The University of Greenwich Teaching excellence for 100 years The Economics of Nuclear Power Myths of nuclear power: A guide Moscow 5 April 2011 Steve.

Slides:



Advertisements
Similar presentations
Unlocking Value Through New Relationships Malcolm Brinded Shell UK Country Chairman Co-Chair of ILT Member of OGITF/PILOT since December 1998.
Advertisements

Key Concepts Financial Institutions Functions of the Federal Reserve System.
Business Plan: Balancing the electrical grid load by remote control of electrical consumers Student: Gregor Androjna address student:
Financial Survival 1 Maryland Content Standards on Personal Finance Short term.
Is a single European energy market possible? Steve Thomas Professor of Energy Policy and Director of Research PSIRU (
New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.
+ T V Bring TV to you. where we are now We are here now. Where we will be if give us the money.
Introduction Leasing and hire purchase are financial facilities which allow a business to use an asset over a fixed period, in return for regular payments.
PV situation in Spain By José Donoso, General Director of UNEF May, 2013.
Introduction to Small Business
(c) St Patrick's Cathedral Grammar School Form Government and Business The affects of government policy on business.
GREAT DEPRESSION 1920S ECONOMY. AMERICA MADE LOTS OF MONEY DURING THE 1920S Higher productivity and consumer demand (people wanting to buy things) led.
UNRESTRICTED Financing of Nuclear Power Ala Alizadeh Atomic Energy of Canada Limited Nuclear Infrastructure Milestones Workshop November 2007 IAEA - Vienna.
America’s Economic Revolution.  As the territory of the United States expanded, roads became less practical for moving goods  The need for better long-distance.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
Managing a Small Business Intro to Business 2015.
What is killing the Nuclear Renaissance? Presentation at 10th IAEE European Conference Vienna, September 7-10, 2009 Steve Thomas
Managing Finance and Budgets Seminar 7. Follow-up Activities  Preparation: read Chapter 4 (Both editions),  Describe key concepts: Characteristics of.
Highway Robbery? A financial analysis of Design Build Finance and Operate in roads in the UK Jean Shaoul, Anne Stafford and Pam Stapleton University of.
The Great Depression. What was the Great Depression? Time of economic crisis characterized by high unemployment during the 1930s, the beginning is marked.
“NUCLEAR POWER IN UTAH: COSTLY, RISKY AND UNNECESSARY” By Matt Pacenza, Policy Director HEAL Utah.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
© Prentice Hall, 2007Excellence in Business, 3eChapter Financial Management and Banking.
Chart Your Course to Business Success On Target Business Intensive: Session 4 April 17, 2012 Advisors On Target 1.
© 2014 Cengage Learning. All Rights Reserved. Learning Objectives © 2014 Cengage Learning. All Rights Reserved. LO3 Identify the components of a loan application.
Financing New Nuclear: The Government’s Role in the Nuclear Renaissance John Hanson The Ohio State University American Nuclear Society, WISE Intern August.
2.3.3a How does a company budget efficiently AS Edexcel Business Studies Reference: com com.
The University of Greenwich Teaching excellence for 100 years A comparison of the Hinkley Point and Paks projects March 2015 Steve Thomas
Energy in the United States Electricity, Nuclear Energy, Renewable Energy Summary report by Sarah Lahr Sustainable Air Quality 2/11/02.
Introduction to Operations Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written.
The University of Greenwich Teaching excellence for 100 years Is new nuclear build justified? Press Conference on the need for an Independent Inquiry March.
Supply Chain Management: From Vision to Implementation Chapter 4: New Product Development Process: Managing the Idea Infrastructure.
Introduction to Business Chapter 21
CHAPTER 10: FINANCING AND PRODUCING GOODS.  _mods.php?PROGRAM= &VIDEO =-1&CHAPTER=10
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
BUSINESS GROWTH AND OTHER ORGANIZATIONS. GROWTH Businesses can grow through using revenue to reinvest in technology Income statements illustrate this.
SOURCES OF FINANCE FOR ECONOMIC GROWTH CREDIT FINANCING FOR THE PRIVATE SECTOR JUNE 8 TH 2010 Robert Wright.
Introduction to Business Chapter 33
MODULE ? CUSTOMER CHOICE PROGRAM. The opportunity for a retail electric or natural gas customer to choose who supplies their electric or natural gas.
İntroduction to Business 2 BUS 102 Erlan Bakiev, Ph. D. Zirve University BUS 102.
BUSINESS ORGANIZATIONS. SOLE PROPRIETORSHIPS What is the most common form of business? Sole Proprietorship, which is a business run by one person; smallest.
Economics of electricity production and competitiveness of nuclear energy Prof. Dr.-Ing. Alfred Voß Institute of Energy Economics and the Rational Use.
The Commericial Revolution: Mercantilism. During the 16th and 17th centuries, European nations competed for overseas ______, ______, and _______. As a.
By: Nick H. Aubrey V. Dan L. Kiera B. Produced by controlled nuclear reactions Controversial and has an on-going debate about the use of it. Proponents,
Nuclear power: A cheap option? Westminster Keynote Seminar October 19 th 2009, Portcullis House Steve Thomas PSIRU (
My$Brand Introducing Anchor D Bank’s PERSONAL FINANCIAL MANAGEMENT solution. April 2015 Anchor D Bank is offering our customers a tool to assist in track.
Essentials of Managerial Finance by S. Besley & E. Brigham Slide 1 of 23 Chapter 1 An Overview of Managerial Finance.
The Future of Dealers Presented by Chris Reynolds CEO & President Investment Planning Counsel Inc. April 27 to 29, 2010 Share the tools.
Financial System in India Financial System represents a closely held financial institutions, financial services and financial instruments or claims.
Do Now 1)How do most people pay for college? 2)Why do people take this risk?
Sussex Energy Group SPRU - Science and Technology Policy Research The Economics of New Nuclear Build Presentation at the Nuclear Consultation Group Westminster.
Define key term and example Application to business Analysis and evaluation key point. State 2 advantages of Nadir setting up a sole trader? (2) Setting.
Update on the status of the UK nuclear power programme Presentation to INRAG 27 February 2016, Vienna Steve Thomas Professor.
Marketing I Curriculum Guide. Pricing Standard 4.
Lesson 2 Functions of Business Unit 1. Although we come into contact with business regularly, we often do not think about what goes on behind the scenes.
Unit 26.  What is the base interest rate?  What is the variable interest rate?  What is the exchange rate to Euros?  What is the exchange rate.
Characteristics of the US Economy & Types of Businesses.
Certificate for Introduction to Securities & Investment (Cert.ISI) Unit 1 Lesson 37:  Swaps  Interest rate swaps  Covered warrants 37cis.
CAUSES OF THE GREAT DEPRESSION. Definition of the Great Depression ► An economic depression in the United States and Europe ► Lasted from
Nuclear Power Economics and Project Structuring 2017 Edition
The cost of nuclear power plants l
Lauri Myllyvirta energy campaigner (Finland)
Financial calculators on Web
Solar Energy can it be competitive with other sources of electricity?
Business Plan.
Is nuclear so expensive because the environmentalists have been making so much trouble? WISE 40 jaar: Feestelijk Congres Amsterdam November 16, 2018 Steve.
Generation Expansion Daniel Kirschen
Time to cancel Hinkley Point C
Group E1 - Improving financing NPP QUESTIONS / DIFFICULTIES
B.A. Kalin, A.N. Silenko, V.V. Kharitonov, and Yu.A. Ul’yanin
Presentation transcript:

