A tradition of excellence TR-821 REV / Restricted Proprietary Information. Marvin Group proprietary rights are included in the information disclosed herein.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

GPS Dispatch & Tracking System
Softricity LLC Advance slides with arrow keys. Without PDMLynx Informal processes based upon excel, access, paper files No consistency across organization.
Quality Assurance U. S. ITER Project Office U.S. ITER Project 1 November 15, 2006 U. S. ITER QUALITY ASSURANCE Gail Okulczyk, Presenter U. S. ITER Quality.
A tradition of excellence TR-823 REV / Restricted Proprietary Information. Marvin Group proprietary rights are included in the information disclosed herein.
AS9102 First Article Inspection Report
Root Cause and Corrective Action Tutorial
Radiopharmaceutical Production
A tradition of excellence TR-824 REV / Restricted Proprietary Information. Marvin Group proprietary rights are included in the information disclosed herein.
WTP Supplier Qualification Process April 19, 2005 Bechtel National, Inc. U.S. Department of Energy.
Intracompany Stock Transfer Scenario Overview
Transition from Q1- 8th to Q1- 9th edition
M N P Onshore & Offshore SHIPBUILDING PROJECTS JSC "KRASNOE SORMOVO" SHIPYARD"
ISO 9001 : 2000.
How to Document A Business Management System
HACCP Manager Software™
PURCHASING 101 HOW TO BEGIN. Is the purchase available from the District Warehouse?  Online catalogs are/will be available on the district web page for.
1 AO Milan 40MM Manufacturing Support Capabilities J. Fine & J. Solgaard January 28, 2004.
Nomad Aviation Employee Training on ISO 9001 – the globally recognized quality management system 1ISO 9001 Training for Employees-Rev. B.
Monitoring, Control & Reporting. The nature of control Develop a structured plan - the “baseline” for control Monitor the plan Assess current and forecast.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
The ISO 9002 Quality Assurance Management System
Stepan Potiyenko ISS Sr.SW Developer.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
11. Purchasing, new product development and quality control
ISO 9000 Certification ISO 9001 and ISO
THE PRINCIPLES OF QUALITY MANAGEMENT. DEFINING QUALITY Good Appearance? High Price? The Best? Particular Specification? Not necessarily, but always: Fitness.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
ROLE OF A REVIEW TEAM LEADER Desi Curry. Journey in to Gateway  RTL for 7 years (National and Local)  First major project in NI to be subject.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 11 Procurement Management Embedding value into the.
A Product of Copyright © ANGLER Technologies AURA – Quality Compliance Monitoring & Process Management System.
Quality Management Systems P.Suriya Prakash Final Mech Vcet
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
From Research Prototype to Production
Industrial Engineering Roles In Industry
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Aviation Maintenance Management
1 Forming Relationships for the Future SUPPLIER RATING PROGRAM Space & Electronics TRW WORKING TOWARDS COMMON GOALS, AND FORMING RELATIONSHIPS FOR THE.
Supply Chain Management Purchasing/Inventory/Materials.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage Receipts.
John Lunardi John Lunardi Director, BCA Supplier Quality
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
Small Business Programs Tatia Evelyn-Bellamy Director Small Business Division Small Business Center February 2016.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
ANNUAL PRODUCT REVIEW Patchara Kootiratrakarn Independent consultant.
Supply Chain Management Principles
Intracompany Stock Transfer Scenario Overview
SUPPLIER RATING PROGRAM
Quality Assurance (Unplanned Inspections) Scenario Overview
Intracompany Stock Transfer Scenario Overview
CEM 515 Process analysis & Improvement
Topics Registration QA Application Improvement Work Queues Work Groups
SUPPLIER RATING PROGRAM
Product Development Scenario Overview
Our Journey towards Supply Chain Excellence Begins Now
SQA01 Guidance Material: FAI Review
Intracompany Stock Transfer Scenario Overview
Order-to-Cash (Specified Products) Scenario Overview
Medical Device Design and Development
“…a Commitment to Extended Partnership…”
CEM 515 Process analysis & Improvement
Presentation transcript:

