At the beginning there were two canals: 1. The Forth and Clyde Canal was built in 1777 between harbors Grangemouth and Falkirk, connecting Glasgow with.

Slides:



Advertisements
Similar presentations
At the beginning there were two canals: Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost.
Advertisements

By: Nicole and Alex. A canal is a man-made structure built to connect two different bodies of water. A canal is different from other waterways because.
At the beginning there were two canals: Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost.
At the beginning there were two canals: Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost.
The Falkirk Wheel (Scotland)
TRANSPORTATION By: Natalie Doornheim, Alec Lanza, Jenna Ribecca, Isabel Tolentino.
Chapter 8 Lesson 1 Test – Monday, January 10, 2011.
Vocabulary Preview. Physical Features  A physical feature is a type of land or waterway.
Chapter 14: Fluid mechanics
©1997 by Eric Mazur Published by Pearson Prentice Hall Upper Saddle River, NJ ISBN No portion of the file may be distributed, transmitted.
The Northeast Region Government History Landmarks.
Vocabulary. peak The top of a mountain canal a ditch dug across land that often connects two waterways.
At the beginning there were two canals: The Forth & Clyde canal was built in 1777, between the harbors of Grangemouth and Falkirk. This canal connected.
Falkirk Wheel.
SOO LOCKS.
By: Mark. Alessandro Malaspina attempted to create a canal connecting the Atlantic and Pacific oceans. He failed, and to make things worse, he lost about.
British Canal Systems Holzmann & Mummert
The First Wonder of our Region - The Highest Place Glasgow, Scotland Glasgow Tower This tower is on the bank of the River Clyde in Glasgow near the Glasgow.
The Union Canal Done by Sophie M, Ieuan, Brandon The Canal Experts!
UNION CANAL BY NATASHA, JAZIB AND FRASER. Life at the union canal is great. It was built over 200 years ago. The union canal goes to the kelpies.
THE ELEVATOR BY: ROBERT RICHARDS 8/14/14 PERIOD 2.
 Look out for Sparrow hawk, Skylar, Kingfisher, Swift, Linnet, Reed Bunting, Spotted Flycatcher, Tree Sparrow, Grey Partridge, Great Crested Grebe, Bull.
THE UNION CANAL BY SAOIRS,HANA,COLE !. YOU CAN FISH ON THE CANAL.
Chapter 2C Section 1 Fresh water is an essential resource.
New Industries in the 1920’s Decline and Creation.
Unit 3 – The Impact of the Industrial Revolution on New York State This glossary includes vocabulary words, definitions, and pictures. These slides can.
steel ship float in water when a steel marble sinks?
Scotland, UK A Scottish Story Between the ports of Grangemouth and Falkirk the Forth & Clyde canal, was excavated in 1777 connecting the east coast of.
Wednesday, April 3 Warm-up: Agenda:
From our countries earliest days, rivers were used to transport goods. – Example: Chesapeake Bay was used for shipping tobacco Rivers greatly aided the.
West Point Bridge Design Contest A bit about me What is Civil Engineering? What do I do? The competition… Introduction.
Magdeburg Water Bridge (near Berlin). The giant kilometer-long Magdeburg Water Bridge, completed in October 2003, connects two important German shipping.
Buoyancy is the force exerted on an object by a fluid and is usually acts against gravity. This is why objects feel lighter in water. Some of the force.
Engineering Marvel. At the beginning there were two canals: Canal Forth and Clyde was built in 1777, between harbors Grangemouth and Falkirk connecting.
UNION CANAL BY OLLIE MEGAN FINALY. WILDLIFE IF YOU FEED THE SWANS WHITE BREAD PLEASE STOP DUCKS ARE VERY FUSSY ABOUT FOOD THERE ARE NOT MANY FISH IN THE.
Vocabulary Quiz Cloze Review. When goods are produced in large numbers using an assembly line it is called _____________________________. To __________________________.
Why did the U.S. build roads & canals in the early 1800s? To improve transportation for westward settlement & speed up the flow of goods to improve business.
Canada’s Physical Regions.
At the beginning there were two canals: The Forth/Clyde Canal was built in 1777 between harbors Grangemouth, Falkirk and Glasgow with west coast of Scotland.
Types of Landforms. A volcano is… ▪ An opening in Earth’s surface through which hot rock and ash are forced out.
FOLLIE
AP Physics ED Uniform Circular Motion glazert.co.uk.
Tommy Nguyen 5/30/09.  The wheel is located in Falkirk, Scotland.  It is a rotating boat lift that moves boats from the Forth and Clyde Canal to the.
13 Institutions across Scotland. Why Scotland? University of Stirling University of Aberdeen Scottish Agriculture College University of Abertay Dundee.
Clydebank is a town situated in the west of Scotland not far from the city of Glasgow. The Clydebank coat of arms. The Latin motto below the shield is.
Geographical Terms Land and Water Terms. River Source River Source ~The starting point of a river *The river enters the gulf from the river source at.
Helium-filled balloon in the same train: How will it place itself ?
Lift Chair in Correct Position? User Mounts Chair User Lowers into Tub
BRIDGES.
Bell Ringer 4/15 How did the Industrial Revolution indirectly help cause the Civil War? How did the Industrial Revolution change the labor force (people.
The Falkirk wheel By Duncan.
At the beginning there were two canals:
MOVING WEST TRANSPORTATION 2017
At the beginning there were two canals:
At the beginning there were two canals:
Vocabulary Preview.
Bulk Head (1) (1st Suspension Connection)
At the beginning there were two canals:
At the beginning there were two canals:
At the beginning there were two canals:
At the beginning there were two canals:
Humanities and Social Sciences Upper Level Northeast: Accessible Entrance
At the beginning there were two canals:
At the beginning there were two canals:
Unit: The Industrial Revolution
At the beginning there were two canals:
At the beginning there were two canals:
At the beginning there were two canals:
At the beginning there were two canals:
Presentation transcript:

At the beginning there were two canals: 1. The Forth and Clyde Canal was built in 1777 between harbors Grangemouth and Falkirk, connecting Glasgow with the west coast of Scotland; 2. Union Canal, between Falkirk and Edinburgh, was finished in Because of geographical difficulties, which created a difference of 79ft. in elevation, the two canals were connected by 11 locks by a huge water carousel - started in 1963 and finished in Scottish Canal Engineering

This is the only rotational boat transporter in the world. It has two arms, and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating…

Lower canal…

Entrance to lower canal…

A Boat is approaching the “tub”…

At top of the “tub”…

There are boats in both upper and lower “tubs”… 35 m

Rotation is starting…

Boats in both rotating arms…

Rotation…

Just before “landing”…

One 78ft. long “tub”, with water and boat, weights about 300 tons.

Closing of the gate, regulation of level of water, and “tubs” rotation takes only 15 minutes. The “tubs” are filled according the Archimedes’ Law, so the weight of the “tubs” are balanced. An engine of 22.5 kW is required t o open the upper and lower lock and turn the whole system by 180º, which uses only 1.5 kWh.

joe-ks.com