Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.

Slides:



Advertisements
Similar presentations
NERC Footnote b / 12 – Load Loss
Advertisements

GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
Cleco Transmission Planning Summit 2013
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Designation Process (EB ) and East-West Tie Line (EB ) March 23, 2012.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
Entergy Transmission Planning Summit New Orleans, LA July 10, 2003
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
2008 Transmission Expansion Plan Updates Tom Seeley, E.ON U.S.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting December 16, 2009.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
1 Transmission Advisory Group Meeting January 25, 2007 Raleigh, NC.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
A Presentation On 132 KV GSS BEHROR
Distribution Systems-General
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
1 Entergy Gulf States, Inc. (Texas) Approved & Proposed Transmission Reliability Projects Entergy/ETEC Subcommittee Meeting The Woodlands, TX November.
Freeport Area Master Plan Project
Barrilla Junction Area Transmission Improvements Project
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Subteam 1a Competitive Solicitations Framework Working Group Meeting
I-5 Corridor Reinforcement Project
Presentation transcript:

Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions

Southwest RI Transmission Supply Study Study initiated in 2001 due to recognition of voltage and thermal concerns. Identified Short-term and Long-term upgrades to ensure reliability of service. SWRI area supplied primarily by 115 kV lines looped between Kent County in RI and Montville in CT.

Geographic Location of Southwest RI New England Power Company Map redacted due to Critical Energy Infrastructure Information Available upon request

Southwest RI Area Reliability Concerns Voltage Concerns – Loss of G-185S – Voltages drop to unacceptable values of less than 0.9 p.u. and potential collapse Thermal Concerns – Loss of 1280 – G-185S overloads over STE rating for loss of 1280.

Existing Concerns New England Power Company Map redacted due to Critical Energy Infrastructure Information Available upon request

Short-term Upgrades Short Term upgrades addressed immediate voltage concerns – 7 distribution station capacitors – total of 38.7 MVars – In service for Summer 2003 Other Actions – Planned G-185S Uprate for Summer 2005

Recommended Solution New England Power Company Map redacted due to Critical Energy Infrastructure Information Available upon request

West Kingston Substation

Recommended Solution Extend L-190 from Davisville Tap to West Kingston substation (2007) – Total of 12.3 miles ACSR – Install load break switch at Davisville Tap – Total $6.0M Connect L-190 at West Kingston substation (2007) – Install new 115 kV bus structure – Install 2 nd Breaker and two disconnect switches – Reterminate T2 transformer to L-190 for better load management – Replace existing breaker and disconnect switches at West Kingston substation – Install motor operated air break switch on L-190 within substation fence. – Replace air break switch on G-185S with a motor operated air break switch within substation fence – Total $2.6M

Recommended Solution (contd) Reconductor L-190 from Kent County to Davisville Tap (2007) – 2 miles of 795 AAC on single circuit towers reconductored to 1590 ACSR (2007) – 3.26 miles of 795 ACSR on DCT reconductored to 1113 ACSR (2007) – Total $1.9M Future Upgrade: Reconductor G-185S from Kent County to Davisville Tap by 2012 – 2 miles of 795 ACSR on single circuit towers reconductored to 1590 ACSR – 3.26 miles on DCT reconductored to 1113 ACSR – Total $2.0M Total $14.6M – TCA Application $10.5M – Short Term Completed Non-PTF $ 2.1M – Future Work $ 2.0M

Other Alternatives Studied Alternative 2 – 115 kV Capacitors (6x10 MVAr) – Reconductor G-185S from Davisville Tap to West Kingston to 795 ACSR (2006) – Reconductor G-185S from Kent County to Davisville Tap with 1113 ACSR and 1590 ACSR (2008) – Additional Reinforcement Reqd by 2016 – Estimated Total $15.7M Alternative 3 – FACTS Devices (60 MVAr) – Reconductor G-185S from Davisville Tap to West Kingston to 795 ACSR (2006) – Reconductor G-185S from Kent County to Davisville Tap with 1113 ACSR and 1590 ACSR (2008) – Additional Reinforcement Reqd by 2016 – Total $19.9M

Other Alternatives Studied (contd) Alternative 4 – 345 kV line Kent County to Montville – Total $108.1M

Assessment of Alternatives Recommended L190 Alternative : – Technically Superior to Alternatives 2 and 3 – Economically preferred – least cost – Future Expansion – in-line with long term plans to continue 2 nd 115 kV tie into Connecticut. – Potential operational impacts during construction – less impact than Alternatives 2 and 3. – West Kingston substation will contain new standard equipment for additional breaker and replacement of existing breaker and switches. Alternatives 2 and 3 – Switching voltage variations are an issue on weak system Alternative 4 – Cost excessive for local needs – Longer construction time

Upcoming Applications New England Power Company Map redacted due to Critical Energy Infrastructure Information Available upon request