CAISO-PacifiCorp EIM Update WECC Scheduler’s Meeting

Slides:



Advertisements
Similar presentations
Enabling Customer Demand Management Kevin Evans President & CEO June 24, 2010.
Advertisements

NERC Policies Introduction
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
NAESB Coordinate Interchange
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Development of CAISO / PacifiCorp Energy Imbalance Market Briefing on CAISO Straw Proposal & Benefit Study Presentation to WECC Market Interface Committee,
Development of CAISO / PacifiCorp Energy Imbalance Market Briefing on Design Straw Proposal and Issue Paper Presentation to WECC Seams Issues & Market.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
Update on CAISO / PacifiCorp Energy Imbalance Market
FERC Order minute Scheduling.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.
Update on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Market Interface Committee March 25, 2014 Jim Price, Senior Advisor, Market Development.
The Northwest Power Pool Members’ Market Assessment and Coordination Committee (MC) Initiative Dan Williams Portland General Electric NWPP MC Phase 2 Policy.
PacifiCorp-CAISO EIM Initiative Overview
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.
Presentation to WECC Market Interface Committee March 24, 2015
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
NV Energy Energy Imbalance Market (EIM) Presentation to ISAS
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
OSC Meeting April 27, Transmission Cost Allocation Overview.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Energy Imbalance Market Presented at: The Governor’s Utah Energy Development Summit 2015 Caitlin Liotiris Energy Strategies Power Through Ideas.
Managing Reliability and the Markets with PI
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Update on Energy Imbalance Market Presentation to WECC Market Interface Committee October 15, 2015 Jim Price, Senior Advisor, Market Development & Analysis,
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Regional System Operator Issues Analysis Ron Lehr Western Clean Energy Advocates January 7, 2016.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
IPC’s Energy Imbalance Market OATT Stakeholder Meeting
Transmission-Distribution Interface Working Group Meeting
Wind Management at MISO
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Asia-Pacific Energy Regulatory Forum
Briefing on 2017 CAISO Policy Initiatives Roadmap
On the Horizon: Energy Imbalance Market
Pseudo-tie business procedure
Solar Eclipse Overview August 2017
MIT tour of the California ISO Control Center March 31, 2015
PacifiCorp-CAISO-NVE EIM Initiative Overview
California ISO’s CIM Based Model Management
Forecasting and Operations CAISO Case
Update on Energy Imbalance Market
Jim Mcintosh Director, Executive Operations Advisor California ISO
Pseudo-tie business procedure
The Future Grid and Energy Storage
Presentation transcript:

CAISO-PacifiCorp EIM Update WECC Scheduler’s Meeting May 2014

Agenda Why EIM and Why CAISO Project implementation status Benefits Project implementation status How the EIM works CAISO Advanced Real-Time Market

EIM benefits for PacifiCorp Regulatory encouragement Improved network modeling ISO, PAC, BPA, and others Upgrading system reliability Replacing and enhancing outdated metering Improved generation dispatch Improved scheduling accuracy and accountability Generation, interchange, and load Economics

EIM Benefits Leveraging the ISO’s existing systems increases system redundancy and back-up capabilities CAISO’s 764 compliance beyond FERC requirements Modest start-up cost (capital and O&M) Manageable ongoing cost Incentive for constraint relief Diverse imbalance management

PacifiCorp Implementation Network model expansion 17,000 points via ICCP Eight systems and 40 interfaces modified Over 250 revenue meters upgraded Replaced, reprogrammed, or installed Over 30 plants upgraded (all scheduled) EMS, RTUs, DCSs, AGC

Network Model efforts 2013 (November 22) 2014 ICCP link established and tested CIM DE toolkit to convert from CIM 3 to CIM 10 Exported PACE network model, then PACW Tuning of network model (continuous) 2014 Tuning/improving model (Market Simulation July 8) Changing network model update cycle Actual data available for after the fact assessments Coordination with Peak RC

Operational Training Operational training and change management Four intro EIM training modules (Jan-Mar) Online Instructor-led Hands-on Operator UI screens/tools training (July) Operator scenario training (Aug)

