Installation Presentation

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

FVCC Fire Rescue Forcible Entry.
Home Slicker Plus Typar Training Presentation
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
Remodel / Resurface. Manufacturers Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified.
Interior Wall and Ceiling Finish
Adhesives Questions 1)What is the best kind of clamp to use when gluing wood edge to edge? A.Spring clamp B.Bar clamp C.C clamp D.Hand screw clamp.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Giving Your Models a Stucco Exterior Kevin Looff March 7, 2009.
2313 W Sam Houston Parkway N Suite 105 Houston, Texas ROK Shield Application Instructions ROK Shield is a non-toxic,
Drills & Drilling Drills & Drilling.
INTERNAL PLASTERING.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
Lather Skill Trades Introduction Lathers  Assemble and install the framework for gypsum materials (Drywall & Plaster) in buildings.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Competency: Draw Wall Sections
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
Welcome to Hardie 101 Basic Training
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe.
CLADDING / VENERING OF INTERIOR AND EXTERIOR WALL SURFACES WITH MASONRY STONE CLADDING BRICK CLADDING.
Tray Tools, Materials & Processes. The Pillar Drill can be used to drill wood, metal, and plastic. As a general rule the larger the hole you are trying.
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
17/05/2015Dave Winchester Jan 2011 Dry Dashing Dry Dashing.
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
Firestone Building Products EPDM Training. Membrane Attachment.
Objectives : ANALYZE home maintenance techniques.
Masonry Details.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
CONSTRUCTING A FIVE CABIN LATRINE
Introduction to Construction Industry
TABS II Installation Presentation. TABS II Before getting started, please read & familiarize yourself with the Tabs Wall Systems Estimating & Installation.
Unit 26. Sizes 7-5/8” high 15-5/8” long Common depths – 8”, 10”,12” 3/8” mortar joints Walls usually stand 7’-4”
ARCH 243 CLADDING OF WALLS. CLADDING / VENERING OF WALL SURFACES PLASTER STONE CERAMIC –BRICK METAL GLASS PLASTIC WOOD.
Installation Presentation
Choosing the Right Siding When selecting siding, there are six basic issues to consider: 1. Water Resistance. Water-resistant types of siding will have.
Intro to Concrete 18.0 & 19.0 Class notes.
Dry lining by direct bond – overview
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
Safety Rules for 9 th Grade Shop Radial Arm Saw: Safety Rules Never cut a board that is less than 12 inches long. Always pull the saw using the handle;
Hard Floor Care VCT floor finish application This presentation is available for review at:
Definitions of terms associated with concrete masonry units A.Masonry Units: Blocks made from concrete, cinders, or other aggregates. B.Laying Block:
Ventilation Skill Drills.
Principles of Manufacturing Copyright © Texas Education Agency, All rights reserved 1.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
TABS II Contractor Installation CD. TABS II Before getting started, please read & familiarize yourself with the Tabs Wall Systems Estimating & Installation.
Everything about drywall (lather)
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
Drafting 2 (Arch) Quiz Review #5
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
VIEW SERIES with Sliding Door
Cavity Wall Construction
Leads Institute of Technology & Engineering
Installation Walkthrough Image Guide
Board Replacement for Engineered Glue-Down Pattern Plus with a Premier Performance replacement board.
CLADDING / VENERING OF INTERIOR AND EXTERIOR WALL SURFACES WITH MASONRY STONE CLADDING BRICK CLADDING.
Board Replacement for Floating Floors
Subject : Building Construction
Student: xxxxxxxxx AEC 204 Lab December 5, 2006
Brick A fired clay masonry product..
Common Components of a Traditional Wood Framed Building
Presentation transcript:

Installation Presentation

Tabs Walls Systems can be installed on just about any building substrate, from Exterior Plywood, Cement Board, OSB, Densglass Gold, Insulated Sheeting, & to Existing or New Masonry Walls. Tabs Wall Systems, LLC • 4515 Airwest SE• Grand Rapids, MI 49512 • 616-554-5400  

Prior to installing the MortarLock Panel as an exterior surface, it is extremely important that the substrate of choice has been properly prepared and covered with a code approved water infiltration barrier. In addition all window and door openings must be properly flashed & sealed. Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

