Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Installing the UV Lamp.

Slides:



Advertisements
Similar presentations
Lockout/Tagout Awareness Training
Advertisements

Let’s Learn the parts of the Sewing Machine.
General Safety Overview and Information
USING THE OXYACETYLENE CUTTING TORCH
Engineer Training Machine Electrical Cabinet TJ8300 / TJ8500 Machine Electrical Cabinet (EC)
Peterson Product Support
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Introduction. Introduction: Things to Prepare before Assembly Anti-static wrist strap Set of screwdrivers and pliers Piece of cloth CPU Thermal compound.
Engineer Training UV Lamp Head TJ8300 / TJ8500 UV Lamp Head.
DS1000B-RM/ DS1500B-RM Battery Replacement Procedure.
SQ40i (Individual Sequin Device) Check List SQ40i (individual Sequin Device) Sunstar Precision Co.,Ltd.
Equipment for Assembly Fluke Multimeter 115 True RMS Glue Ring Jig Flathead screwdriver 60 Watt desk lamp HIOS Cl 4000 Electric screw driver Anti-static.
NORTH POWERED AIR-PURIFYING RESPITATOR (PAPR) INSTRUCTIONS FOR USE Preventive Medicine Industrial Hygiene Service.
Engineer Training XL1200 Safety System. Engineer Training XL1200 Safety System Confidential 2 Standard Requirements Both the machine and the Safety System.
Engineer Training XL1200 Pneumatics. Engineer Training XL1200 Pneumatics Confidential 2 Working Concept Overview: The Pneumatic System is comprised of:
Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
Department of Environmental Conservation 1 DATAMAX PRINTER SETUP MODULE 1.
Engineer Training Media Feeder TJ8300 / TJ8500 Media Feeder.
2 Fire Fighter Qualifications and Safety Skill Drills.
Optical Manufacturing Solutions 1 Probe Assembly.
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
Portable Power Tool Safety. Portable Electric and Cordless Drill Be sure the electric drill is disconnected from the power source before installing bits.
Welcome to Today’s Training. MILITARY AIRCRAFT EJECTION SYSTEMS and SHUTDOWN.
SAFE PROPANE TORCH USAGE
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
Engineer Training General Safety TJ8300 / TJ8500 General Safety.
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
L2000 Technical Training 6. Assemble/Disassemble.
How to Perform Preventive Maintenance of the Personal Computer Properly Shut Down of the Computer Properly Shut Down of the Computer Unplug all Connection.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
ResQmax Line Deployment Kit -ResQmax Launcher- 5 nozzle protectors -2 Streamline Projectiles- O-ring kit -500’ 3mm line with container- Corrosion block.
Engineer Training XL1500 Safety System. Engineer Training XL1500 Safety System Confidential 2 Standard Requirements Both the machine and the Safety System.
Engineer Training Troubleshooting TJ8300 / TJ8500 Troubleshooting.
Marubot Football League Service Manual.
Engineer Training Electrical System Overview and Requirements.
Engineer Training Drum Heating TJ8300 / TJ8500 Drum Heating.
Let’s Learn About the parts of the sewing machine
Noadswood Science, 2012 Electrical Safety. Electricity Safety To be able identify safety features with electrical components Tuesday, August 11, 2015.
Engineer Training UV Electrical Cabinet (16 and above) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 16 and above)
Electro-Pneumatics Module 1
Engineer Training Startup/Shutdown Procedures TJ8300 / TJ8500 Startup/Shutdown Procedures.
Sewing Machine Parts This presentation will show you pictures of the part and the Name of the part, followed by a definition of the part’s function.
Engineer Training XL1200 Electric. Engineer Training XL1200 Electric Confidential 2 Block Diagram.
Engineer Training Motion Control TJ8300 / TJ8500 Motion Control.
Installation. Indoor Unit Installation Typical Installation.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
Engineer Training Pneumatic System Overview. Engineer Training Confidential 2 Working Concept Overview: The Pneumatic System is comprised of:  Y Pistons.
Dayview™ LCD Film – Installation Procedures. Equipment Required : Latex gloves and face mask Glue cleaner (alcohol) & glass cleaner Special glue, spray.
SEWING MACHINE COURSE CODE : TE-308 COURSE TEACHER : M.A. BASET.
Engineer Training UV Electrical Cabinet (1-15) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 1-15)
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
PS1500B Battery Replacement Procedure. 1.Pull off the front panel.
Engineer Training Checking the Motor’s Rotation Direction TJ8300 / TJ8500 Checking the Motor’s Rotation Direction.
Focusing Lighting Instruments THE107. Focusing Lights This presentation will walk you through the basic steps of focusing a theatrical lighting instrument.
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
IMPLEMENTATION LOCATION VARIABLE AXIS LUBE VARIABLE SPINDLE LUBE PARAMETERS ELECTRICAL SERVICE MINIMAL LUBE SYSTEM.
WELCOME TO EVM WITH VVPAT TRAINING FOR ARO’S and STAFF
DESCRIPTION AND GUIDE TO OPERATIONS
AU Media/ER/Toyota/Tech/Gen 7/06 Toyota Tundra
Genuine N1. Conversion Installation manual LC
6. Disassembly & Reassembly
Front panel wiring PICO 155
Measure Hose as 14”, 12.5”, 12.25”, 9” & cut it.
1/17/2019.
Reader Swap out Guide.
Compressor Operating Instructions
Presentation transcript:

Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Installing the UV Lamp

Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Confidential 2 Safety  Shut down the machine completely by pushing the OFF button in the operation panel.  On the UV system power cabinet, padlock the main isolator in the ‘OFF’ position.

Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Confidential 3 Installing the UV Lamp 1.In order to hinge up the lamp head cover, you have to pull and rotate the locker pin on both sides.

Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Confidential 4 Installing the UV Lamp (Cont.) 2.Disconnect the air pressure to the machine, then open the shutter manually to gain access to the lamp socket.

Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Confidential 5 3.Release the lamp retaining plates by unclipping the slide latches. Installing the UV Lamp (Cont.)

Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Confidential 6 4.Do not touch the lamp, as skin acids will permanently mark the quartz sleeve. 5.It is recommended to wear cotton gloves or to cut the nylon package only on the edges as shown. Installing the UV Lamp (Cont.)

Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Confidential 7 Inserting the Lamp Note: This procedure must be preformed by two people. 1.Connect the lamp to its terminal. 2.Connect the yellow cable to the lamp terminal and secure it tightly.

Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Confidential 8 Inserting the Lamp (Cont.) 3.Place the lamp at its location, as shown in the picture.

Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Confidential 9 Inserting the Lamp (Cont.) 4.Place the lamp retaining plates and secure the slide latches. 5.Verify that the lamp can move freely (a few millimeters to the sides) Note: the lamp expands towards the sides during operation.

Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Confidential 10 Inserting the Lamp (Cont.) 6.Cut the rest of the nylon package. 7.Hinge down the lamp head cover. 8.Close the lockers pin. 9.Switch on the air and electrical supplies. 10.Check the shutter operation.