ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
National Traffic Signal Report Card NTOC Talks February 23, 2005.
Worksheets.
Sequential Logic Design
Presented by The Coal Rush Revisited: R. W. Beck, Inc. IPED COAL POWER CONFERENCE January 18-19, 2007 St. Petersburg, FL Nicholas P. Guarriello An Economic.
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
1 When you see… Find the zeros You think…. 2 To find the zeros...
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
2.11.
Year 10 Exam Revision Groups of 4 Pupil A,B,C,D 1 point for each pupil.
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
Objectives After completion, you should 1. Know the term displacement, velocity,acceleration and deceleration for motion in a straight line 2. Be familiar.
What Time Is It? Lesson by Mrs. Moody, FLE. M1M2 Students will develop an understanding of the measurement of time. a Tell time to the nearest hour and.
Break Time Remaining 10:00.
The basics for simulations
Eric Graves, P.E. City Traffic Engineer Alpharetta, Georgia
Phoenix Adaptive Control Technology Showcase Cobb County Georgia
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
Operating Systems Operating Systems - Winter 2012 Chapter 2 - Processes Vrije Universiteit Amsterdam.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Progressive Aerobic Cardiovascular Endurance Run
City of Miami PROPOSED Fiscal Year 2009 BUDGET. 2 Budget Focus To prepare a structurally balanced general operating budget. To provide a budget, which.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
LN-251 SimINERTIAL Performance
By: Vasili Kartos Sam Hudson Raven Le’Nard 1 st period March 8, 2011.
2004 Weekday Arterial Hourly Volumes: 12 a.m. to 1 a.m. East-Central Source: Nevada Department of Transportation, RTC Legend vph 500-1,000 vph 1,000-1,500.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Lesson Menu Five-Minute Check (over Lesson 5–5) Main Idea and Vocabulary Example 1:Estimate Percents of Numbers Example 2:Estimate Percents of Numbers.
: 3 00.
5 minutes.
Let’s take a 15 minute break Please be back on time.
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Select a time to count down from the clock above
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
Introduction Embedded Universal Tools and Online Features 2.
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
.nowNAZTEC 1. Overview AGENDA Benefits Algorithm Simulation 2 Case Studies Real-time adaptive traffic control system Adjusts signal timing based on current.
Peek – ACS Lite Deployment Quixote Traffic Corporation Peter Ragsdale August 17, 2006.
U.S. Department of Transportation Federal Highway Administration ACS-Lite FHWA Adaptive Signal Control Systems Raj S. Ghaman, P.E. Team Leader, Office.
Siemens – Local Controller Software with Adaptive Control
TRAFFIC SIGNAL MANAGEMENT. PURPOSE Purpose: Foster understanding through development of educational outreach materials Illustrate benefits and basic techniques.
Gresham Traffic Signal System Optimization A Comprehensive Evaluation of Corridor Performance After Deploying Adaptive Signal Control.
Signalized Intersection Delay Monitoring for Signal Retiming SafeTrip-21 Safe and Efficient Travel through Innovation and Partnership in the 21 st Century.
Applied Transportation Analysis ITS Application SCATS.
Reggie Chandra, Ph.D., P.E., PTOE Operation Green Light Manager of Traffic Operations, MARC.
ACS Lite EconolitePerspective. Outline Development Experience Implementation Outlook.
Implementation Transit Priority System and Mobile Internet Passenger System in the City of Los Angeles Kang Hu and Chun Wong City of Los Angeles Department.
Making Work Zones Work Better Chung Eng Work Zone Mobility & Safety Team Office of Transportation Operations Federal Highway Administration US Department.
1 Adaptive Control Software – Lite (ACS-Lite) Eddie Curtis, P.E. FHWA Resource Center / HOTM NTOC Webcast March 27, 2008.
Software In The Loop Applications for VISSIM TRB Traffic Signal Systems Committee – Simulation Subcommittee Kiel Ova, P.E., PTOE.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
TRANSIMS Microsimulator Application for Improving Fuel Consumption at Urban Corridor Jaesup Lee University of Virginia & Virginia DOT Byungkyu “Brian”
Smart Information for a Sustainable World True Adaptive Signal Control A Comparison of Alternatives Technical Paper # Presentation to the 18 th World.
Slower vehicle speeds (under 30 mph) means less severe crashes 90% reduction in fatalities, 76% reduction in injury crashes 75% fewer vehicle conflict.
An ACSLite Case Study Riva Road in Annapolis, MD
Are your Traffic Signals Ready for Automated Traffic Signal Performance Measures? NOCoE Webinar June 15, 2017.
طرح هندسی تقاطع‌ها و تبادل‌ها
Presentation transcript:

ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C Slide 1 ACS-Lite Adaptive Control Software for Closed-loop Traffic Control Systems Raj Ghaman, P.E. Operations Team Leader FHWA RD&T

ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C Slide 2 Adaptive in the U.S. (FHWA) 1970s-1980s: UTCS / TRPS –Second by second central 1990s: Predictive control (ACS) –FHWA ACS: RHODES, OPAC, RTACL –Second by second distributed 2002: Controller-based Adaptive –FHWA ACS Lite –Leverage existing hardware / infrastructure –Download new controller parameters every five-fifteen minutes

ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C Slide 3 FHWA Goals for ACS-Lite Low cost design Leverage existing infrastructure Standard US-style actuated controllers and logic (rings, phases, splits, barriers, gap- out/extension, etc.) Standard fully-actuated detector layouts Standard NTCIP Communications Retro-fit with major US signal system vendors

ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C Slide 4 Project Team

ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C Slide 5 Field trials Peek/Quixote Bradenton (St. Petersburg/Tampa), Florida Econolite Gahanna (Columbus), Ohio Eagle/Siemens Houston, Texas McCain El Cajon (San Diego), California

ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C Slide 6 Gahanna, OH field test results Results - Number of Stops

ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C Slide 7 Gahanna, OH field test results 1 Peak hours = Average savings*(Average Corridor Peak Hour Volume*4 peak hours) Unit Costs: Total Delay – $12.10 per hour Stops – $0.014 per stop Fuel Consumed – $0.59 per liter ($2.25 per gallon) Before (per veh) After (per veh) Savings (per veh) Peak Hours (all vehs) Peak Hours Savings Total Delay (hour) $1.89 Total Stops $43.65 Fuel (Liters) $53.08 Peak Hours Benefit $98.61 Daily Benefit $ Annual Benefit $88,500.00

ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C Slide 8 Houston, TX field test results Results - Travel Time

ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C Slide 9 Houston, TX field test results Before (per veh) After (per veh) Savings (per veh) Peak Hours (all vehs) Peak Hours Savings Total Delay (hour) $ Total Stops $42.72 Fuel (Liters) $ Peak Hours Benefit $ Daily Benefit $2, Annual Benefit $577, Unit Costs: Total Delay – $12.10 per hour Stops – $0.014 per stop Fuel Consumed – $0.59 per liter ($2.25 per gallon)