1 Making buildings better Building Tight Chris Knights.

Slides:



Advertisements
Similar presentations
kareRCIserIsviFIsaRsþGnuvtþKMerag
Advertisements

Orthogonal Projection
Section 6: Heat Transfer - Part II ENV-2D02 (2006):Energy Conservation – power point versions of lectures. Will be available on WEB later in Week 1Introduction.
Construction Explanation.
Dr. Ruth Collins TrinityHaus
TRONCO BUILDING SUPERSTRUCTURES IN HAITI
Presents 2012 Revisions to the NC Energy Code For Residential Building started after March 1, 2012.
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2J: Building.
Passive house. Definition A Passive house is a buildings with good comfort conditions during winter and summer, without traditional space heating systems.
Identifying and Air Sealing the Building Envelope
HEAT LOSS & HEAT GAIN HEAT FLOW. Heat flows from high temperature to low temperature There are 3 types/methods of heat flow/transfer: 1.Conduction- through.
The builders experience – mere compliance to enhanced performance Sustainable new homes and sound insulation conference Dave Poole.
Thermal Bridges in new Dwellings..... Accredited details – Designing & detailing for Compliance Danny Kearney Main changes to Part F for dwellings.
Why blower door testing? Measure leakage Detect sources Verify fixes Click your mouse to continue to next slide.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Building Science Basics WEATHERIZATION INSTALLER/TECHNICAN FUNDAMENTALS.
Tom Dollard Head of Sustainability Pollard SME Builder’s Book Consultation.
Fitting Door Frames To Cavity Brickwork & Brick Veneer Your Ref: from P11 of text M.S.Martin Sept 2005 M.S.Martin Sept 2005.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
Walls Ron Gatepain constructionsite.
ENERGY STAR In the World of Green. ENERGY STAR FOR HOMES GROWTH THE ROAD TO ONE MILLION HOMES Number Labeled Homes Year ,000.
WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM Overview Introduction to the Weatherization Assistance Program Communication Skills House as.
1 Thermography of Buildings Stacey Ward - BSRIA Instrument Solutions - - Sales Manager -
1 ISAT Module III: Building Energy Efficiency Topic 6:Stead-State Building Loads z Fabric Loss z Ventilation Loss z Environmental Temperature z Steady-State.
Improving Energy Efficiency in Traditional Buildings Moses Jenkins Technical Conservation Group.
Construction Cost Estimating Class #7 - Masonry Prof. Ralph V. Locurcio, PE.
After the foundations have been completed the walls are set out and construction commences. wall structures.
Chapter 19 Floors.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Chapter 4: Air Leakage Control: Materials and Techniques
Topic C1 Superstructures - walls
Masonry Details.
Adriana Galue Wolfgang Custom Finishes HOME ENERGY STATS Biggest energy consumers Space heating – 34% Appliances and lighting – 34% Refrigerator.
RADIATION PROTECTION IN DIAGNOSTIC AND INTERVENTIONAL RADIOLOGY
Summary of Energy Star Site Inspection July 11, 2007
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
Part 2: Buildings as a System Lee F. Ball Jr., PhD
Improving smoke control and protecting lives Air Sealing Industrial, Commercial, Institutional and Multi-Family Buildings to Improve Smoke Control.
Competency: Draw wall sections and details
Air Movement and Natural Ventilation
Science Project Advice on how to reduce energy losses.
Weathertightness of buildings is complex. We not only need to keep water out. We also need to let water out. A ventilated space presents a much smaller.
The Basler building The Basler building is situated in the city centre of Basel. This 10 storey, naturally- ventilated building, was built in The.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
SELECTING INSULATION MATERIALS  Insulation can serve as more than just an energy barrier, providing fire resistance, humidity control, and noise reduction.
Name ________________ Unit 6/P6 – Traditional Construction Most common foundation = strip Damp Proof Course 150mm above ground level External Walls are.
 Effective height of walls  The effective height of a loadbearing wall is assessed by allowing for the relative stiffness of the elements of structure.
Chapter 21 Building Sections. Chapter 21 Building Sections.
Natural Ventilation Ar. Medha Deshmukh. Masters in Environmental Architecture.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
GRAPHIC STANDARDS. LETTERING CAPITAL letters only Consistency (Neat) Three sizes 3/8” FOR TITLE BLOCK 1/4” FOR TITLES WITHIN DRAWING 1/8” FOR CABINET.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
When drawing your plan, try and add as much detail as you can, labelling different features, such as double glazed windows and cavity walls. Draw two.
Learning Outcome Lesson Objective
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
8. VENTILATION  When there is a difference between outdoor and indoor temperature, ventilation can be accomplished by natural means. Strategically placed.
土木工程概论 Introduction to Civil Engineering 第四章 建筑工程 Chapter 4 Building Engineering.
Energy loss in the home Insulation method including cost and saving
Fire Blocking Requirements For All Buildings;
Energy loss in the home Insulation method including cost and saving
Draught Finder Trevor Clark 3. WIND, AIR & VAPOUR BARRIERS Qualified
LEVEL 4 Air Pressure Testing
External Walls Carl James.
Competency: Draw wall sections and details
Wall Openings You will learn about the types and function of wall openings. You will learn about the components parts of each opening and why they are.
Architectural Drafting
Competency: Draw wall sections and details
Section and Details Vocabulary and Basic Information
Chapter 6A: INFILTRATION BACKGROUND
Collapse Patterns.
Presentation transcript:

