Study Results PC8-PC16 System Stress Tests This slide deck contains results from the 2012 TEPPC Study Program related to the various stress tests performed.

Slides:



Advertisements
Similar presentations
Lessons from the 2015 SSG-Wi Reference Case Mary Johannis, SSG-WI Generation Subgroup Lead Tom Carr, WIEB Seams Steering Group of the Western Interconnection.
Advertisements

Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Strategic Planning Update For Board Meeting December 5, 2007.
Energy Policy Act of 2005 Section 1221 & 368 Update Board Meeting – Los Cabos, Mexico December 7 & 8, 2006.
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
1 Electricity Markets and Policy Group Energy Analysis Department Exploration of Resource and Transmission Expansion Decisions in the Western Renewable.
Heidi Pacini Staff Engineer Developing a Draft 2011 Study Program March 10, 2010 SWG Conference Call.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
Study Results High Hydro Study Low Hydro Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impacts of low.
Study Results Common Case Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of the 2022 Common Case.
SWG Resource Team Call May 21, Convert BA load assumptions to applicable states/provinces 2.Derive the RPS renewable energy requirements for.
Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
10-Year Study Results Colorado Resource Options and Transmission Expansion This slide deck contains results from the 2012 TEPPC Study Program related to.
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource.
Study Results Wyoming Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Wyoming Firmed Resource.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
ROLE OF RPS CALCULATOR IN >33% RPS STATEWIDE TRANSMISSION PLANNING? 1.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Update on the 2015 Special Study June 29, 2015 Arne Olson, Partner Nick Schlag, Managing Consultant Gabe Kwok, Senior Consultant.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
WGG Coal Retirement Case Transmission Repurposed for Renewables.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Rocky Mountain Area Transmission Study Connecting the Region Today for the Energy Needs of the Future Rocky Mountain Area Transmission Study Recommendations.
RPS Model Methodology Arne Olson, Partner Doug Allen, Consultant.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
Thoughts on Order 1000 and Western Clean Energy Needs Doug Larson September 10, 2015.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Use of EDWG Data by the LTPT WECC Staff October 9, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
November 12, 2010 Regional Planning Group Long-Term System Assessment Project Update Warren Lasher Manager, Long-Term Planning and Policy Jonathan Rose.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
2010 Long-Term Procurement Plan 33% RPS Calculator Training California Public Utilities Commission January 7, 2011.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
Sixth Power Plan A Public Utility Point of View Bill Gaines, Director, Tacoma Public Utilities Craig Smith, Assistant General Manager, Snohomish PUD Northwest.
PacifiCorp & CAISO Regional Transmission Organization Presented by Scott Gutting President, Energy Strategies, LLC Independent Energy Producers Annual.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Greg Brinkman Debbie Lew National Renewable Energy Laboratory Golden, Colorado USA Western Wind and Solar Integration Study: February TRC meeting – Transmission.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
11 Regional Renewable Energy Study Review of Findings and Forecasts Presented to: Climate, Energy and Environment and Policy Committee Metropolitan Washington.
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
1 RETI 2.0 Plenary Group Meeting 3/18/2016 DRAFT 2016 RPS Portfolios.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Study Results Common Case Study
Keegan Moyer Interim Manager, Transmission Expansion Planning
Western Electricity Coordinating Council
Study Results Common Case Study
Study Results PC8-PC16 System Stress Tests
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Study Results Drought Scenario Study
Presentation transcript:

Study Results PC8-PC16 System Stress Tests This slide deck contains results from the 2012 TEPPC Study Program related to the various stress tests performed on the 2022 Common Case. The results of the studies are shown along with an indicator to show the robustness of transmission in that area.

