NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Standards Review Subcommittee Update February 19, 2013.
Standards Review Subcommittee Update April 30, 2013.
Road Map To Development September 2013 December 2013 February 2014 April 2014 July 2014 Data Submission WEQ 008 Assessment CO 283 Report GTL COs Draft.
National Thousands Block Number Pooling Services NANC Meeting September 25, 2003.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
TRDTF Transmission Reliability Database Task Force Update & Approval Vote Brian Keel SRP
WECC TRD/NERC TADS Webinar
Bulk Electric System Definition Task Force Update Michelle Mizumori June 18, 2009 Salt Lake City.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
The Western Electricity Coordinating Council Doug Tucker of WECC & Brian Keel of SRP November 16, TRD/TADS Webinar.
The Western Electricity Coordinating Council Doug Tucker Associate Engineer September 22, TRD/TADS Webinar.
1 Compliance Report WECC Board of Directors Meeting December 7-8, 2006 Steve Rueckert Director, Standards and Compliance.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair.
MIC/ISAS LIAISON REPORT June 15, 2007 April, 2007 ISAS Meeting Highlights.
Status of NERC Standards Activity Joint Guidance Committee Meeting January 23-24, 2007 Steve Rueckert - WECC Director, Standards and Compliance.
Clinical Management for Behavioral Health Services (CMBHS) Mental Health Implementation Project Update Presented October 9th and 16th, 2012.
Special Registry/Industry Q&A Session ALLOWABLE COSTS SUBMISSIONS
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Support Services Review Support Services Review (SSR) is a representative, responsive form of assessment and self-evaluation to ensure continuous quality.
Race to the Top Years 2 to 4 Finish line webinars July
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee July 2014.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Doug Tucker of WECC & Milorad Papic of IPC 2012 TRD/TADS Webinar October 23, 2012.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
CUG Meeting June 3 – 5 Salt Lake City, UT
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
What is an EMA?  The Education Maintenance Allowance (EMA) is a means tested weekly payment of £30 paid directly to young people (age 16-19) who have.
Capacity Allocation & Congestion Management Network Codes Stakeholder Meeting 3 July 2012 Introduction & Overview \
PIMS Basics: Who Reports What to Whom and How the Data is Used
WIOA Timeline and Action Plan for States
Presented to PGDTF February 11, 2015
PER Update & Compliance Lessons Learned
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
RPEWG Report Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014 RS Meeting 1.
Transmission Availability Data System (TADS) TADS Workshops: January 16, 2008 and February 6, UPDATED Workshop Session 2: Forms.
Employment and Training Administration DEPARTMENT OF LABOR ETA Reporting and Data Validation Updates Presenters: Wes Day Barbara Strother Greg Wilson ETA’s.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
Project Definition of Bulk Electric System Presenter: Peter Heidrich – Drafting Team Chair Date: March 1, 2011.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Review of TADS Data for 2012 Voltage Class Name Metric AC Transmission Outages - Failed Protection System Equipment AC Transmission Outages - Human Error.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
WECC Regional Standards Update
Western Electricity Coordinating Council
Merrill Brimhall – Engineer, Staff
Workshop Session 2: Forms
Teacher Student Data Link (TSDL)
Workshop Session 1: Overview
WECC August 2017 Reliability Workshop James Merlo, PhD
Project Definition of Bulk Electric System
Workshop Session 1: Overview
Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014
WECC August 2017 Reliability Workshop James Merlo, PhD
Presentation transcript:

NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

WECC Specific TADS Information Agenda TADS Transition Quarterly Reporting Key Inventory Fields Bulk Electric System Alignment TADS Training/Webinars WECC Specific TADS Information WECC TO Direct Upload Importing TRD Data Into TADS WECC-FAC-501 Study Update

TADS Transition Timeline Date TADS Outage Data Key Inventory Data March 01, 2013 TADS 2012 Annual Data Reporting Submittal Deadline (200 kV+ Elements Only) June 30, 2013 Element Identifier and Circuit Mileage Fields Only (200 kV+ Elements Only) September 30, 2013 TADS 2013Q1 and 2013Q2 Data Submittal Deadline November 15, 2013 TADS 2013Q3 Data Submittal Deadline February 15, 2014 TADS 2013Q4 Data Submittal Deadline Update All Key Inventory Fields May 15, 2014 TADS 2014Q1 Data Submittal Deadline (All TADS Elements) Element Identifier and Circuit Mileage Fields Only (Less than 200 kV Elements Only) August 15, 2014 TADS 2014 Q2 Data Submittal Deadline (All TADS Elements) November 15, 2014 TADS 2014 Q3 Data Submittal Deadline (All TADS Elements) February 15, 2015 TADS 2014 Q4 Data Submittal Deadline

