Old Way to View an Organization Customers are implicit. The organization will succeed if everyone does his or her job as directed. Quality is an event.

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

Quality Tools and Techniques Standards in Action Quality Tools and Techniques Practicing quality techniques Author:
Chapter 6 - Statistical Process Control
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
Nursing Home Falls Control Chart Problem Statement: Assume that following data were obtained about number of falls in a Nursing Home facility. Produce.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Eight Basic Quality Improvement Tools – Part 2 Quality Engineering and Quality Management 1 © University of Wisconsin-Madison.
Agenda Review homework Lecture/discussion Week 10 assignment
Control Charts  Control Charts allow a company’s performance over time to be analyzed by combining performance data, average, range and standard deviation.
Chapter 18 Introduction to Quality
Introduction to Control Charts.
originally developed by Walter A. Shewhart
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Statistical Process Control
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
T T20-06 Control Chart (with Runs Tests) Purpose Allows the analyst create and analyze a "Control Chart". A visual analysis of the control time.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Statistical Process Control
Control Charts.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
X AND R CHART EXAMPLE IN-CLASS EXERCISE The following collection of data represents samples of the amount of force applied in a gluing process: Determine.
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 16 Improving.
1. Statistics 2. Frequency Table 3. Graphical Representations  Bar Chart, Pie Chart, and Histogram 4. Median and Quartiles 5. Box Plots 6. Interquartile.
Statistical Process Control
TTMG 5103 Module Techniques and Tools for problem diagnosis and improvement prior to commercialization Shiva Biradar TIM Program, Carleton University.
Process Capability and SPC
1 DSCI 3123 Quality Management and SQC Outline Quality Control –Definition of Quality –Commonly Used Terms –TQM –Seven QC tools –Variance reduction –Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Welcome to MM305 Unit 8 Seminar Prof Greg Statistical Quality Control.
Introduction to Control Charts: XmR Chart
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
Business Statistics: A First Course, 5e © 2009 Prentice-Hall, Inc. Chapter 14 Statistical Applications in Quality Management Business Statistics: A First.
Table of Contents 1. Standard Deviation
2.6 Special Functions Step functions Greatest integer functions Piecewise functions.
Problem Solving.
Objectives The student will be able to:  use Sigma Notation  find the mean absolute deviation of a data set SOL: A
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 14-1 Chapter 14 Statistical Applications in Quality and Productivity Management.
T T Population Confidence Intervals Purpose Allows the analyst to analyze the difference of 2 population means and proportions for sample.
Organize verbal information into a visual one, generally by writing down on separate pieces of paper AFFINITY DIAGRAM A sequenced plan.
Lesson 3 Stabilize the Process. Lesson 3 Stabilize the Process.
Quality Control  Statistical Process Control (SPC)
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
Alicia, Nicole & Jason.  Review  The Basics  Terms & Concepts  Statistical Measure  Example  Homework.
| +44(0) © ICE LTD 2009 All rights reserved. August 2009 version 1.3 Systems Thinking Facilitators.
© 1998 Prentice-Hall, Inc. Statistics for Managers Using Microsoft Excel, 1/e Statistics for Managers Using Microsoft Excel Statistical Applications.
Section Copyright © 2014, 2012, 2010 Pearson Education, Inc. Lecture Slides Elementary Statistics Twelfth Edition and the Triola Statistics Series.
Internal Process Model Monitor Role Competency: Managing Collective Performance.
Welcome to MM305 Unit 8 Seminar Prof. Dan Statistical Quality Control.
1 Chapter 14 StatisticalProcessControl The Management & Control of Quality, 7e.
Establishing baselines Detecting a Trend What to do following a Trend How to re-baseline Life Cycle of a Trend.
Quality Management and SQC
Control Charts Definition:
PROCESS CAPABILTY AND CONTROL CHARTS
How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
Chapter 7 Process Control.
Introduction to Quality and Statistical Process Control
Process Capability and Capability Index
Statistical Process Control (SPC)
The LIFE Platform Sarah Leng Improvement Manager.
X AND R CHART EXAMPLE IN-CLASS EXERCISE
Control Charts for Attributes
Agenda Review homework Lecture/discussion Week 10 assignment
The LIFE Platform Sarah Leng Improvement Manager.
Higher National Certificate in Engineering
Statistics for Business and Economics
IENG 484 Quality Engineering LAB 3 Statistical Quality Control (SPSS)
BENEFITS OF AUTOMATED SPC
Risk Adjusted P-chart Farrokh Alemi, Ph.D.
Module 3 Part 3 Developing and Implementing a QI Plan: Tools and Techniques Adapted from: The Health Resources and Services Administration (HRSA) Quality.
Presentation transcript:

Old Way to View an Organization Customers are implicit. The organization will succeed if everyone does his or her job as directed. Quality is an event resulting from individual (or team) effort. The traditional view of the of the organization focuses on pleasing the managers and controlling the workforce:

Deming’s Systems View The systems view of the organization focuses on pleasing the customers and improving the systems, processes and methods by which we create and deliver goods and services to the customer.

Management is implicit. Quality is the net result of the interaction of the system. The steps of the system are interdependent. For the output to be improved the system must be improved. Deming’s Systems View

A System of Activities to Focus the Library on Continuous Improvement

Process Behavior Charts

Studying Processes Run Chart

A Run Chart visually represents data over time or in sequence. Why is it used? Shows variation in a process Shows the average of the data When should I use it? To see trends and shifts in the data To present data as input for a Process Behavior Chart To monitor progress after making changes in a process

Studying Processes Process Behavior Chart A Process Behavior Chart is a graphic tool used to study variation in a process over time. Helps leaders determine whether and when to take action Assists library board members, administrators, and staff in learning about and measuring variation in library processes Identifies and distinguishes common and special causes of variation in a process Allows organizations to make predictions about what will occur in the future Provides a visual picture that helps employees improve processes by eliminating special causes of variation, reducing common causes of variation, and raising or lowering the average outcome to better meet customer needs

Studying Processes Process Behavior Chart 1.Begin by filling out the initial data at the top of the X and Moving Range Chart page for your process similar to the example. 2.Write down the data points (X’s) for the most recent 20 – 25 measurements. If you have fewer points, use what you have. 3.Choose an appropriate scale and plot and connect the points on the X/Sample graph. Remember to leave space for the upper and lower natural process limits.

Studying Processes Process Behavior Chart 4.Calculate the moving ranges (MR’s). Find the difference in value between the first and second X and pencil it into the Moving Range (MR) row. Do the same for points 2 and 3, 3 and 4, etc. Note that it is the absolute difference between the numbers that is important. Therefore don’t worry if you get a negative number. Write it down as a positive number. Choose an appropriate scale and plot the points on the Range chart at the bottom of the page. 5.Calculate the average MR (MR bar). Add up all the MR values and divide the total by the number of MR’s to get MBbar. Place the MRbar value in the blank at the top of the page, and draw a dashed horizontal line at that value on the Range chart

Studying Processes Process Behavior Chart 6.Calculate the Upper Control Limit for the Moving Ranges (UCL MR ) by substituting into the following formula: UCL MR = MRbar x Write this value in the blank at the top of the page. 7. Check for special causes in X’s. Are any MR’s greater than the UCL MR ? If yes, delete the X that is out of whack and calculate a new MRbar and a new UCL MR. If no, continue to calculate the standard deviation (S). 8. Calculate the standard deviation, S, as follows. S = MRbar final divided by Write the value of S in the blank at top of page.

Studying Processes Process Behavior Chart 9.Calculate the average of the X’s (Xbar). Find the sum of all the X’s and divide that total by the number of X’s. Write this value in the blank at the top of the page, and draw a horizontal line on the X/SAMPLE chart at the value of Xbar. 10.Calculate the Upper Control Limit for the X’s (UCL X ): UCL X = Xbar + 3S Draw a dashed horizontal line on the X/SAMPLE chart at the value of the UCL X 11.Calculate the Lower Control Limit for the X’s (LCL X ): LCL X = Xbar – 3S Draw a dashed horizontal line on the X/SAMPLE chart at the value of the LCL X

Studying Processes Process Behavior Chart 12.Analyze what your process is telling you. Is the process in-control or out-of-control? Is there a great deal of variation? Is the average higher or lower than your customers expect? Is your process getting better, getting worse, or staying about the same? Does your process go through cycles?