2 Description and goal Assumptions Results 10-Year Stress Test Results

Study Description and Goal

4 PC8-PC15 – Add 6,000 GWh Renewables PC16 – RPS Off-Ramp Stress Test Cases – two concepts…

5 Evaluate system’s ability to integrate and deliver added resources to load, subject to transmission constraints “Stress” the system Proxy for o High gas (makes RE more competitive) o High load (requires higher RPS and more RE) o CO 2 Policy (less thermal, more RE) o Increase in RPS (more RE) Studies are designed as indicators Summary “ Examine the Robustness of the Power Grid” Help us to understand how the system may behave under a variety of future conditions. This is robust planning.

6 No additional transmission added Small addition of RE will not solely justify addition of large interregional project Capital cost analysis will not be performed as it is outside the intent of the study Caveats

Study Assumptions

Stress Test: PC8-PC15 Resource Selection Process Calculate ratios of renewables in TEPPC 2022 Common Case Do not include existing resources Do not include DG IRP and LRS data Apply ratio to future build-out of 6,000 GWh Concept: past trends are best the representation of what could be added to each state More recourses available than what is identified in WREZ More granular information from CPUC/CAISO Locate resources using WREZ Extrapolation Method

Resources from CPUC scenario that were originally decremented for Common Case net-short are added Solar GWh Geothermal GWh Evaluated as one 6,000 GWh study. Resource split 50/50 in each Basin state. Per CPUC

10 Stress Test: PC16 Resource Removal Process WECC Class Explanation Class 0Existing Class 1Under active construction. Projected to be in-service within five years. Class 2Additions that were reported to have: 1)Regulatory approval (or in review) 2)Signed Interconnection agreement 3)Expected on-line date within seven years Class 3Meet NERC criteria for Future Planned or Future Other Resources but that do not meet Class 1 or 2 Class 4Meet NERC criteria for Conceptual Resources WECC LRS Data Collection Manual Remove

Common Case Results Refresher

Selection based on → Regional Significance Construction Status Financial Indicators Implementation Indicators

Potential “area of concern” High utilization can be explained or is expected

Flow: BC to NW Flow: NW to BC

IPP generation

Common Trends System seems to be fairly robust given the CCTA and Common Case starting point of system utilization. 1 When more renewable energy is added to the system, gas appears to be the marginal resource in all studies (except Montana), given our current price assumptions. CA gas units are “most marginal.” 2 Heavier utilization, not much congestion (i.e., the transmission system still permits economic transfer). 3

California Stress Test AssumptionsTransmission Results Generation ImpactsKey Finding Robustness Indicator Stress test had only minor impact on transmission utilization. Including additional generation in CA reduces requirement for imports.

Arizona Stress Test AssumptionsTransmission Results Generation ImpactsKey Finding Robustness Indicator Increase in AZ to CA imports. Congestion on P29. More detailed analysis required.

New Mexico Stress Test AssumptionsTransmission Results Generation ImpactsKey Finding Robustness Indicator Increase in P22 (SW of 4- Corners) utilization, but not congested. Other paths are not heavily impacted.

Wyoming Stress Test AssumptionsTransmission Results Generation ImpactsKey Finding Robustness Indicator Some sensitivity observed – P29 and P36. Large change in RMPA to Basin flow.

Montana Stress Test AssumptionsTransmission Results Generation ImpactsKey Finding Robustness Indicator P8 congested as a result. MT system is relatively isolated and is easily stressed.

Washington Stress Test AssumptionsTransmission Results Generation ImpactsKey Finding Robustness Indicator Small impact.

Oregon Stress Test AssumptionsTransmission Results Generation ImpactsKey Finding Robustness Indicator Very little congestion observed.

Basin Stress Test AssumptionsTransmission Results Generation ImpactsKey Finding Robustness Indicator Increased utilization, but not much congestion.

RPS Off-Ramp Stress Test AssumptionsTransmission Results Generation ImpactsKey Finding Robustness Indicator Decrease in congestion outweighs increase. Side bar: Is it apparent that our system designed for “RPS compliance” is highly versatile and can accommodate more “local” generation?

Quick Summary Robustness Indicator NA

Questions or thoughts on this study?