XX. SoGAT Meeting Warsaw 12./13. June 2007 IU vs. NAT-Detectable Units Albrecht Gröner CSL Behring Virology Marburg, Germany.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

Números.
1 A B C
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
EuroCondens SGB E.
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
Sequential Logic Design
Copyright © 2013 Elsevier Inc. All rights reserved.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
STATISTICS INTERVAL ESTIMATION Professor Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering National Taiwan University.
Addition and Subtraction Equations
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
David Burdett May 11, 2004 Package Binding for WS CDL.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
2.11.
The 5S numbers game..
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Media-Monitoring Final Report April - May 2010 News.
Sampling in Marketing Research
Break Time Remaining 10:00.
The basics for simulations
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
+ Plan de la séance: La logique de lanalyse factorielle Analyse en composantes principales/ Analyse des correspondances multiples Introduction à lanalyse.
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
Figure 3–1 Standard logic symbols for the inverter (ANSI/IEEE Std
Regression with Panel Data
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
Midterm Review Part II Midterm Review Part II 40.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Click Here to Begin 1. These are cheeks teeth ears eyebrows.
: 3 00.
5 minutes.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Let’s take a 15 minute break Please be back on time.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
& dding ubtracting ractions.
Copyright © 2013 Pearson Education, Inc. All rights reserved Chapter 11 Simple Linear Regression.
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Presidential Fitness Program Pull/Push upMile RunShuttle RunSit-UpsV-Sit Stretch.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

XX. SoGAT Meeting Warsaw 12./13. June 2007 IU vs. NAT-Detectable Units Albrecht Gröner CSL Behring Virology Marburg, Germany

2 Gr International Units vs. NAT-Detectable Units International Units inter-laboratory comparison of results (e.g., virus load in samples) release of pools for fractionation (e.g., OMCLs) NAT-detectable units (genome equivalent (GE)) detection of virus genomes in samples intra-laboratory comparison of results (if assay performance is very stable) 2 – Gröner 13. June 2007

3 Gr Conversion Factor IU  GE Necessity to define conversion factor quantification of virus particles in sample defined by NAT in order to assess risk for virus transmission CPMP/BWP/5180/03 (Guideline on assessing the risk for virus transmission – new chapter 6 of the note for guidance on plasma-derived medicinal products (CPMP/BWP/269/95)) requests a quantitative estimation of the probability of a virus contaminant being present in a defined dose of final product taking into account - as a conservative approach - viral genomes as an indicator of potentially infectious virus particles in the starting material 3 – Gröner 13. June 2007

4 Gr Detection of Virus Genome in Sample Fig 1a: 97/656 International Standard Ecstimated RNA Copies or PCR Detectable Units (log10/ml) neg IHCASIH AL B3 CAS IH TMA AS B3 CM M M M UCM CM M M M* N N CM N HIV NIBSC – Gröner 13. June 2007

5 Gr Detection of Virus Genome in Sample HIV Fig 1h: RU570 Subtype H (S02) Estimated RNA Copies or PCR Detectable Units (log10/ml) neg N N N IH AS TMA AL B3 CAS IH M M UCM CAS CM M M M M* Monitor assaysNuclisensbDNA 3Abbott LCxIn-HouseAmpliscreenTMA NIBSC – Gröner 13. June 2007

6 Gr Detection of Virus Genome in Sample NIBSC HIV 6 – Gröner 13. June 2007

7 Gr Detection of Virus Genome in Sample Saldanha et al. Vox Sang 2005;89:52-58 HAV International Standard 7 – Gröner 13. June 2007

8 Gr Detection of Virus Genome in Sample Saldanha et al. Vox Sang 1999;76: HCV International Standard 8 – Gröner 13. June 2007

9 Gr Conversion Factor IU  GE Is a general conversion factor necessary (and justifiable)? Conversion factor can only be determined for each laboratory employing a validated assay A generic conversion factor for IUs to GE is not appropriate due to differences in analytical sensitivity of assays in different laboratories Quantitative infectivity of viruses (inf. units) vs. NAT detectable units unknown Relevance of Conversion Factor? 9 – Gröner 13. June 2007