Operating Reserves Task Force

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Operating Reserves and Variable Generation
PJM© PJM DOCs # Frequency Response Drafting Team Frequency Response Background Frequency Response Standard History Briefing on Frequency Response.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
BAL-002-WECC-1 Contingency Reserves
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
1 NERC Update WECC OC Meeting June 19, Two Items Variable Generation Reliability Reports.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
RES-E Impact on Transmission Grid and Power System Reserves
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Secure System Scheduling with High Wind Penetrations J. Kennedy March 2009.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Recent ERCOT Events Lessons Learned
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Slide 1 Large Wind Integration Challenges for Operations / System Reliability By : Steve Enyeart, BPA With contributions from: Bart McManus, BPA Roy Ellis,
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
1 The Tres Amigas SuperStation VLPGO November 2011.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Effect of generation loss and Frequency Response Characteristics (FRC) on tie-line flow to Southern Region under various scenarios and Target setting for.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
Operations Report Kent Saathoff System Operations ERCOT.
Integrating Wind Energy Capabilities of Wind Power Plants Mark Ahlstrom Wind Energy: A Good Citizen of the Electric Grid Four Corners Wind Resource Center.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
© 2016 Electric Power Research Institute, Inc. All rights reserved. Aidan Tuohy EPRI Grid Ops and Planning Iowa State University.
7. FREQUENCY CONTROL AND REGULATING RESERVES
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
NERC: Essential Reliability Services
Wind Management at MISO
Erik Ela, Eamonn Lannoye, Bob Entriken, Aidan Tuohy
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
Energy and Ancillary Services Design Stream Working Group Meeting 6
Grid Integration of Intermittent Resources
MIT tour of the California ISO Control Center March 31, 2015
Renewable energy builds a more reliable and resilient electricity mix
30 Minute Reserves EPFSTF January 4,
Sandip Sharma ERCOT Manager, Operations Planning
Forecasting and Operations CAISO Case
Presentation transcript:

Operating Reserves Task Force Erik Ela and Michael Milligan, NREL July 18, 2012 MIC Meeting

Proposal to WECC OC The VGS is proposing the creation of a task force to analyze the benefits and tradeoffs of different operating reserve calculation methods The task force would fall under the OC reporting structure, with VGS SMEs prepared to participate The task force would use tools and expertise from NREL

Task Force Objectives Step 1: Review of current and proposed methods for reserve requirements (continuation of VGS initiative) Step 2: Use requirements in simulation models and compare ACE and cost metrics among all methods Step 3: Look through data results to see what influences needs Step 4: Determine if new reserve requirement method is appropriate for recommendation

FESTIV Flexible Energy Scheduling Tool for Integration of VG SCUC, SCED, and AGC sub-models Models at high resolution Typically AGC, the highest resolution is at 2-6 seconds Models multiple time frames with communication between sub-models Multiple chances of forecast error and forecast correction Interval length, interval update frequency, process time and optimization horizon configurable Flexible operating structures All modeling timing parameters, how reserves are used, AGC mode of operation, etc. Deployment of operating reserves modeled Definitions defined by user Reserves are held in one sub-model and used in another Can measure effectiveness of operating reserves in terms of both costs and reliability

Operating Reserves and VG “Operating Reserves and Variable Generation” Erik Ela, Michael Milligan, and Brendan Kirby August 2011: http://www.nrel.gov/docs/fy11osti/51978.pdf What are the operating reserves standards and policies in practice? What types of operating reserve methods are being proposed in research? How does variable generation change the need?

