DRMS “ Bringing Our Service To The Customer” Presented to: Lorna B. Estep, SES, Deputy Director for Supply, Directorate of Logistics, Headquarters Air.

Slides:



Advertisements
Similar presentations
IND 205 Demilitarize Government Property
Advertisements

IMO 107(49)/46 CFR ppm Bilge Separators 15 ppm Bilge Alarms
Museum Presentation Intermuseum Conservation Association.
Mechanical Modernization Project Creating the Best Choice in Urban Education St. Louis Public Schools Department of Operations June 26, 2008 Roger L. CayCe.
CONSTRUCTION WASTE.
Duration CONSTRUCTION Opening Date EQUIP INSTALL. & TEST Incheon International Airport Control Tower Outcome Progress DESIGN & AWARD : AOR 36 MONTHS.
Site Control American ERT Hazardous Materials Training.
Presented by: Guy Prescott Common Sense Safety, Inc. (530)
DRMS “Bringing Our Service To The Customer” Presented
General Safety Overview and Information
1 Preparing Texas Today... Division of Emergency Management Texas Department of Public Safety...for Tomorrows Challenges First Responder Preparedness.
Chemical Handling and Management
1 Universal Waste Case Study University of Rochester Strong Memorial Hospital Marvin Stillman, Manager Environmental Compliance.
Hazardous Waste Section
Generation of Radioactive Waste Radioactive Waste Management and Disposal NUCP
There are three types of emergencies:  Internal  External  Natural disasters.
Visual 8.1 Course Summary Unit 8: Course Summary.
INCIDENT NOTIFICATION WHO YOU GONNA CALL? Environmental Conference June 4, 2012.
1 Government-Industry Data Exchange Program GIDEP as a Resource Presentation for the Code 300 Orientation June 15, 2012 Presented by: Michael J. Sampson,
Electronics Stewardship Tim Hilton
S/K Challenge Demonstration Information and Planning Makeup Meeting US Army Dugway Proving Ground Presented 03 Jun 2014 Unclassified.
Field Operations and State-Managed Plugging Overview
State of Oregon, DAS Fleet Fuel Island Operations - Diesel.
Hazardous Chemical Spill Response and Containment Program
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Fleet Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental.
 Violations of the following regulations WILL result in a loss of lab points.
“Who’s In Charge?” “THE COMMAND SECTION”. The Incident/Unified Commander Incident/Unified Commander(s) provides direction and guidance through:  Key.
Conestoga Wood Specialties Corporation Businesses for the Bay Annual Meeting November 3, 2005.
Retirement Home Regulated under the Retirement Home Act, 2010.
Lumbermen’s Underwriting Alliance
Spill Prevention and Response Fort Wainwright, Alaska Environmental Officer Course 2011 Name//office/phone/ address UNCLASSIFIED 8/17/
Receipt in Place for Aircraft, Slide 1 Receipt in Place for Aircraft Presented by Jenny Prewitt DLA Disposition Services Major Command Support, Air Force.
Release Reporting. Lesson #17 - Release Reporting How Do I Know If I Have a Leak in My UST System?
UNIVERSAL WASTE SAFETY TRAINING CLASS. AGENDA Identifying Universal Waste Identifying Universal Waste Universal Waste Handlers Universal Waste Handlers.
Management of Spills & Leaks Two areas of focus: Prevention: Taking steps to minimize the potential for a spill and properly maintaining equipment to eliminate.
Environmental Toolbox. 2 General Awareness Training Module For Soldiers, Sailors, Airmen, Marines, and everyone in a base camp.
1 Mission First – People Always – America Forever Base Wide Natural Gas Outage GAS OUTAGE: DATE: TUESDAY 19 SEPTEMBER 2006 TIME: HOURS LOCATION:
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
HEALTH AND SAFETY IN THE HOME POLICY JULY HEALTH AND SAFETY AT HOME POLICY Why do we have this Policy? In order to make sure our properties are.
COVER YOUR BASES By: Pete Spatara By: Pete Spatara Director of Public Works Director of Public Works City of West Palm Beach City of West Palm Beach.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
State of Oregon, DAS Fleet Fuel Island Operations - E-85.
Sr. Col. Van Mui Nguyen, Sr. Col. Xuan Kien Nguyen, Sr. Col. Van Cu Ho, Sr. Col. Trung Son Nguyen, Sr. Col. Minh Hieu Nguyen et al Military Institute of.
MODULE: 5 SALVAGE, OVERHAUL, AND SUPPORT ACTIVITIES.
Release Reporting. How Do I Know If I Have a Leak in My UST System? 1. Unusual operating conditions; such as, erratic behavior of the dispensing pump.
Hot Work Permit Osan AB Fire Emergency Services.
Local Distribution Site (LDS) Regional Distribution Site (RDS) County Drop Site (CDS) Staff Roles.
Flammable Liquids Directorate of Training and Education
HYDRAULIC AND PNUEMATIC ACTUATION SYSTEMS
Spill Containment Methods
John Christian President, Logistics, Processing and Disposal
Sources of Energy ELECTRICAL MECHANICAL PNEUMATIC FLUID AND GASES
U.S. Coast Guard Hazardous Material Transportation Assistance Briefing
Program Shutdown Update
Coordinating with Station Emergency Response Agencies
The Fire is Out What Next?
Actuators & Directional Control Valves
Flammable and Combustible Liquids
TORFQ ACTIONS TO BE RELEASED
M/s. Green Valley E-Waste Management Pvt. Ltd.
Safety is part of our culture at Halliburton
Most incidents are small in nature, with a correspondingly small response organization, consisting of an IC and a handful of individual resources.
PDO Second Alert Always follow the PTW procedures
Workshop Session I.
Regional License and Permits Program
Magnet, Support and Infrastructure
Vehicle & Equipment Maintenance/Cleaning
The Survival Plan.
NCR-MD FY19 (2) VERA/VSIP Timeline
FOR SEWAGE DAMAGE CLEANUP IN ST PAUL, VISIT ICC RESTORATION AND CLEANING SERVICES! OUR TEAM OF EXPERTS IS TRAINED AND EXPERIENCED WITH USING THE PROPER.
Presentation transcript:

DRMS “ Bringing Our Service To The Customer” Presented to: Lorna B. Estep, SES, Deputy Director for Supply, Directorate of Logistics, Headquarters Air Force Materiel Command Steven G. Schmidt, SES, Deputy Center Director, NASA Dryden Research Center, Edwards ARB November 2007

SR-71, Disposal Operations Multi-Service, Agency & Contractor Involvement Air Force Materiel Command Edwards Air Force Base Marine Corp Logistics Base NASA Defense Logistics Agency Defense Reut & Mktg Service Scrap Venture Tri-Rinse Shredder Hw Contractor NASA Drain/Purge Contract SV Roll-Off Contractor AFMC Roll-Off Contract Tri-Rinse Fuel Contracto r DEMAN Contractor APCD/DTS C permits DRMS SR-71 Team Coordinating Disposition Efforts MCLB Security MCLB Safety MCLB Environment al AFMC Support Team

May 07Jul 07Aug 07Dec 07Oct 07 SR-71, Disposal Plan In Progress Jun 07Sep 07 Nov 07 AFMC/A4SM (SR-71 Project officer) and DRMS Program Manager conducted a preliminary site visit 21 May – 21 June. AFMC/DRMS teamed to initiate disposal action for NON Sensitive “H” conditioned support equipment. DRMS contractor mutilated on site, witnessed by DRMS and removed 192,000 lbs of residue. AFMC/DRMS staff on site segregating SR-71 parts by disposal method/process Continue improving disposal process Identified, segregated and consolidate electronic equipment, components, test sets, and circuit cards for shipment on DEMAN task orders. Successfully shipped 132,760 lbs to date. Final DEMAN task order for approx. 25,000 lbs scheduled for shipment Nov 10th AFMC/DRMS/SV workforce on site to uncrate, segregate and stage property eligible for shredding Tri-Rinse Shredding start date Sept 29 th Identified asbestos containing property, segregated and place on disposal contract for ultimate destruction (burial) A total of 229,520 lbs of asbestos shipped in (44) Roll-off containers. Receipt, off- load & actual burial witnessed and Certified/Verified by CORs Identified end items with hazardous constituents, i.e. gas cylinders, support equipment containing fluids. AFMC funded NASA contractor to drain/purge on site. Utilized Tri-Rinse shear and shredding process to dispose of end items as scrap

SR-71, Disposal Plan Mutilation Process In Action Shear with 17K lbs pressureLarge shredder crane feed Small shredder manually feedAll (3) operating simultaneously

SR-71, Asbestos Disposal Plan Complete Asbestos loaded for departure Certified/verified destruction by burialCORs Witness Burial Process CORs observed receipt/off-load

SR-71, Disposal Plan Challenge & Solution Challenge - During the first hour of full operations the main shredder experienced a hydraulic leak The loss of hydraulic pressure immediately shut down the entire system. One of the hydraulic hoses separated from the coupling and resulted in the release of approx gallons of hydraulic fluid Solution - The spill was immediately isolated, contained, and cleaned up by the Tri-Rinse staff in accordance with the provisions of their contract The spilled hydraulic fluid was contained on the rubber containment mats under the shredder and with the addition of absorbent and absorbent pillows The contaminated absorbent was place on a DRMS HW disposal contract & removed

SR-71, Disposal Plan Challenge & Solution Challenge - During the shredding process we experienced a fire that was caused by hot metal mixed with the shredded wooden boxes, crates & packing materials Smoke was immediately detected by the operator and a DRMS employee monitoring the operation Attempts by the SR-71 team to distinguish the smoldering content with fire extinguishers failed The Fire Department was immediately called and extinguished the fire Solution – We placed a spotter with a water hose to observe the shredding process and continuously wet down the content as it enters the roll-off