the University of Greenwich Teaching excellence for 100 years The Economics of Nuclear Power Myths of nuclear power: A guide Moscow 5 April 2011 Steve Thomas PSIRU ( Business Schoolwww.psiru.org University of Greenwich

the University of Greenwich Teaching excellence for 100 years Why did ordering stop in the West?  Nuclear power orders were easy to finance as long as utilities could pass on any costs to consumers – cost plus  Financiers knew loans would be repaid so finance was cheap & easy  In 1980 US regulators lost patience with nuclear plants that were late, over-budget & unnecessary. They made utilities pay extra costs from profits & utilities building nuclear risked bankruptcy  New ordering stopped overnight and about 80 existing orders were cancelled in mid-construction  In Europe, the introduction of competition meant companies that built plants that produced expensive power would fail

the University of Greenwich Teaching excellence for 100 years What is the Nuclear Renaissance?  Introduction of competitive markets meant nuclear vendors knew they had to compete to survive  1998, they calculated construction costs had to be $1000/kW to compete with gas - a 1000MW reactor would cost $1bn  Nuclear designers claimed new ‘evolutionary’ designs would be safer, but simpler and therefore cheaper, <$1000/kW  New designs, Gen III+ emerged: AP1000, ESBWR, EPR  Nuclear industry claimed these would be so attractive that countries that had abandoned nuclear, eg, USA, Germany, UK, Italy would re-start ordering – a Nuclear Renaissance

the University of Greenwich Teaching excellence for 100 years Is the Renaissance happening?  Progress was slow and by 2008, people were asking if the Renaissance would actually happen  Since Jan 2008, construction work has started on 37 reactors. Surely the Renaissance is now underway  But 24 of these are in China, 6 in Russia, 3 in Korea. One is a 1975 order for Brazil. All in countries where electricity is still effectively a monopoly and utilities are publicly owned  Only 6 orders are for designs licensable in Europe or USA  So for Gen III+ designs and for Europe and USA the Renaissance is not happening

the University of Greenwich Teaching excellence for 100 years Why? 1. Economics and commercial risk? 2. Designs/licensing issues? 3. Opposition and bureaucracy?

