government Contract Accounting,” The Federal Accountant, XIX. 3 (September 1970), 26. “Should Cost Is the New Weapons Test,” Business Week, May 30, 1970, pp Dr. Fred W. Forman, lecture notes on Should Cost used in Defense Weapon Systems Management Course, Wright. Patterson AFB, Ohio.