Transmission Planning in the West pocket guide This reference guide is intended to assist individuals new to transmission planning in the Western Interconnection.

Slides:



Advertisements
Similar presentations
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Advertisements

WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Operating Reserves --- Again A Discussion Primer
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Study Results Common Case Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of the 2022 Common Case.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan Plan Summary Comment Q&A June 17, 2011.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Allan Wick, CFE, CPP, PSP, PCI, CBCP Chief Security Officer WECC Joint Meeting October 8, 2014.
Public Service Company of New Mexico
Montana Energy Summit Transmission Planning Process April 22, 2008.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
NTTG 0rder 1000 Stakeholder Meeting March 28, 2012 Radisson Hotel Portland, Oregon 1.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Draft SAWG/RAWG Agenda Survey A Presentation to the MISO Supply Adequacy Working Group by the OMS Resource Adequacy Working Group August 16, 2004.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
2013 Calendar Year Customer Survey Results
1 Bradley Nickell Director of Transmission Planning Incorporation of Water in Transmission Planning April 2, 2013.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
2014 Calendar Year Customer Survey Results. Background Open for comment February 12, 2015 through March 31, 2015 for evaluation of prior year – 21 close.
COMMON USE SYSTEM March 5, 2008 Black Hills Power Service Center Rapid City, SD TRANSMISSION COORDINATION AND PLANNING COMMITTEE.
Overview of WECC and Regulatory Structure
WECC Response to DOE Funding Opportunity on Regional Planning Northwest Wind Integration Forum Steering Committee January 6, 2010 Tom Schneider Managing.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Large Generator Interconnection Procedures Reform 2 nd Stakeholder Meeting May 5, 2009.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Congestion Management in a Market Environment David Nevius Senior Vice President North American Electric Reliability Council.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
1 Entergy Transmission Planning Summit Transmission Planning & Budget Process Doug Powell New Orleans, LA July 10, 2003.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Clean Power Plan & Reliability – An Update TEPPC Winter 2016 Meeting February 3 rd – 4 th 2016 Vijay Satyal PhD, Sr. Policy Analyst W ESTERN E LECTRICITY.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Dan Beckstead Associate Staff Engineer TEPPC 2026 Common Case Load.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
RAC Implementation Status
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Nick Hatton Associate Engineer March 9, 2017
SEARUC Conference Little Rock, AR June 4, 2007
MAC Board Effectiveness Survey
PCC Meeting March 26, 2014.
Study Results Common Case Study
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Planning Tools Overview
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
ADS and WPR Seed Case Background
RAC Implementation Status
Study Results Common Case Study
Study Results PC8-PC16 System Stress Tests
Planning Tools Overview
Maggie Peacock, PAS Vice Chair
Donald Davies Chief Senior Engineer
MAC Board Effectiveness Survey
ADS and WPR Seed Case Background
Excelsior Energy’s Mesaba Energy Project
Presentation transcript:

Transmission Planning in the West pocket guide This reference guide is intended to assist individuals new to transmission planning in the Western Interconnection in understanding: 1) how transmission plans are inter-related, 2)who are the groups forming the plans, and 3) where stakeholders might want to participate in the Regional Transmission Expansion Plan. The intent is to provide information graphically and at a introductory level, and, therefore, is not intended to be a complete guide. For more detailed information, please refer to the TEPPC Protocol. TEPPC Protocol Link Place holder for a really cool graphic or picture to capture the message DRAFT Ver 3a May 12,2011

WECCPCC TSSLRSRSJSIS TEPPC TASSPSGSCG The transmission planning entities work together to develop a robust transmission system. Each group is responsible for informing the other process. The flow of information is both a bottoms-up process and a top- down process. The results of each transmission plan is incorporated as an input into another transmission plan. The transmission providers inform the SPG transmission plan which in turns informs the WECC process. The WECC process and reports should inform the SPG and the transmission providers where further detailed analysis is required. Transmission Planning Process Who’s Who in Transmission Planning DRAFT Ver 3a May 12,2011

Scale Matters Transmission plans are produced at a variety of different scales (level of detail) depending on the scope and region being studied. Local studies, typically prepared by transmission owners and operators, are highly detailed reports that evaluate the system with respect to their local load serving area. The analysis will include detailed reliability studies to validate compliance with National (NERC) and Regional (WECC) reliability standards and criteria. The subregional analysis compiles the local entities information into one plan. These studies may evaluate transfer capabilities between parties and assess the reliability with respect to the larger interconnect networks. The basis of the study is to gain enough granularities to validate the local system improvements do not negatively impact the larger subregional boundary. The local or subregional studies may also review any requests for facilities required by the FERC 890 standards. The regional processes study both reliability and economic transmission models. These are to identify areas of interest and perform system assessments for project feasibility and identify fatal flaws. The studies at the regional area do not produce detailed enough analysis to build transmission. Regional studies may identify areas that should be analyzed in more detail at the subregional or local area. DRAFT Ver 3a May12,2011

All stakeholder input is important to add credibility and validity to the transmission planning models. The input assumptions are based on specific workgroups. Find what your specialty is and get involved in that group. Where can I participate? DRAFT Ver 3a May 12,2011