the University of Greenwich Teaching excellence for 100 years Gen III+ designs on offer 5 Gen III+ designs being evaluated by the USA: 1. Areva EPR. Generic approval in France or Finland not completed despite construction. No approval in USA or UK until orders China 2. Westinghouse AP Regulatory approval in USA not before Under assessment in UK but no approval before orders (China) 3. GE ESBWR, based on SBWR. US regulatory approval forecast for 2011, but all 6 potential orders in doubt 4. GE-Hitachi & Toshiba ABWR. Certified in US in 1997 but approval runs out possible US project 5. Mitsubishi APWR no NRC approval end possible US project

the University of Greenwich Teaching excellence for 100 years Other designs  Areva SWR/Kerena. Update of 1970s BWR. Not developed  Areva Atmea. 1100MW PWR. At early design stage. 3-loop EPR?  Korea APR sold to UAE but no aircraft protection or core- catcher. Lauvergeon: like a car with no seat-belts or air bag. Gen III? Considered by S Africa, may be upgraded for Europe  Russia AES Russian orders, not assessed in West  China CP units in service, 15 under construction in China. Based on 1970s French design. EDF and Areva separately thinking about collaborating and S Africa thinking of buying. Gen II+?

the University of Greenwich Teaching excellence for 100 years Regulatory Issues  In 2002, US’s Nuclear 2010 programme assumed order for Gen III+ design could be placed in Now likely that first US Gen III+ order will be nearer 2013  US NRC won’t complete generic review of 5 designs before 2012: EPR mid 2013  UK NII says Generic Design Assesment ends in June 2011: interim approvals, which would not suffice for construction of the reactors to begin in the UK, appear at the moment to be more likely than final approvals for both designs for the June 2011 timeline.  UK construction start not before 2013

the University of Greenwich Teaching excellence for 100 years Impact of Fukushima on design reviews  Experience with TMI, Chernobyl suggests it will take a long time – 5 years? - to work out what happened at Fukushima  Designers will then take at least 5 years to modify designs to take account of lessons  How can UK and USA complete generic design reviews is lessons from Fukushima are not known?

the University of Greenwich Teaching excellence for 100 years What determines nuclear power cost?  Construction cost and time, cost of capital and reliability  Paying construction cost & interest expected to account for about 2/3 of cost of power. The reliability of the plant (load factor) determines how thinly fixed costs can be spread  Operations & maintenance cost. Expected to be low but British Energy went bust because O&M more than revenue.

the University of Greenwich Teaching excellence for 100 years Little impact for investment decisions, but major commitment by public  Decommissioning & waste disposal provision. If cost accurately forecast, provisions collected and invested safely, not a major cost today. Discounted away  But no experience of high-level waste disposal and little experience of decommissioning.  How can we forecast what this will cost & how do we ensure provisions are safe and earn interest at the rate expected?  We are asking a future generation to clean up our waste. If provisions are inadequate, they will have to pay as well

the University of Greenwich Teaching excellence for 100 years Little impact for investment decisions, but major commitment by public  Fuel cost. Nuclear fuel purchase is a small part of the generation cost. But if nuclear was expected to make a major contribution on climate change, uranium resources would be important  Environmental impact of uranium mining substantial but in developing countries  Insurance and liability cover. International treaties mean governments bear the main risk but even limited cover is expensive.

the University of Greenwich Teaching excellence for 100 years Construction cost  Renaissance sold to public on a promise of US$1000/kW  Most serious recent estimates & bids are for about $6000/kW  EPR, AP1000 and ABWR have bid more than $6000 in all contests entered (UAE, Canada & S Africa) in past 3 years  Have real costs escalated or was $1000/kW an unrealistic target?

the University of Greenwich Teaching excellence for 100 years Cost of capital: Is nuclear too risky?  Banks not willing to be exposed to commercial risk of nuclear power, who can take that risk? Consumers via cost pass-through, tax-payers via government loan guarantees or vendors via ‘turnkey’ contracts Are tax-payers, elec consumers or vendors willing? Are turnkey contracts credible after Olkiluoto? Will the Electricity Directive allow cost pass-through? Is fixed ‘C’ price desirable or feasible? Would it be enough?

