Submission doc.: IEEE 11-13/0586r0 May 2013 Hiroki Nakano, Trans New Technology, Inc.Slide 1 Comparison of IE fragmentation proposals Date: 2013-05-15.

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Doc.: IEEE /1259r0 Submission Nov 2009 Michael Bahr, Siemens AGSlide 1 RFI Tüddelkram Date: Authors:
Doc.: IEEE /0044r0 Submission July 2010 John R. Barr, JRBarr, Ltd.Slide 1 IEEE 802 Submission to ITU-R on 60 GHz Notice: This document has been.
Doc.: IEEE /1392r0 Submission November 12, 2008 De Vegt (Qualcomm)Slide 1 Inputs for a VHT Selection Procedure Date: Authors:
Doc.: IEEE /0410r2 Submission March 2011 Slide 1 Data Transmission Protection on the IEEE ac MU-MIMO Downlink Date: Authors:
Doc.: IEEE r0 Submission July 2010 John R. Barr, JRBarr, Ltd.Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0237r0 Submission February 12, 2009 Rolf de Vegt (Qualcomm)Slide 1 Inputs for a ac Spec Framework Methodology Date:
Doc.: IEEE /0953r0 Submission Sept 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Sept 2009 Date: Authors:
Doc.: IEEE /0953r1 Submission November 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Nov 2009 Date: Authors:
Doc.: IEEE /0444r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide TGmb Editors Report – May 2009 Date: Authors:
Doc.: IEEE /0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide TGn Editor Report May 2009 Date: Authors:
Doc.: IEEE /0358r0 Submission March 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac March 2013 Closing Report Date: Authors:
Doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac September 2013 Closing Report Date:
Submission doc.: IEEE /0325r0 March 2012 Slide 1 TIM Enhancement With Group Bits Date: Authors: Zhong-Yi Jin, Nokia.
Doc.: IEEE /1177 Submission September 2013 Giwon Park, LG ElectronicsSlide 1 Clarification of the Link Setup Bursty parameter (CID 2547, 3214)
Submission doc.: IEEE 11-12/0553r0 May 2012 Jarkko Kneckt, NokiaSlide 1 Response Criteria of Probe Request Date: Authors:
Submission doc.: IEEE /1326r1 August 2011 Hiroki Nakano, Trans New Technology, Inc.Slide 1 Early Key Generation by ECDH and PKC Date:
Doc. No. IEEE hew-r2 Submission May 2013 Klaus Doppler, NokiaSlide 1 Dense apartment building use case for HEW Date: May 14, 2013 Authors:
Doc.: IEEE /0990r0 Submission July 2014 Al Petrick, JPASlide Liaison Report Date: Authors:
Submission doc.: IEEE 11-13/1230r1 September 2013 Donald Eastlake, Huawei TechnologiesSlide 1 TGak September Closing Report Date: Authors: NameAddressAffiliationsPhone .
Doc.: IEEE b Submission April 2005 Liang Li, WXZJ Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Submission doc.: IEEE 11-13/0487r0 May 2013 Dan Harkins, Aruba NetworksSlide 1 How To Fragment An IE Date: Authors:
Doc.: IEEE /0093r2 Submission NameAffiliationsAddressPhone Hitoshi MORIOKAAllied Telesis R&D Center Tenjin, Chuo-ku, Fukuoka
Doc.: IEEE sru Submission November 2011 Shoichi Kitazawa, ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE OmniRAN-13/0069r0 Submission September 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Submission doc.: IEEE /0802r0 July 2013 Y.Inoue (NTT), A.Yamada (NTT docomo)Slide 1 Proposed re-categorization of the usage models Date: xx.
April 2009 doc.: IEEE /xxxxr0 May 2014
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0060r0 Submission May 2013 Mika Kasslin, NokiaSlide 1 Initial review of comments related to new no votes Notice: This document has.
Doc.: IEEE /1367r0 Submission Nov 2013 Mingguang Xu, et. Al.Slide 1 Tx EVM for MCS-10 in ah Date: Authors:
IEEE ah Requirements Discussion
Doc.: IEEE /0295r0 Submission PRAW Follow Up Date: Authors: March 2013.
Doc.: IEEE /0618r2 Submission May 2014 Yunsong Yang, HuaweiSlide 1 TGaq CAG Number IE Date: Authors:
Submission doc.: IEEE 11-12/0271r1 March 2012 Hiroki Nakano, Trans New Technology, Inc.Slide 1 SFD Text for Big IE Date: Authors: NameAffiliationsAddressPhone .
Submission doc.: IEEE /1167r0 August 2011 Hiroki Nakano, Trans New Technology, Inc.Slide 1 Upper Layer Data IE Date: Authors: NameAffiliationsAddressPhone .