A tradition of excellence TR-821 REV / Restricted Proprietary Information. Marvin Group proprietary rights are included in the information disclosed herein. Recipient by accepting this document agrees that neither this document, nor the information disclosed herein, nor any part thereof shall be reproduced or transferred to other documents or used or disclosed to others for manufacturing or for any other purpose except as specifically authorized by Marvin Engineering. 1/21/2013 Heidi Smith, Jesse Andrade Supplier Management Overview

TR-821 REV / - 01/21/2014 © The Marvin Group 2013 PAGE 2 Marvin Group Confidential Supplier Quality Closed Loop Management Process Supplier Selection & Approval Supplier Req’ts Flowdown Post Award Review Product Validation Post Delivery

TR-821 REV / - 01/21/2014 © The Marvin Group 2013 PAGE 3 Marvin Group Confidential New Strategic Procurement Organization Objective Transform to Best Value Procurements SAP Integration (One System) Implement Closed Loop Supplier Management Process Co-Located Supplier Management Team

TR-821 REV / - 01/21/2014 © The Marvin Group 2013 PAGE 4 Marvin Group Confidential Supplier Quality Management Process Maintain Best Possible Supply Base Maintain Approved Supplier List (ASL) Supplier Scorecards Matching of Supplier Capabilities (SAP Vendor Process Coding) Delivery/Quality Performance Supplier Segmentation Source Selection based on best value Quality / QMS/Delivery /Cust. Sat. /Small Business Turn Key Legend Green = Process function Blue = Process Enhancement Supplier Selection & Approval

TR-821 REV / - 01/21/2014 © The Marvin Group 2013 PAGE 5 Marvin Group Confidential Supplier Quality Management Process Flow Down All Quality Requirements Provide Supplier Quality Assurance Requirements Insure Program specific Quality and Inspection Requirements are clearly spelled out on the Purchase Orders and Full requirements are defined by Web Page Link Sales Order Flow down for program specific requirements Supplier Req’ts Flowdown

TR-821 REV / - 01/21/2014 © The Marvin Group 2013 PAGE 6 Marvin Group Confidential Supplier Quality Management Process Assure a Quality Product, Delivered on Time Provide Status and Visibility to Programs Provide Technical Liaison Support Assess Requirements Prior to Fabrication Validate Product Quality Conduct Receiving Inspection (SAP Integration) Assess Inspectors Skills and Developing Improvement Plans Improve the skill level of the inspectors and the accuracy in QC Evaluations. Drive QC Performance with Visibility boards Validate AS9102 First Article Developed Pre Screen process for paperwork review Conduct Final Inspection, and/or Testing at Supplier Assess supplier for participation in Self Inspection Program Self Inspection Receiving Inspection Supplier Performance Rating Post Award Review Product Validation

TR-821 REV / - 01/21/2014 © The Marvin Group 2013 PAGE 7 Marvin Group Confidential Supplier Quality Management Process Assess Supplier Assurance Supplier Monitoring Conduct Process/ Product Audits Administer Supplier Performance Rating/ Scorecard Trending Supplier Performance and Identifying Problem Suppliers for Corrective Action Perform Incoming Product Audits on Self Inspection Suppliers Deliver Supplier Training RCCA AS9102 PAP Clause AQL Post Delivery Timely Response to Issues Corrective Actions (SAP Integration) Improved the DMR process Conduct Stock Purge Initiate and Approve Supplier Corrective Action Requests (SCAR) Track and Trend Rejections Develop Supplier Improvement Plans

TR-821 REV / - 01/21/2014 © The Marvin Group 2013 PAGE 8 Marvin Group Confidential Summary Marvin is driving towards closed loop supplier quality management to assure our products meet Marvin Engineering’s highest quality standards Supplier Selection & Approval Supplier Req’ts Flowdown Post Award Review Product Validation Post Delivery