Team SYNERGY in Partnership with Parker PGI

Slides:



Advertisements
Similar presentations
Due Diligence of Technology Mission Critical: The Rocky Research scientist, engineers & mfg specialist are dedicated to assist potential investors in.
Advertisements

Objectives To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process.
Click Mouse to Start Manufacturing …To Reality From Concept...
Kyle Hartmann. RAD was created in response to long lead times and low flexibility Focuses on communication Quicker and better requirements interpretation.
Chapter 7 Process Management.
FCX Performance, Inc.. The Power of One 2 World class flow control solutions built on over 100 years of experience FCX does not run businesses; we provide.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session # 4.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session # 14.
Rapid Action Team Summary Report
Automation (21-541) Sharif University of Technology Session # 5
Interdisciplinary Curriculum Determine a unifying or organizing theme.
PURPOSE OF DFMEA (DESIGN FAILURE MODE EFFECTS ANALYSIS)
Academic Advisor: Dr. Dave Turcic Team Members: Ron Pahle Khoa T. Tran Duc M. Le Thanh Q. Nguyen Shafi Alhajri Sponsoring Company: Edwards Vacuum Ltd.
Ground Scouts P09207 Project Manager: Stewart Wadsworth Faculty Guide: Dr. Sahin Starting: Ending:
Michael Brantley 2, Ryan Ferm 2, Nadia Siddiqui 2, Jason Newton 1, Reginald Scott 1 1 Department of Mechanical Engineering, Florida State University, Tallahassee,
Customer Focus Module Preview
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #19.
Development Processes and Organizations
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
4.1 EbD Human-Centered Design 1 ® ®. Essential Question: ® How can the Human-Centered design model help frame my project and how will all the information.
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 7 Quality and Innovation in Product and Process Design.
Goal: Understand the stages in design process and the role of computer aided design. Objectives: After this chapter, you should understand the following.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
The Design Process Drawing And Design For Production Engineering.
Engineering Design Process
Braking System for a Hospital Bed Approach Calculations Design Team Nicholas Beechnau Aaron Cole Nicholas Nwabueze Matthew Hays Brainstorming sessions.
Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr :
Root Cause Tutorial Page 1 More on Hazard Identification Techniques 1.Identify potential hazards that could threaten the safety of your employees,
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
Applying “Engineering Processes” to solve problems Learning to apply project management systems Tools to manage time and resources Accessing information.
Web Site Redesign Homepage Committee February 2005.
SLED – Design Model. In the Classroom Problem Identification Teachers and students share and read design brief Teachers prompts students by asking:
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
EE/CS 481 Spring February, 2007 University of Portland School of Engineering Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano.
Senior Design II proposal A step-by-Step review. What is Senior Design?  Senior Design is a sequence of two courses during two consecutive semesters.
“Ship the Chip” “Ship the Chip” Packaging Design Production Drawing Fairport High School.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer Science.
Engineering Design Process
SOFTWARE ENGINEERING MCS-2 LECTURE # 4. PROTOTYPING PROCESS MODEL  A prototype is an early sample, model or release of a product built to test a concept.
Your Clear Choice for a Key Strategic Supplier Corporate Profile.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
EML 2023 Portfolio. EML 2023 Department of Mechanical and Aerospace Engineering HW 1 – Three View Drawings 2 Problem 1.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #13.
Chapter 2: Development process and organizations
Robotics Lesson. Standard  ENGR-II-1: Students will learn the concept of invention and innovation.  ENGR-II-5: Students will examine the impacts of.
Overview Participants manufacture a marketable desktop organizer. The team submits a documentation portfolio of the activities and the product made during.
P15051: Robotic Eye Final Review TIM O’HEARNANDREW DROGALISJORGE GONZALEZ KATIE HARDY DANIEL WEBSTER.
HIGH ALTITUDE BALLOON DDF Team Leader: Josh Beighle Group Members: Adam Chen, Aaron Seyfried Faculty Advisors: Dr. John Wu, Dr. Joseph Slater Industry.
Failure Modes and Effects Analysis (FMEA)
AUTOMATED ROD SINGULATION SYSTEM Student: James Welch Concentration: Mechanical Class: ET-494 Spring 2015 Instructor: Dr. Cris Koutsougeras Advisors: Dr.
26 January 2005Team Safety Lock Mailbox1 Team Safety Lock Mailbox ME Week 3 Carlos Alzate Brian Dorton Song Park Varun Sharma Jack Vasko Adam Zurawski.
APQP Five Phase Process
FMEA PROCESS FLOW Determine Causes/ mechanisms failure
Engineering Design Process
MOOG EMA Installation MSD1 - P12251
Apparel management & quality control
EDP and BIOLOGY: A Multi-disciplinary Engineering Challenge
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
Fall 2015 Semester Lecture 2 Getting Started
Lesson 1- Operations Management
Engineering Design Process
Bonneville Power Administration Aerial Line Cart Progress Report
Engineering Innovation
Introduction to the Teacher Education Program (TEP)
And human centered design
IED Product Management Day #2
University Image Logo Midway Review & Update TEAM or INSTITUTION NAME
By: Benjamin G., Candy L., Miranda B., Rovertho B. POE EDHS
Chapter 2: Development process and organizations
Presentation transcript:

Team SYNERGY in Partnership with Parker PGI MINIMUM BLEED VALVE ASSEMBLY Members: Darius Mwalili, Joseph Page and Ashley Burton Industry advisor: Bruce Kasten of Parker PGI Brian Haygood of System Engineering and Laboratories Faculty advisor: TBA Underclassman: Kevin Spiller

TABLE OF CONTENTS Background Objective and Goals Tasks Completed Incomplete Task Cost Analysis Project Management Q&A Session

Objective To determine the root cause and develop a solution to various issues experienced with Parker PGI’s minimum bleed valve assembly. Issues Experienced: Handle mechanism failure Swivel connection issues Handle is moving from the home position at undesirable times. Swivel connection is not securely locking to the tanks during filling operations.

goals Redesign handle to prevent failure at post- production in order to eliminate accidental release Design a locking mechanism for the swivel connection Ensure design follows UL 125 specifications and can be used with current repair kits manufactured by Parker PGI Maintain a fluid release capacity of no more than 7.6 cc’s

Tasks completed 1. Third Design Iterations of Swivel Connection 2. Evaluating the possibility of implementing a spring loaded design to the swivel connection 3. Procurement of Materials 4. Fabrication of design iteration 3

DESIGN ITERATION: Swivel Connection 3

DESIGN ITERATION: Swivel Connection 3

Action items 1. Design iterations • Constant improvements being made 2. Prototypes • Pending Rapid Prototype Machine clearance from Mr. G Taylor • Evaluation of prototypes 3. Fabrication of Final product • Machining of parts • Evaluation

WBS PROJECT TIMELINE DESIGN ORGANIZATION ANALYSIS FABRICATION G-Coding 30% Select and Organize Team Members Examine Current Model Design Concepts 66% Prototype of Swivel 33% Problem Identification Finalize Swivel Design Brainstorm and Finalize Project Idea Tolerance Analysis Finalize Handle Design Solution Machine Swivel (Final Design) Product Research DFMEA Analysis 80% Cost and Market Analysis Material Selection CFD Analysis 75% Risk Assessment Legend: Complete In Progress Not Initiated

Team website: uhteamsynergy.com Q&A Team website: uhteamsynergy.com