Marv Landauer Report to TSS on RS Activities April 25-27, 2012 Salt Lake City.

Slides:



Advertisements
Similar presentations
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
Frequency Responsive Reserve Process Update
WECC Operating Committee Request for Discussion and Guidance MOD-001-WECC-RBP-0 Reliability Data Exchange (MOD) October 24, 2013.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
WECC Standards Committee Joint Session
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
WECC System Performance Criteria 1st Team Meeting Background
INT-008-WECC-RBP-2 Mike Pfeister Salt River Project Joint Session January 10, 2013.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
Notice of Proposed Rulemaking on Standards WECC Board of Directors Meeting December 7-8, 2006.
ERO Filing and WECC Delegation Agreement Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake.
Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
Tier One Standards Update Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake City, Utah.
Status of NERC Standards Activity Joint Guidance Committee Meeting January 23-24, 2007 Steve Rueckert - WECC Director, Standards and Compliance.
Overview of WECC Comments to FERC on the NOPR Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Gene Henneberg RAS Criterion Drafting Team Chair WECC Reliability Subcommittee’s RAS Criterion Concerns 4/28/2011 San Diego, California.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Doug Tucker of WECC & Milorad Papic of IPC 2012 TRD/TADS Webinar October 23, 2012.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 26 th, 2014 Salt Lake City, UT.
WECC-0100 Drafting Team Orientation TPL-001-WECC-RBP-2.1 System Performance Drafting Team Meeting.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Presented to PGDTF February 11, 2015
Allan Wick, CFE, CPP, PSP, PCI, CBCP Chief Security Officer WECC Joint Meeting October 8, 2014.
Steve Rueckert Director of Standards Standards Update June 5, 2014 Joint Guidance Committee Meeting Salt Lake City, UT.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
RFC Webinar June 17, 2009 Presented By: Mark Kuras Chair, UFLS SDT.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Project WECC-0100 Update Reliability Subcommittee February 2014.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
Standards Review Subcommittee Update August 17, 2010.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional.
Standards Update Merrill Brimhall Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
RASRS Report to Operating Committee March 22, 2015 Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee W ESTERN E LECTRICITY C OORDINATING.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
WECC – NERC Standards Update
RASRS Report to Operating Committee March 21, 2017
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Modifications to Planning Charter
WECC Regional Standards Update
Merrill Brimhall – Engineer, Staff
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Compliance Open Webinar
2017 System Assessment Jonathan Young February 2017
Planning Coordinator Gap Update March 25, 2014
NERC PRC Drafting Team Voltage Ride-Through (VRT) Curve Genesis
Compliance Open Webinar
Project WECC-0100 Update Reliability Subcommittee
Steve Rueckert – Director of Standards
TPL Voltage Guideline Presented to TSS Baj Agrawal Arizona Public Service Co. 8/21/2017.
WECC – NERC Standards Update
Planning Meeting November 4, 2010 Marv Landauer.
Standards Development Process
Presentation transcript:

Marv Landauer Report to TSS on RS Activities April 25-27, 2012 Salt Lake City

2 Performance Category Upgrade Requests were approved by RS and PCC  Hassayampa-Pinal West and Hassayampa-Jojoba 500 kV  Hassayampa-Pinal West and Jojoba-Kyrene 500kV The modified WECC TPL System Performance Criteria was approved by the WECC BOD December 1, 2012 and became effective April 1, Modifications include: o Modified the definition of Adjacent Transmission Circuits o Removed the definition for Common Corridor o Modified the applicability of the Adjacent Circuits Requirement R1.1 RS Activities

3 There are inconsistencies between new WECC Adjacent Circuit Criteria and Regional Difference in FAC 010 and 011 Standards The intent is for the WECC Adjacent Transmission Circuit definition developed in the criterion to apply to Requirement E in the WECC Difference in the FAC 010 and 011 Standards, but the definition may not apply until the WECC Difference in the FAC Standards is modified. The RS is drafting a short document stating its understanding that System Operators do not need to operate to more stringent adjacent circuits criterion than what the system is planned for. An ad hoc group was formed to scope out the inconsistencies between the WECC TPL System Performance Criteria and the WECC Difference in the NERC FAC-010 and 011 Standards that might support a future Standards Authorization Request (SAR). Operations and Planning Criteria Differences

4 The NERC-TPL Standard was filed with FERC October 19, 2011 RS is preparing a SAR to align the proposed NERC Transmission Planning Standard TPL and the WECC TPL System Performance Criteria and also provide other clarifications and refinements to the WECC criteria as needed. Two mapping documents were prepared o TPL events P0 thru P7 and their relationship to Categories A, B, and C from the existing NERC TPL Standards. o TPL events P0 thru P7 and their relationship to the existing WECC disturbance/performance table. o Distributed at the January TSS meeting for comment. SAR to Align WECC Planning Criteria with NERC TPL Standard

5 Impact of High Transfers in a common corridor with the new Adjacent Transmission Circuits Definition was discussed at the January 2012 RS meeting. o how much risk is acceptable o by what means potential load would be lost o the bounds of the criteria o other criteria that may provide guidance, etc. RS preparing response to TSS request on clarification of WECC Standard WRS1.2 RS Activities

Questions?

7 Drafting Team Finalized Adjacent Circuit Criteria (WRS1.1) at September 7 meeting:  Criteria does not apply to internal systems  3 mile total exemption for station entrances, river crossings, etc.  Minimum separation of 250 feet for Adjacent Circuits  Only applicable if both circuits are above 300 KV  Only applies to adjacent circuits In previous proposal, a lower voltage intermediate circuit would not impact adjacency if outer circuits were within 250 feet (not raising the bar) - new  Approved by PCC in October  Approved by Board with April 2012 implementation RS Update