Do You Comply? On January 4, 2014, water works brass will change forever.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHMs commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Larger Diameter Hymax® 14 – 24 Inches in Diameter
January Hand tools can be just as dangerous as power tools and other equipment when not properly used, stored, or maintained. Your hand tools are.
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
East Carolina University Compressed Gas Safety Training Program
Compressed Gas Cylinder Safety
CARE AND HANDLING OF LIBRARY MATERIALS Guidance for Library Users Prepared by Preservation and Imaging Department of the Harvard College Library Weissman.
Helmets – Standards, Certification and Regulations Ian Brodie, MSc. Project Manager September 19, 2006 Smart Risk Learning Series.
HVAC523 Soldering.
Student Book © 2004 Propane Education & Research CouncilPage Installing Steel Piping in Vapor Distribution Systems Installing steel piping.
Present Water Infrastructure Local authorities were established for conservation & proper distribution of water. Pipe lines were laid & connections provided.
Safely Using Drill Collar Clamps
Connecting to industry. Fittings for Steam Hose Remember Steam is……… minimum 212 F.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
SAFE PROPANE TORCH USAGE
A Manual for Repair and Maintenance Technicians 1ST STAGE.
Trouble Shooting How to Recognize Improper Installation May 2009 The Ford Meter Box Company, Inc. Table of Contents Valves and Corp StopsPages Tubing.
Chapter 11, Section 4. Changing a Shower Head 1.Turn off the water. 2.Remove the old showerhead. 3.Clean the showerhead stem of any corrosion or buildup.
Selected Size Beta Model Mechanical Seal Plug is ready for insertion into tube with nut loose and jaws retracted (relaxed). Ensure internal tube surface.
Finally, a compressed air piping system so simple…it’s EZ!
The New Low Lead Regulations 2014 AWWA Meeting February 26, 2014 LAURA A. TAYLOR (334)
Lead-Free Law Overview (and what it means to you) Rick Fields Zurn Wilkins.
Tire Servicing Program. Agenda WorkSafeBC Requirements Definitions Responsibilities General safety.
Presented by Jon Pannell
1 Department of Toxic Substances Control - Office of Pollution Prevention and Green Technology Multimedia Products Unit Andre Algazi - DTSC
ECE Regulation N°129 17/12/201354th Session GRSP December th session of GRSP December 2013 Informal document GRSP (54 th GRSP,
December 1, 2011 Jeff Hebenstreit - UL
Gauges and well logging
Stellar Industrial Technologies Your source for all your Safety and Pressure Relief Valve Needs.
Step 1 Park vehicle on a level surface then engage the parking brake and turn off engine. If you cannot comfortably get under the car, raise the front.
PRESENTED BY: NAMA’S GOVERNMENT AFFAIRS DIVISION ERIC DELL SENIOR VICE PRESIDENT Reduction of Lead in Drinking Water Act NAMA Webinar.
NSF/ANSI 61 Drinking Water System Components - Health Effects Acceptance criteria….. Regulated contaminants: Includes USEPA and Health Canada regulated.
Lead Free in 2014 By Darnell Wesson. Lead Free: What is it about? Codes and Standards Bradley and Lead Free Bradley and Lead Free Review Questions & Answers.
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
Tom Kader Chief Electrical Inspector Spaces About Electrical Equipment Sufficient access and working space shall be provided and maintained about.
U D T Workshop on the Pressure Equipment Directive, Warsaw June 2004 INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC SYSTEM OF ENSURING.
No Lead Laws & Regulations Tampa Bay Area Coop Meeting March 27, 2013.
1 HVACR316 - Piping Soldering. 2 Soldering Copper Tubing The most common method of joining copper tubing in hydronic heating systems is soft soldering.
Legislative Update Chuck Essigs. HB2031 Schools; Contractors; Fingerprint Clearance Card  Requested by school districts  Contractors, subcontractors,
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
NSF International Drinking Water Product Standards.
Keeping yourself safe when using common hand-held tools
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
Las Delicias Water Supply System OPERATION AND MAINTENANCE MANUAL 1.
NSF 60 Revisions Purkiss December 4, Update on Chlorate SPAC established in NSF 60 – 2012 = 200 ppb. SPAC calculation did not utilize all sig figs.
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
Do You Comply? On January 4, 2014, water works brass will change forever.
Trouble Shooting How to Recognize Improper Installations January 2013 The Ford Meter Box Company, Inc. Table of Contents Valves and Corp StopsPages 1 -
Workshop on Permanent Closure of Single-Walled USTs and Funding Opportunities For Closure and Cleanup.
Do you need fast delivery of a backordered item? Buy it from a peer distributor who has it in stock today!
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
Backflow Preventer Replacement Made Easy BY: Kenny Robbins.
ELECTRICAL General Industry Standards Examination, Installation and Use of Equipment Electrical equipment shall be free from recognized hazards that.
What Retailers Need to Know About New Light Bulb Legislation November 2011.
Metrology Regulatory and Obsolescence Strategy Andrea DavisBridget Berardinelli.
Welcome Growers Discover the Dosmatic Difference Installing your Dosmatic injector for years of service.
Charging Cart Instruction & User Manual EnTrans Technology Co., Ltd.
14 Refrigerant Recovery, Recycling, and Recharging.
Lead in Drinking Water Forum
NSF International Drinking Water Product Standards
East Carolina University Compressed Gas Safety Training Program
INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC
Parker domnick hunter. Safety of Electrical and
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Plastic Pipe and Fittings Association
Presentation transcript:

Do You Comply? On January 4, 2014, water works brass will change forever.

Legislation In January of 2011, the President signed into law Senate Bill 3874 and created the Reduction of Lead in Drinking Water Act. This legislation amended the Safe Drinking Water Act to reduce the allowable lead content in all products in contact with drinking water from 8.0% to 0.25% (weighted average).

When does the new law take effect? Nationally: This new law goes into effect on January 4, 2014 Some states have adopted laws with more aggressive timelines for no-lead brass ––California: Already requires no-lead brass ––Vermont: Already requires no-lead brass ––Maryland: No-lead brass required by 1/1/2012 ––Louisiana: No-lead brass required by 1/1/2013

Definitions No-Lead, Low Lead, Lead Free, Federalloy, EnviroBrass Basically, these terms all mean the same thing… –We do anticipate future standards and specifications to clarify some of the industry jargon, as well as the variety of product labeling that exists today. 5 The new Federal Law carries the most weight for the Ford Meter Box Company by specifically defining the allowable lead content (0.25%) of our brass products in 2014.

Are any products exempt? The new law applies to the wetted surfaces of any product used in a potable (drinking) water system Products used for non- drinking water applications (reclaimed, industrial, etc.) and brass service saddles are exempt from the no- lead requirements

How will this impact current standards? In response to the California no-lead law, NSF Standard 61 Annex G was created in 2008 to provide independent certification to the California law In 2010 NSF Standard 372 was created to permit all products to have independent certification to the new state laws. NSF 372 will supersede Annex G NSF 61 is a voluntary standard currently specified in a number of markets AWWA C800 currently references the Safe Drinking Water Act requirements and will be updated nearer to 2014 to remove leaded brass from the permitted wetted contact material list NFS/ANSI Standard 372 is our primary focus moving forward for users not requiring NSF/ANSI Standard 61

No-Lead Brass Specifications Made from UNS/CDA No C89833 cast alloy UL Classified to NSF/ANSI Standard 61 and Standard 372 Brass components in contact with potable water shall be of No-Lead Alloy (UNS/CDA No C89833) UNS/CDA No C89833 conforms to AWWA C800 and ASTM B-584 Components that do not come in contact with potable water shall be UNS/CDA No C and shall conform to AWWA Standard C800 (ASTM B-62 and ASTM B-584) Ford No-Lead products are identified by “NL” on the major body component

No-Lead Brass Specifications

Good News Ford Meter Box is Ready! Ford provides (and stocks) a complete no-lead line of brass waterworks products that meet the new legislation Add the “-NL” suffix to your current part numbers

No-Lead Brass Identification Ford No-Lead products are identified by “NL” on the major body component Ford No-Lead products are packaged with a lime-green box label, and have “- NL” at the end of product number

What does this mean for me? All current waterworks brass inventory becomes obsolete and can not be sold (or used) after January 4th, 2014 (unless your state adopts an earlier deadline) Begin planning now to cycle out your current brass inventory and replace with the new no-lead brass products Contact your local Ford Meter Box representative to develop a transition plan

Handling and Installing No-lead Brass The Basics No-lead alloys, at a minimum, require the same care as traditional waterworks brass. For best results, besides specific product instructions provided, follow these general instructions. 1. Handle carefully…protect threads...keep clean…do not drop or throw. Do not use a pipe wrench. 2. Always use a suitable sealant or Teflon tape on tapered threads. 3. Use only smooth-jawed, adjustable wrenches that fully and evenly engage the wrench flats. Loose fitting wrenches and pipe wrenches will distort the valves or fittings and cause leaks. 4. Place wrenches only on wrench flats provided, not on round surfaces.

Handling and Installing No-lead Brass The Basics 5. Use extra care not to over tighten connections, which could distort or break the brass. 6. Use extra care not to exert side / down forces on the brass to avoid distorting or breaking the valves and fittings. 7. Always inspect and pressure test before backfilling. 8. Backfill and compact carefully to ensure the brass and service line are properly supported and not stressed by the weight of the earth. 9. Protect from freezing. Frozen water can expand and damage brass, causing leaks.