the University of Greenwich Teaching excellence for 100 years Loan guarantees  Central to US efforts. Loan guarantees allowed for 100% of borrowing up to 80% of cost. EPR offered loan guarantees worth about $8bn  If fee is ‘economic’, no advantage to loan guarantees because risk is same if you are a bank or a government  Loan guarantees for Olkiluoto not state aid according to Commission because fee paid, but what was the fee?  Vogtle (USA) selling to monopoly market & guaranteed cost recovery. Loan guarantees not essential and fee 1-1.5%  Calvert Cliffs (an EPR) selling to competitive market (PJM). Fee 11.6%. Project expected to be abandoned

the University of Greenwich Teaching excellence for 100 years Generation III+. Simpler or more complex?  US Department of Energy (2003): New Generation III+ designs... have the advantage of combining technology familiar to operators of current plants with vastly improved safety features and significant simplification is expected to result in lower and more predictable construction and operating costs  ESBWR = Economic Simplified Boiling Water Reactor  Lauvergeon (2010): the cost of nuclear reactors has "always" gone up with each generation, because the safety requirements are ever higher. "Safety has a cost,"  Roussely (2010): The resulting complexity of the EPR, arising from the choice of design, specifically the level of power, the containment, the core catcher and the redundancy of the security systems is certainly a handicap for its construction and therefore its cost.

the University of Greenwich Teaching excellence for 100 years Generation III+. Too much or too little redundancy?  HSE, ASN, STUK (2009): ‘The EPR design, as originally proposed by the licensees and the manufacturer, AREVA, doesn't comply with the independence principle, as there is a very high degree of complex interconnectivity between the control and safety systems.’  Roussely (2010): The resulting complexity of the EPR, arising from the choice of design, specifically the level of power, the containment, the core catcher and the redundancy of the security systems is certainly a handicap for its construction and therefore its cost.

the University of Greenwich Teaching excellence for 100 years Impact of Fukushima on construction costs All significant accidents to date beyond design basis: Browns Ferry, TMI, Chernobyl, 9/11  Browns Ferry: Need for independent systems for each unit  TMI: Need for redundancy  Chernobyl: Need for ‘passive’ safety – if everything fails, plant will naturally revert to safe state  9/11: Need for containments to be strong enough to withstand collision with large aircraft  Are we asking too much of designers to imagine all possible events sequences?  Too early to say what design modifications will be needed but likely to be extensive and expensive

the University of Greenwich Teaching excellence for 100 years Multi-speed regulatory requirements?  Lauvergeon (2010): [Is] there is going to be a nuclear [market] at two speeds — meaning a high-tech, high-safety mode for developed countries and a lower-safety mode for emerging countries?  S Africa may buy from China (Gen II+), Korea (Gen III)  NRC Commissioner Apostolakis (2010): The core catcher included in designs of new reactors to be constructed in Europe will not be required in the US because its benefits cannot be shown to outweigh its costs  Is AP1000 licensable in Europe?

the University of Greenwich Teaching excellence for 100 years The myth of the French nuclear programme  France built 58 large reactors in 20 years under ideal conditions. Scale economies, standardisation, technical progress, learning, cheap component production methods, no public opposition, supportive regulation  But real construction costs tripled over 20 years  Roussely: while the average capacity of nuclear power worldwide - measured by the capacity factor - has increased significantly over the past fifteen years, the French nuclear plant capacity has sharply declined in recent years  After 2 years construction, Flamanville is 2 years late and 50% over-budget

the University of Greenwich Teaching excellence for 100 years Why no Renaissance?  US NRC Commissioner Jaczko (2010): ‘What utilities are looking at right now, is developing and preserving the option... to construct a reactor at some point in the future, if they receive a license. I think the process really now is more about the option to build, than it is about construction.’  Gen III plants are too expensive & will only be built if consumers pay the extra and consumers or taxpayers take the risk  To protect reactors against core melt and aircraft crashes makes them too expensive

the University of Greenwich Teaching excellence for 100 years Other impacts of Fukushima Reviews needed of:  Accident liability arrangements – who pays for accidents  Siting criteria – earthquakes, evacuation zones  Decommissioning arrangements  Use of Mixed Oxide Fuel  Spent fuel ponds – a major risk if not in the containment  Are existing plants safe enough?

the University of Greenwich Teaching excellence for 100 years Conclusion  Why for entire 50 years of commercial history have nuclear costs always gone up?  Yet again, nuclear industry has promised: ‘we have learnt from our mistakes, we have new designs that will solve past problems, this time we will get it right’. How many last chances will we give them  Main problem is not money wasted on uneconomic plants or that large numbers of reactors will be built, but opportunity cost of continuing to neglect options that will deliver  Delays and extra costs from Fukushima may be the final straw for the Nuclear Renaissance