Definitions (for this presentation) Operating Reserves: Capacity above or below that which is scheduled and used to maintain the active power balance of the system during operations Upward and downward response at all time scales For multitude of reasons: Maintain frequency at nominal level (60 Hz in U.S.) Reduce Area Control Error (ACE) to zero Assist neighboring balancing authority Reduce over flow of transmission lines and transformers Manage Voltage (mostly done with reactive power) Etc. Reactive Power Reserves: Reactive Power capacity to facilitate voltage control (not discussed here) Planning Reserves: Long term capacity to ensure system adequacy (not discussed here)

Operating Reserve Categorization Non-event Event Regulating Reserve Following Reserve Contingency Reserve Ramping Reserve Automatic Within optimal dispatch Manual Part of optimal dispatch Instantaneous Non-Instantaneous primary secondary tertiary secondary tertiary Stabilize Frequency Replace primary and secondary Replace secondary Return Frequency to nominal and/or ACE to zero Correct the current ACE Correct the anticipated ACE Return Frequency to nominal and/or ACE to zero

Regulation Reserve in North America Region Requirement Definition PJM Based on 1% of the peak load during peak hours and 1% of the valley peak during off-peak hours. NYISO Set requirement based on weekday/weekend, hour of day, and season. ERCOT Based on 98.8th percentile of regulation reserve utilized in previous 30 days and same month of previous year and adjusted by installed wind penetrations (described further below) CAISO Use a requirement floor of 350-MW up and down regulating reserves which can be adjusted based on load forecast, must-run instructions, previous CPS performance, and interchange and generation schedule changes. MISO Requirement made once a day based on conditions and before the day-ahead market closes. ISO-NE Based on month, hour of day, weekday/sat/sun.

Future methods with consideration of high penetration of Variable Generation

Wind Integration Study Summaries NYISO/NYSERDA 2005 (10% capacity): No additional contingency reserves. Regulating reserves require slight increase based on keeping 3 sigma of variability. Minnesota 2006 (25% energy): Regulating reserves based on geometric addition of load and wind variability, with wind variability based on 100 MW wind farms. Used 5 sigma. Load following reserve based on 2 sigma of five minute changes in net load. Operating reserve margin (comb. of load following and ramping reserve) based on hourly forecast errors and was a dynamic requirement based on the hourly forecast.

Wind Integration Study Summaries California ISO 2007 (20% capacity): Detailed observation of CAISO scheduling time lines including ED initiation, completion, and basepoint interval. Used “swinging door” algorithm to calculate regulating reserves and load following reserves which quantifies needs of capacity, ramp rate, and ramp duration. Study showed that persistence forecast errors can impact regulating reserves. All Island Grid Study 2008 (multiple scenarios): Spinning Reserve based on largest contingency and additional contribution from wind. Replacement reserve (can be provided by offline units with startup times less than 60 minutes) was calculated by tool that looked at probabilistic distributions of wind and load forecasts. This was based on how the thousands of scenarios for wind and load were reduced to the 5 or 6 used in the simulation that the 90th percentile should be met.

EWITS Methods Reserve demand as a function of Predicted operating levels (wind, load)

Questions? Next Steps… Questions? Erik.Ela@nrel.gov Michael.Milligan@nrel.gov

European comparison N America (NERC) Europe (ENTSOE) Regulating Reserve NERC does not provide for explicit quantitative requirements. Reserve is only used for normal conditions. NERC enforces compliance with Control Performance Standards CPS1 and CPS2. It. The CPS drive the requirements for each BA which are mostly based on time of day and season. Secondary reserve requirement is explicitly based on statistical equation and mostly comes from load variability. However, secondary reserve is used for both contingencies and normal variations. There are no compliance measures. Following Reserve No requirements Contingency Reserve (Primary) No requirement. In discussions. Only a frequency bias requirement as part of ACE equation of 1% peak load. Primary Control (3000 MW) split between TSOs based on load share. Full Response at 200 mHz. 20 mHz maximum insensitivity. Contingency Reserve (Secondary) Disturbance Control Standard DCS must recover from contingency in 15 minutes. Enough to recover largest contingency. Many regions require at least 50% to be online/spinning. Similar requirement to DCS. Return ACE to zero within 15 minutes. Split between primary secondary and tertiary. Sum of secondary and tertiary should be at least as large as largest contingency Contingency Reserve (Tertiary) No quantifiable requirement but contingency reserve must be replaced within 105 minutes following contingency. No requirement Ramping Reserve