3 Secrets to Successful PM Implementation Presented by Jed DeGroote and Mike Stapleton November 1 st, 2011 2-3 pm EST We will begin the webinar in just.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

2 Casa 15m Perspectiva Lateral Izquierda.
Repaso: Unidad 2 Lección 2
1 A B C
AP STUDY SESSION 2.
1
& dding ubtracting ractions.
Select from the most commonly used minutes below.
Flexible Budgets, Variances, and Management Control: II
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Slide 1 FastFacts Feature Presentation October 16 th, 2008 We are using audio during this session, so please dial in to our conference line… Phone number:
Slide 1 FastFacts Feature Presentation November 11, 2008 We are using audio during this session, so please dial in to our conference line… Phone number:
David Burdett May 11, 2004 Package Binding for WS CDL.
1. 2 Begin with the end in mind! 3 Understand Audience Needs Stakeholder Analysis WIIFM Typical Presentations Expert Peer Junior.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Create an Application Title 1Y - Youth Chapter 5.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Custom Services and Training Provider Details Chapter 4.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt FactorsFactors.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
The 5S numbers game..
Inspections on an iPad, iPhone, iPod Touch, Android Tablet or Android Phone.
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Media-Monitoring Final Report April - May 2010 News.
Welcome. © 2008 ADP, Inc. 2 Overview A Look at the Web Site Question and Answer Session Agenda.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Red Tag Date 13/12/11 5S.
PP Test Review Sections 6-1 to 6-6
1 The Royal Doulton Company The Royal Doulton Company is an English company producing tableware and collectables, dating to Operating originally.
Operating Systems Operating Systems - Winter 2010 Chapter 3 – Input/Output Vrije Universiteit Amsterdam.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Biology 2 Plant Kingdom Identification Test Review.
Mobility Tool Fremtidens afrapportering 2013 – Erasmus Mobilitet / IP 2014 – Erasmus+ aktioner.
Adding Up In Chunks.
SLP – Endless Possibilities What can SLP do for your school? Everything you need to know about SLP – past, present and future.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Artificial Intelligence
GEtServices Services Training For Suppliers Requests/Proposals.
By CA. Pankaj Deshpande B.Com, FCA, D.I.S.A. (ICA) 1.
Before Between After.
Subtraction: Adding UP
1 Lab 17-1 ONLINE LESSON. 2 If viewing this lesson in Powerpoint Use down or up arrows to navigate.
Bell Busters! Unit 1 #1-61. Purposes of Government 1. Purposes of government 2. Preamble to the Constitution 3. Domestic tranquility 4. Common defense.
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
WorkKeys Internet Version Training
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
Online Tools for Managing Education Operations. Successful Schooldude PM Implementation Tuesday, April 27 th, PM EST Hosted by Jed DeGroote and.
Bringing Facilities Certification to your School District Scott Mackall Director of Facility Management & Transportation Park Ridge - Niles School District.
Presentation transcript:

3 Secrets to Successful PM Implementation Presented by Jed DeGroote and Mike Stapleton November 1 st, pm EST We will begin the webinar in just a few minutes. To ask questions throughout the webinar use the chat feature. We will review and answer questions submitted through the chat feature at the half way point and at the end of the webinar. Thank you for attending! For the audio portion of today’s webinar, dial and use the following access code:

Introductions Jed DeGroote- Success Operations Manager- SchoolDude.com o Managing pro-active support efforts for SchoolDude.com o Client Service Center 6+ years Mike Stapleton- President/Owner- Service Management Assist o Partner with SchoolDude for over 10 years o Has helped implement over 180 SchoolDude clients

Benefits to PM General life safety Extending the life of the buildings and grounds Increasing the productivity of faculty, administrators, students and operations and maintenance personnel

Is PM a Priority? SchoolDude.com Preventive Maintenance Survey As a facilities leader in your district, how important is a PM program in the scheme of your district's priorities (select one answer that most closely applies)? Answer OptionsResponse Percent Top 5 issue 36.1% Top 10 issue 21.0% Its important but I seem to never be able to give it the attention it needs 41.0% Its near the bottom 2.3%

PM Challenges

Many Barriers to PM Seems like there is never enough time With growing fiscal concerns, a slowing economy and the rigorous day to day demands of your job, it’s likely that planned (preventive) maintenance in your district have been put on a back burner. Vital but not urgent But we know what you know: your district needs a sustainable plan for maintaining building equipment, grounds, etc.

