MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

Making the System Operational
AIM Enterprise Central Site Planning
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008.
Effective Contract Management Planning
1 NATIONAL PROVIDER IDENTIFIER (NPI) CLOSEOUT PHASE Human Services Department Mark Pitcock, Bureau Chief Program Information Systems Bureau Liz Shaw, IT.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Curriculum Review LOG 340 “Performance Based Life Cycle Sustainment” Presented to the Life Cycle Logistics (LCL) Functional Integrated Product.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
Authoring Instructional Materials (AIM)
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP.
AIM FRB Meeting 4-6 November Meeting Logistics Parking Base Access – not needed Coffee Vending Machines Food Facilities Come & Go as needed…
AIM Toolset Interfaces with Authoritative Technical Data
1 AIM/CPM Pilot Project Status Report 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Roy Hoyt & Leslie Desenburg, NETC N74.
Authoring Instructional Materials (AIM)
MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
The Project Charter The most Important and Powerful Document to use for Initiating, Controlling and Preparing a Project in order to ensure Project Quality.
AIM Program Software Status
A look at the NETC End-to-End (E2E) Process using the Content Planning Module (CPM) / Learning Object (LO) Module.
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
Feb 2011 AIM FRB Action Item Review 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
NETC N72 Status Update to AIM FRB NETC N72 Status Update to AIM FRB John Wishall 23 April
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
1. Report status of traditional and modernized AIM
Lessons Learned from NETPDTC Central Site Implementations Lessons Learned from NETPDTC Central Site Implementations 23 Aug 11 Peg David, NETPDTC Project.
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
AIM Virtual FRB Meetings Sep, & 1400 Both Days.
AIM Team Software Status AIM Team Software Status Mike Matzko AIM Team 20 August 2014.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
LOG 101 Curriculum Review 14 Jul 06 Duane Mallicoat Course Manager.
MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI.
Status of AIM I/II and CPM/LO Module Software 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
AIM/CPM Briefing & Demo 4 November 2009 Jamie Stewart, AIM Team ISD Lead Danette Likens, AIM Team ISD.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
Overview September Agenda Overview of AIM Introduction to AIM Team AIM in the Navy Education and Training Command (NETC) Enterprise.
NETPDTC AIM Central Site and CPM Hosting 4-6 May 2010 Bruce Bare, NETC, CIO Denise Green, CNATT, N6 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
AIM FRB Briefing Strategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
AIM ACR Prioritization AIM ACR Prioritization 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Ron Zinnato, AIM Lead Engineer Jamie Stewart, AIM Lead ISD.
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD.
AIM FRB Briefing Mike Clifford LSO Kings Bay Submarine Learning Center November 2008.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
Linking Blended Learning to Navy Fleet Performance Requirements, REAL-TIME Jake Aplanalp Naval Air Warfare Center, Training Systems Division.
AIM FRB Meeting Overview 4-6 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
1 NETC N7 Status Update to AIM FRB 4 November 2009 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
LOG 101 Curriculum Review 28 Jun 02 Richard A. Andrews, CPL Course Manager.
NETC Fleet Assessment Initiative 5 November 2009 Mike Dekle, NETC, N516.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
AIM-related Repository Efforts Status 4-6 May 2010 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Jim Ferrall, Columbus Technologies Denise Green, CNATT, N6.
Presentation transcript:

MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team

Overview MT Continuum overview Application to other communities Project status Lessons learned for other NETC communities

MT Continuum Project Strategic Systems Programs (SSP) re-engineering 30+ week training pipeline for TRIDENT Ballistic Submarine (SSBN) Missile Techs (MTs) into blended just-enough/just-in-time ILE- conformant Instructor Led (ILT) and self-paced segments AIM CPM and LO Module toolsets part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms MT Continuum team: – SSP - Requirements Owners – Contractor team – ILT dvlp, self-paced input, SMEs – NAWCTSD / AIM team - CPM/LO Module support – LSI, Inc. - ISD and self-paced content design/development – CFS – CM/QA agent for SSP

Application to Other Communities Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development Closely coordinated with NAVEDTRA 136 development Hands-on production phase development of complete LO Module ILT lessons/sections and design of self-paced lessons/sections Integrated development and maintenance environment for blended, SCORM and 136-compliant learning content Bi-directional interface between LO Module and LSI Venus.net CBT toolset for self-paced development/maint.

Project Status Plan, Analyze and Design Completed – JDTA – Establishment of initial 3 major projects – Revised 9-project structure  Approval of learning objectives  Ongoing development of ISD considerations elements as part of script-storyboard effort Development (production) Phase underway 15 May 11 – 9 projects exported from CPM to LO Module for production development in AIM I Rel 5.0 on fedsun – SWS AIM I instance to transition to NETPDTC hosting by 1 Oct 11

Lessons Learned for Other NETC Communities Completion of supporting documentation in Design Phase is crucial – (IMDP, ASDD, process documents) Establish standard for estimating TTT in Design Phase Establish change request process in Design Phase Complete Development IMS/POA&M in Design Phase – better activity duration estimates for process steps.

Questions?

Backup Slides

Issues/Concerns “End to end” surveillance/maintenance test on TLO/ELO in process to: – confirm existing change impact identification functionality in CPM and LO Module – identify near-term updates – refine longer-term enhancements  Testing begun by Mark Campbell and Mike Lueken (LMMS) w/ favorable results  Identified critical issues addressed as part of AIM I Rel 5.0  Further testing surveillance testing on LDC is still required and ongoing with Rel 5.0 by Jamie Swaim (CSF)  Team continues to refine versioning business rules/process

10 Modernized AIM Modernized AIM can tie the entire process together Modernized AIM can tie the entire process together

MT Continuum Process 11