1 Making buildings better Building Tight Chris Knights

2 Making buildings better What is air leakage? Air leakage is the uncontrolled flow of air through gaps and cracks in the fabric of a building (sometimes referred to as infiltration or draughts). This is not to be confused with ventilation, which is the controlled flow of air into and out of the building through purpose built ventilators that are required for the comfort and safety of the occupants. Air leakage commonly occurs at interfaces between construction elements. Typical locations include: Wall to roof and wall to floor junctions Window and door to wall joints Service penetrations

3 Making buildings better What is air leakage? Air leakage paths are quite often tortuous – air may travel some distance through the building fabric between the points of entry and exit.

4 Making buildings better What is the air line? The air line is normally defined as the element(s) that are used to create the airtightness line. The air line should be decided at design stage It must be continuous around the building It must be possible to slice through the building on any plane and see a continuous air line The air line should be contiguous with the thermal line

5 Making buildings better General Principles of Design & Construction The basic principles of airtightness are: Airtightness is not rocket science, but it doesn’t happen by chance The airtightness strategy should be simple, robust and achievable The building air line should be identified pre-construction and preferably at design stage Responsibility should be given to a nominated individual or team Communication of its importance and relevance is key Responsibility should be given to a nominated individual or team All parties in the process should be involved Common details should be generated It must be clear who is responsible for sealing each element Protocols for checking detailing must be in place

6 Making buildings better Elements - Walls These for the vertical elements of the envelope, some are structural, some not, but all are required to perform an effective barrier between the internal and external space. Best Practice Blockwork used as the air line Soft joint to all other components All penetrations, such as windows, sealed to the airline element Generally, walls should be sealed to the floor and ceiling Traditional Block and Brick Cavity It is the most common wall type, but can also deliver the most variation in airtightness performance. This is mainly as a result of workmanship and the airtightness performance of the block work.

7 Making buildings better Elements - Walls

8 Making buildings better Elements - Walls Common Pitfalls Blockwork sealed to steel beams/lintels, but beams not sealed Blockwork hidden behind internal finishes before penetrations are cut, making access to seal the blockwork difficult Expanding foam used for filling gaps, but this is often performed ineffectively. If used it should be used appropriately and sparingly Mortar seal between wall and beam joint – incorrectly assumes appropriate, mastic seal should be present.

9 Making buildings better Elements – Ceilings/Roofs Plasterboard Plasterboard will commonly form the airline. This may be horizontal, or contain multiple elements for warm roof constructions The more complex the design the more consideration must be given to the continuity on the air line Buildings that a full storey on the top floor are potentially the simplest to design an air seal line for. However they can have significantly more breaks in the line that you might first think. Best Practice The ceiling should be continuous It should be mechanically sealed to the vertical air line All penetrations, such as loft hatches, sealed to the airline element

10 Making buildings better Elements – Ceilings/Roofs Common Pitfalls Significant number of breaks in the airline that are not visible and therefore often not sealed Service penetrations inside internal walls Service penetrations behind boxings Ceiling line often broken at internal walls

11 Making buildings better Elements – Ceilings/Roofs

12 Making buildings better Elements – Ceilings/Roofs

13 Making buildings better Elements – Ceilings/Roofs

14 Making buildings better Elements – Ceilings/Roofs

15 Making buildings better Elements – Ceilings/Roofs