40’s,50’s & 60’s 1. Custodial operations 2. Maintenance operations 3. Grounds operations 4. Electrical / gas utility 5. Pest control (in-house) 6. Playground equipment 7. Roofs 8. Safety – general 9. School closings 10. Vandalism 1. Custodial operations 2. Maintenance operations 3. Grounds operations 4. Electrical / gas utility 5. Playground equipment 6. Pest control (in-house) 7. Roofs 8. Safety – general 9. School closings 10. Vandalism 11. Mold management 12. Asbestos (AHERA) 13. Carbon Dioxide testing 14. Lead in water 15. Natural gas volume purchasing 16. Electrical volume purchasing 17. CAD 18. CMMS with preventive maintenance 19. Electromagnetic emissions 20. Emergency / disaster plans 21. Energy management systems 22. Energy education 23. Data based custodial schedules 24. Rentals, community usage 25. ADA 26. Owners Construction Rep. 27. Indoor Air Quality 28. Lead in paint 29. Integrated Pest Management 30. Privatized custodial 31. Purchased services management 32. Protective equipment & clothing 33. Radon Management 34. Recycle waste program 35. Re-locatable classrooms 36. Right to Know Act 37. Underground storage tanks 38. Computerization – technology support 39. Blood borne pathogens 40. Budget planning 41. Labor law issues 42. OSHA Logging & training 43. Custodial equipment management 44. Quality Assurance program 45. Hazardous Waste Removal 46. Emergency Backpacks 47. Building Backpack Supply 48. Defibrillator maintenance 49. Defibrillator training 50. Security systems 51. Green chemical management 52. Carbon footprint issues 53. Sustainability program 54. Life/Safety Planning 55. Playground management 56. Expanded athletic programs 57. Swimming pool maintenance 58. Indoor track & field 59. Fertilization & weed control 60. Artificial athletic fields Facility programs have increased dramatically but many institutions have smaller leadership teams 70’s,80’s,90’s,00’s & Now The Increased Scope of Education Facility Management Education Facility Managers are so over programmed that a complete program is rarely delivered The Increased Scope of Education Facility Management Education Facility Managers are so over programmed that a complete program is rarely delivered

3 typical avenues to Successful PM Implementation 1. Do-it-yourselfers SchoolDude starter templates and Quick Step Guides 2.SchoolDude Consultation Unlimited one on one sessions for clients 3. Certified Partner Services Service Management Assist (SMA)

Secret One Get buy-in from decision makers Make them aware of the issues Show them cause and effect What’s the cost of not doing PM? (provide real examples) Leverage 3 rd party information, studies, data AS&U SMA SchoolDude White Papers

Getting buy-in from decision makers A strong PM Program reduces emergencies/catastrophic failures by more than 50% cents/sq/year in energy savings.

4 step process 1.Improve your image 2.Establish a respected methodology 3.Educate the decision makers and decision influencers 4.Present your request for more resources

Secret Two Create a culture of Planned Maintenance

Culture of Planned Maintenance Culture of Excellence Empower employees to pro-actively look for opportunities to take care of issues before they are reported o Look for opportunities to fix something before it’s reported by an end user o Add team based incentives o Point of pride

Culture of Planned Maintenance Expect it to take time Pick one type of PM to setup and concentrate on that first Simply setup the recurring schedule and plan to add task lists at a later date. Incremental Improvements

Culture of Planned Maintenance Expect it to take time Pick one type of PM to setup and concentrate on that first Simply setup the recurring schedule and plan to add task lists at a later date. Incremental Improvements

The Equipment Inventory Challenge The essential equipment information entries needed to start a planned maintenance program are as follows: 1. Item #; 2. Equipment description; 3. Area location of the equipment; 4. Location (building) and 5. Filter / belt information related to the piece of equipment (existing lists of equipment, belts and filters are obtained to add to the list). The first four listings allow the beginning of the planned maintenance scheduling. Many details like manufacturer, model and serial numbers are added by employees during the first cycle of planned maintenance work orders; these details are written on the work order and batched for entry by a clerical person. The detailed equipment list may be obtained by physical tours of your buildings … most institutions suffer from sticker shock (70% more) when presented with a quote for these data gathering tours. The most common sources of obtaining information for the equipment inventory: Existing or old CMMS programs; existing hard copy equipment inventories; BAS equipment lists; blueprint tables and “as built” documents. Internet conferencing interviews of key facility employees to form lists of equipment. Have SMA train your employees to conduct physical inventories of equipment.

Data Collection and Data Integrity Use staff to collect equipment data when performing routine work Focus on key pieces of information Leverage architectural drawings Stagger Data collection process

Use your resources Internal knowledge SchoolDude consultations SMA services Secrets are available to everyone to have a successful PMDirect program

Contact Us Jed DeGroote- Mike Stapleton-