Submission doc.: IEEE /1124r0 August 2011 Hiroki Nakano, Trans New Technology, Inc.Slide 1 Example of IP address assignment using Generic Upper.
Doc.: IEEE sru Submission January 2013 Shoichi Kitazawa, ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Submission doc.: IEEE 11-13/1389r1 November 2013 Kiseon Ryu et.al, LG ElectronicsSlide 1 Discussion on HEW PAR Date: Authors:
Doc.: IEEE /0693r0 Submission May 2014 Marc Emmelmann, SELFSlide 1 TGai July Ad-Hoc Information Date: Authors:
Doc.: IEEE /0059r3 Submission January 2010 Hiroki Nakano, Trans New Technology, Inc.Slide 1 An Example Protocol for FastAKM Date: Authors:
Doc.: IEEE sru Submission May 2014 Shoichi Kitazawa(ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE g November, 2010 Daniel Popa, ITRON Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Submission doc: IEEE m March 2013 Rolfe/GilbSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /0870r0 Submission June 2011 MediaTek BF Clarifications Date: Authors: Slide 1.
ZTE corporation doc.: IEEE /1086r2 September 2012 Submission TIM Compression for No Buffered Unicast Traffic Date: Slide 1 Authors:
Doc.: IEEE xxx g Submission March 2011 Kuor Hsin Chang, Bob Mason (Elster Solutions) Project: IEEE P Working Group for Wireless.
Doc.: IEEE /0810r0 Submission May 2011 Minho Cheong, ETRISlide 1 Selection of Key Requirement Elements for Baseline FR-EM Document Date:
Submission doc.: IEEE 11-12/0694r0 May 2012 Jarkko Kneckt (Nokia)Slide 1 Active scanning ad hoc report Date: Authors:
Submission doc.: IEEE ai November 2012 Lei Wang, InterDigital CommunicationsSlide 1 Proposals for the FD Frame Capability, Security and.
Doc.: IEEE /1457r0 Submission December 2010 David Halasz, OakTree WirelessSlide 1 Frequency Hopping Review and IEEE ah Date:
Doc.: IEEE /0517r0 May 2013 Submission Slide 1 Authors: Combining Process in Virtual CS Mechanism for ah Date: Lv kaiying, ZTE.
Doc.: IEEE /0371r0 Submission March 2012 Ron Porat, Broadcom BF Feedback and Protocol Date: Authors: Slide 1.
Doc.: IEEE /0373r0 Submission March 2012 Ron Porat, Broadcom BF Frame Format Date: Authors: Slide 1.
Doc.: IEEE /0995r0 Submission July 2011 Nir Shapira, Celeno Communications Determination of Ng in MU mode (CID 3432) Date: Authors:
Doc.: IEEE /0782r0 Submission July 2010 Daewon Lee, LG ElectronicsSlide 1 STA MU-MIMO Group Management Signaling Design Date: Authors:
TIM Compression Date: Authors: January 2012 Month Year
Submission doc.: IEEE 11-14/0141r0 January 2014 Jarkko Kneckt (Nokia)Slide 1 Element Fragmentation Date: Authors:
Submission doc.: IEEE /1003r1 July 2011 Hiroki Nakano, Trans New Technology, Inc.Slide 1 Upper Layer Data on Management frames Date:
Submission doc.: IEEE 11-12/0273r8 May 2012 Hiroki Nakano, Trans New Technology, Inc.Slide 1 SFD Text for Upper Layers Date: Authors: NameAffiliationsAddressPhone .
Submission doc.: IEEE 11-12/0273r9 May 2012 Hiroki Nakano, Trans New Technology, Inc.Slide 1 SFD Text for Upper Layers Date: Authors: NameAffiliationsAddressPhone .
Submission doc.: IEEE /1003r2 July 2011 Hiroki Nakano, Trans New Technology, Inc.Slide 1 Upper Layer Data on Management frames Date:
Doc.: IEEE ai Submission NameAffiliationsAddressPhone George Calcev Huawei Technologies Co., Ltd. huawei.com TGai.
Submission doc.: IEEE /1034r4 September 2012 Jeongki Kim, LG ElectronicsSlide 1 Enhanced scanning procedure for FILS Date: Authors:
Doc.: IEEE /1042r1 Submission NameAffiliationsAddressPhone Giwon ParkLG Electronics LG R&D Complex 533, Hogye- 1dong, Dongan-Gu, Anyang,
Doc.: IEEE /0133r3 Submission NameAffiliationsAddressPhone Hitoshi MORIOKAAllied Telesis R&D Center Tenjin, Chuo-ku, Fukuoka
Submission doc.: IEEE 11-12/0273r7 May 2012 Hiroki Nakano, Trans New Technology, Inc.Slide 1 SFD Text for Upper Layers Date: Authors: NameAffiliationsAddressPhone .
Submission doc.: IEEE 11-12/0273r5 March 2012 Hiroki Nakano, Trans New Technology, Inc.Slide 1 SFD Text for Upper Layers Date: Authors: NameAffiliationsAddressPhone .
CR for CID 1115 Date: Authors: May 2019
Presentation transcript:

Submission doc.: IEEE 11-13/0586r0 May 2013 Hiroki Nakano, Trans New Technology, Inc.Slide 1 Comparison of IE fragmentation proposals Date: Authors: NameAffiliationsAddressPhone Hiroki NakanoTrans New Technology, Inc. Kyoto, JP ans-nt.com

Submission doc.: IEEE 11-13/0586r0 May 2013 Hiroki Nakano, Trans New Technology, Inc.Slide 2 Abstract This presentation compares proposals of the following proposals to fragment IEs: 311r2 478r2

Submission doc.: IEEE 11-13/0586r0 Comparison Normative text311r2478r2 Supplementary slides201r10487r0 Basic methodSplit data into Multiple Fragment IEs Splitting ruleMultiple 255 byte-long IEs + a small IE for the residue IDs of types of dataNew seriesSame as existing IEs IE orderingNo change (ascending order) Add a new exception (See the next slide) Top IE of a seriesFragment IEAccording to data Last IE of a seriesFragment IE having less than 255 byte-long data Fragment IE before another IE than Fragment IE Size of encoded data (n mod 255 != 0) n + 2 * int(n / 255) + 3n + 2 * int(n / 255) + 2 (n mod 255 == 0)n + 2 * int(n / 255) + 3n + 2 * int(n / 255) Slide 3Hiroki Nakano, Trans New Technology, Inc. May 2013

Submission doc.: IEEE 11-13/0586r0 Draft P802.11REVmc_D1.4 Page 619 Line 53 The frame body components specified for many management subtypes result in elements ordered by ascending Element ID, with the exception of the MIC Management element ( (Management MIC element)). If present, the MIC Management element appears at the end of the robust management frame body. See (Element parsing) on the parsing of elements. Slide 4Hiroki Nakano, Trans New Technology, Inc. May 2013

Submission doc.: IEEE 11-13/0586r0 Strawpoll Which proposal do you like? 311r2 478r2 Don’t care Slide 5Hiroki Nakano, Trans New Technology, Inc. May 2013

Submission doc.: IEEE 11-13/0586r0May 2013 Hiroki Nakano, Trans New Technology, Inc. Slide 6 References ai-fils-handling-of-large-objects.pptx ai-proposed-resolutions-for-assigned- security-cids.docx ai-fragmenting-large-ies.docx ai-how-to-fragment-an-ie.ppt