Now that you inspected & sized up your project, it is time to get started, make sure you ordered the necessary Tabs System components to make your project a success. Tabs II Adhesive & Mortar Additive. Tabs II Structural Support Panel Tabs II Structural Support Corner Panel Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

Tabs II 4” or 9” Flashing Tape Tabs II Super Stretch Flashing Tape If your installing the MortarLock Panel System with window or door openings, you must order the following additional items. Tabs II 4” or 9” Flashing Tape Tabs II Super Stretch Flashing Tape Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

In addition to the necessary MortarLock components needed, be sure you order your Thin Veneer Material of Choice. Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

When ready to tuck point, only use “Type S Mortar”, adding only “Tabs II Mortar Additive” diluted to a 1:5 Ratio. “Type S Mortar” can be mixed on site or pre-mixed. Pre-mixed Type “S” Mortar mixes include everything (sand, portland & lime), just add water along with Tabs II Mortar Additive. Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

Step 1 Level & snap line across bottom of substrate minimum 1 ½” above finished grade. Carefully pull up membrane and install flashing , wrap membrane over top of flashing. Bend up bottom row of tabs & cut across using power sheers. Place MortarLock Panel on top of flashing & start installing the MortarLock panel. Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

Step 2 Only using non-corrosive #8 flat head or wafer head fasteners with flat back design. Install one fastener per square foot in pre-drilled hole, 16” on center & 8 “ high through substrate into wood or steel stud. For projects 24” on center, install every 24” horizontally & 5 ¼” high. Additional fasteners can be used wherever panels are cut and needed. Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

Step 3 It is recommended that MortarLock corner panels be installed first, followed by MortarLock standard panels. Staggering panels in a running bond pattern. This will also help in bracing the wall. The maximum spacing between panels should be no more then 1/16”. This will also allow for stress relief and allow for any adjustment which might be needed. Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

Step 4 After installing MortarLock Corner Panels, start installing MortarLock Standard Panels, occasionally checking with level & tape measure to allow for proper alignment. Use Tin Snips or Power Shears to cut panels between window & door openings &/or where any obstacle may appear. Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

Step 5 Now that you’ve installed enough panel to get started. Only using Tabs II Adhesive, apply two dabs about the size of a quarter (just enough for brick to stick on the panel) on each end of the back of the brick or on the panel. Add one additional dab of adhesive on return side of corner brick. Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

Start Installing Brick Step 6 Start Installing Brick Slightly slide brick into place (¼” max), this will break any surface film & achieve proper bond. Be sure to engage Tabs II’s mortar tie, by pressing mortar tie in downward motion over top of each brick. Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

Step 7 Install Accents Install Accents, such as Rowlocks & Soldier Courses by tapping Tabs upward with a hammer. Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

Step 8 Tuck Point Mortar Wait twenty four (24) hours to allow adhesive to set-up, check to see if thin veneer material is ready to be tuck pointed. When ready, using a Type “S” Mortar mix adding Tabs II Acrylic Additive, start tuck pointing brick using a mortar bag, fill horizontal joints “right to left”, than strike joints “left to right”. Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

Step 9 Step 10 Strike Joints & Clean Do Not Power Wash ! When mortar is thumb print dry to touch (similar to wet beach sand), it is now ready to strike the joint with a slicker or jointer. Pack mortar into joint. Properly struck mortar should be dry enough to fall away clean and tooled to a dull gritty finish. If finish is wet & shiny stop ! Let set-up a little longer and proceed. Thereafter, brush excess mortar off brick face with a natural bristle brush. Clean brick, per brick manufacturers recommendation. Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656  

Key Points Never have a Continues Horizontal Bead of Glue, Which will Trap Water Never Overlap Panel Over Control Joint. Space Same thickness as Control Joint Never Overlap Two Panels Except at Control Joints, Never Space Two Panels More Then 1/16” Apart Always Engage Tabs II Mortar Tie Over Each and Every Brick Only Use MortarLock Authorized Materials If your not Sure, refer back to your MortarLock Installation Guide or call MortarLock Tabs Wall Systems, LLC • 2900 Wilson Avenue • Grandville, MI 49418 • 616-261-5656