Water & Wastewater Construction Water Storage Tank, No. Andover, MA Back Forward.

Slides:



Advertisements
Similar presentations
Construction Technologies. The study and application of building or assembling a structure. All people are affected in one way or another by construction.
Advertisements

Promote product and services BSBMKG413A TASK 2 PART B
Science Research Task on Water Saving Device. By Aidan G `
Water Storage Tank South Elevation, Gutter System Complete, Stone Strip Water Storage Tank – Uxbridge, Massachusetts.
Water & Wastewater Construction WWTF improvements, Vibro hammer piles Concord, MA Back Forward.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
What size is your carbon footprint? The Sun, wind and rain can be used to make electricity There is much more power in the weather than you think. Lets.
SRI SRI GNAN MANDIR SCHOOL,BANALI UPDATE OF THE PROJECT.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Centerville Elem. School Beverly, MA Front entrance.
Mine Construction. Start of Barge Landing area. A trailer, excavator and generator. Early Barge Landing June 2007 with one trailer to start construction.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Roof & Gutter De-Icing. 2 Designing an IceStop System.
Traditional and Modern Construction Methods. A presentation for P7, P8, and P9 By ?
FLOWER POWER USA, Inc. (FPUSA) in cooperation with GRUP ROMET BUZAU (GRB) Clean Water and Clean Energy for Rural Prosperity.

Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering WFP Slideshow Photos from Water For People Projects Courtesy of Jody Camp Photos from.
What is Civil Engineering? Presentation by: Boston Society of Civil Engineers Section/ASCE Younger Member Group High School Outreach Program.
Energy Performance Certificates. Energy Efficiency Rating This chart tells us how energy efficient a building is. This efficiency depends on the construction.
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
Pre-Proposal Meeting for Architectural Services
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
CE 3372 Water Systems Design EPA-NET Pumps, Valves, Tanks.
Unit 8: Waste Management Section 2: Wastewater Treatment.
Institute of Urban Water Management. Technical & Chemical Laboratory.
Hydropower plants cause local environment and social impacts. This explains the anti dams advocacy. Hydropower plants cause local environment and social.
Energy Efficiency and VAT !. 5% or 17.5% VAT ?  What can be charged at 5%  When can it be charged  Why does it matter?
Cultural influence in Architecture: Admin Use of Clusters of buildings that are rectangular in shape from master planning to unit level.
LONG TERM GEODETIC MONITORING OF THE DEFORMATION OF A LIQUID STORAGE TANK FOUNDED ON PILES P. Savvaidis Laboratory of Geodesy Dept. of Civil Engineering.
Modern Agriculture PBHMnBM9U.
This presentation is purely for you to practice : – Drawings of different object views – Calculating the material required.
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
1 Permanent window shutter details. 2 Details of roll-up shutter.
DESIGN OF ECO-FRIENDLY HOME PART FOUR By Emily Duong 8.7.
Chapter 7 : Construction 1. Adobe – a mixture of clay and straw used as a structural material in the Southwestern United States.
Ephemeral Concrete Concrete wall panel construction method Cambridge, MA Namjoo Kim, Cambridge.
Slide 23/ CH-NGO DRR Standard Shelter: Technical Requirements: Typhoon Resistance Resistance250 km/h sustained wind speed.
Design and Technology Shelters. Look at the pictures of different shelters and think about: Why was it built? Who might use it? Does it matter what it.
View from San Simeon State Park’s campground into CCSD’s EWS effluent pond
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
Baltimore City Department of Public Works. Design Notice to Proceed: October % Design Completed: July % Design Completion: November 2015.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
JIJIMOL .L J B.ED Social Science BNV CTE
International Workshop on UI GreenMetric Margo Hotel Depok, Indonesia
Soil Conservation.
Baltimore City Department of Public Works
Super critical power plant. HPT IPT LPT CONDENSERCONDENSER FEED WATER FRS STORAGE TANKSTORAGE TANK SEPARATOR BWRP Spiral water walls MS LINE HRH LINE.
PLUMBING APPLIANCES & COMPONENTS
Before The hardwood in the ceiling gave a warm feeling to the pool.
A low-pressure dosing system requires a pump tank and a network of small-diameter pipes (1 to 2 inches) placed in trenches. The pump tank stores the effluent,
Hopewell Valley Regional School District
Chambers are an alternative to a conventional media-filled land application system. A hard plastic dome supports an open reservoir that holds wastewater.
Building Construction
Permanent window shutter details
WIND FARM Forward, Pennsylvania August 2007
Forced draft cooling tower. NumberingEquipment A-1Storage Tank B-2Temperature sensor C-3Pump D-4Ball valve E-5Rotameter F-6Cooling water from the tank.
These devices spin to generate energy.
These devices spin to generate energy.
Water Treatment.

Types of Load Name____________________________ Tutor Group _____
Cart/Wagon. Cart/Wagon Cart/Wagon Cart/Wagon.
MOVING ICE WIND GRAVITY
New dawn Tanzania Development Update, Feb 2017
Cart/Wagon. Cart/Wagon Cart/Wagon Cart/Wagon.
Survey sustainable housing
New Central Fire Station
Before Construction Picture Taken From Corner of Building on the Roof.
Presentation transcript:

Water & Wastewater Construction Water Storage Tank, No. Andover, MA Back Forward

Water & Wastewater Construction Tank Roof 2 No. Andover, MA Back Forward

Water & Wastewater Construction Center of Tank Centering Device for Winding Operation, No. Andover, MA Back Forward

Water & Wastewater Construction Back Forward Reservoir 1 Liner & Fence Removal, No. Andover, MA

Water & Wastewater Construction Back Forward Subgrade for Natgun Tank (1), No. Andover, MA

Water & Wastewater Construction Back Forward Natgun Tank Ready for Water, No. Andover, MA

Water & Wastewater Construction Back Forward Placing Wall & Dome Panels, No. Andover, MA

Water & Wastewater Construction Back Forward Water Storage Tank Complete, No. Andover, MA

Water & Wastewater Construction Back Forward PCC Shelter Placed, No. Andover, MA