TADS Quarterly Reporting TADS Changing from Annual to Quarterly Reporting Schedule Transmission Owners Should Submit TADS Outage Data 45 Days After Each Quarter Data Changes for Prior Quarters: During entry period, can update prior quarter outages Freeze Period After entry period ends, prior quarter outages are “frozen” and cannot be edited Current quarter outages, however, can be added/updated Deep-Freeze At end of Quarter 4 reporting, all outage and inventory data can no longer be edited

TADS Key Inventory Fields TADS Changing from Summary Inventory to Individual Inventory Inventory Forms Closely Resemble TRD, but Some Differences Entity Unique Element ID Added In lieu of TO Operator name and Element ID (e.g. TOElement1) Can be Alphanumeric, including underscore {Regional Entity, NCR, Element ID} combination will be unique NERC-wide Instead of “In-service Date”, “Change/Reconfiguration Date” Should be modified when circuit miles change to calculate proper equivalent circuit miles Instead of “Parent Code”, “Precursor Element” Can input multiple Precursor Elements

TADS Key Inventory Fields Common Corridor (WECC Only) Common Corridor information can be bulk uploaded into webTADS Follows TRD definitions AC Multi-Circuit Structure Miles calculated from Common Corridor TADS Considers Element In-service Date as 1/1/2013 if Element In-service Date is ≤ 12/31/2012 BES Exception Field to handle new BES definition

TADS Bulk Electric System Alignment TADS to Align with New Bulk Electric System Definition in 2014 Includes the Following BES Elements: AC Circuits DC Circuits Transmission Transformers (No GSUs) AC/DC Back to Back Converters Two New Voltage Classes BES 100-199 kV BES Less than 100 kV* *The Bulk Electric System definition has a bright-line at 100 kV, but there is an option to include Less than 100 kV Elements by special inclusion

TADS Bulk Electric System Alignment Elements > 200 kV, but excluded from BES? 2013: Continue to report in TADS 2014: Mark Element in inventory as “BES Excepted” and retire Element as of 1/1/2014. Element is no longer TADS-reportable. BES Exceptions Approved After 1/1/2014: Mark Element in inventory as “BES Excepted” and retire Element as of BES Exception approval date. Element is no longer TADS-reportable after BES Exception approval date.

Additional Training Dates TBA for July, August, and September TADS Training 3 Combined Software/Data TADS Training Classes Prior to June 30 Deadline Will cover enough material for successful June 30 data submission Additional Training Dates TBA for July, August, and September Will cover enough material for successful September 30 data submission Date Training Type June 12, 2013 1 PM-3 PM ET Combined Software/Data Training June 19, 2013 June 26, 2013

WECC Specific TADS Information WECC Transmission Owner Direct Upload WECC TOs will now upload to TADS directly instead of WECC DRE WECC 2012 TRD inventory data already uploaded into webTADS By June 30, WECC TOs should verify that all of their Element IDs are in webTADS and that circuit mileage for Elements is accurate as of January 1, 2013 By September 30, WECC TOs should upload their outage data into webTADS Possible to Have WECC-Specific Training, if Desired

WECC-FAC-501 Enhancements Trend average outage rates for the 7 sectors with more outages on lines with the standard over time Evaluate whether average outage rates have changed since 2008 Use outage rates per mile to see if the results are the same Study cause code impact on the 7 sectors: Controllable cause codes Failed AC Substation Equipment, Human Error, Failed AC Circuit Equipment, Failed Protection System Equipment Contamination, Foreign Interference, Power System Condition Vandalism (Terrorism, or Malicious Acts) Environmental, Vegetation, Fire, Other Uncontrollable cause codes Lightning, Weather excluding lightning, Unknown Consider outage duration, start time and climate (e.g., terrain) Consider violation records (FAC-501-1 and PRC-STD-005-1) IPC and BPA Pre-2008 Outage Analysis Analyzing Pre-2008 and Post-2008 Outage Data to Determine Effectiveness of WECC-FAC-501 Standard

Questions and Answers