Stakeholder Process and Key Milestones

Operational Concept Overview Expansion of CAISO’s advanced real-time market Security Constrained Economic Dispatch Congestion management Network model visibility and accuracy Market Operator, EIM Entity, Participating Resources, Manual Dispatch, Instructed/Uninstructed Imbalance charges, ….. Detailed outage reporting and situational awareness

Variable Generation Integration Solar/Wind

Redispatch

Base Schedules Entity must come to the market balanced Base Schedule (G + I = L) (feasibility check) Forecast of load Forecast of generation Forecast of interchange Submitted by all customers to EIM Entity Data aggregated and validated by PacifiCorp Grid Entity retains all BAA responsibilities

Base Schedule data flow

Dispatch Automated Dispatch System to PacifiCorp’s EMS, to RTU, and to DCS at the plant

PAC and CAISO responsibilities PAC retains all reliability function responsibility PAC will balance their ACE, manage reserves (no impact to NWPP RSG) and manage their voltage Under EIM, CAISO operates the market and publishes market results for both PAC and CAISO (the EIM footprint) Under EIM, PAC will operate transmission, monitor generation, process outages, and balance PACW and PACE

Responsibilities within PAC PAC Tx retains all reliability function responsibility PAC Tx retains all reserve sharing responsibility PAC Merchant continues as “balancing agent” for the BAAs PAC Merchant continues to utilize its transmission rights to balance load and resources, and instructs CAISO to dispatch resources within specified transmission capacities PAC Merchant bids dispatchable resources to CAISO

Unscheduled Flow Mitigation Procedures EIM enhances load/resource forecasts and state estimator modeling integration EIM improves transmission/generation outage management EIM is forward-looking, proactive generation dispatching to forecasted load within remaining transmission capacity and system operating limits EIM can dispatch multiple generators simultaneously to have a positive impact on transmission constraints

Unscheduled Flow Mitigation Procedures EIM provides reduced area control error deviations (ACE) EIM broadens generation ramping and regulating capacity in conjunction with smaller ramps WebSAS curtails e-Tags for next hour based on current hour actual flows EIM real-time & forward-looking Energy profile on dynamic e-tags for USF mitigation In hour dispatches will honor USF curtailments

EIM Design (CAISO) Allows voluntary participation Increased reliability: Provides information that improves operational awareness and responsiveness to grid conditions across its large footprint Improved renewable integration: Helps integrate renewable resources by capturing the benefits of geographic diversity Cost savings: Benefits all by serving energy imbalance needs from the most economic resources in a larger pool

EIM Annual Benefits Transfer capability Low (100 MW) Medium High Low $14.1 $2.3 $4.0 $1.1 $21.4 High $11.0 $23.0 $20.8 $10.8 $65.6 Low $22.3 $2.3 $11.0 $1.1 $36.7 High $17.7 $23.0 $51.3 $10.8 $102.8 Low $22.4 $2.3 $13.4 $1.1 $39.2 High $17.8 $23.0 $77.1 $10.8 $128.7 Interregional dispatch Intraregional dispatch Flexibility reserves Renewable curtailment Total benefits $10.5 million to PacifiCorp customers $10.9 million to ISO customers

Scale of EIM in the West PacifiCorp 1.7 million customers 9,500 MW peak demand 10,600 MW generating capacity NV Energy 1.2 million customers 8,148 MW peak demand 5,815 MW generating capacity CAISO 11.4 million customers 50,280 MW peak demand 58,246 MW generating capacity CAISO is working with other interested parties

EIM Leverages CAISO’s Advanced Real-Time Market Day Ahead Schedule Hourly Base Schedule (basis of financial settlement) 15-Minute Unit Commitment & Energy Schedule, and Incremental AS Awards 15-Minute Unit Commitment & Energy Schedule Real-Time Dispatch Real-Time Dispatch

Resource Sufficiency Test Addresses real-time leaning prior to each hour Under-scheduling incentivizes balanced base schedules and compensates other LAPs for leaning BAA real-time congestion balancing account isolates the cost of infeasible base schedules to the BAA Ensures EIM Entity can meet their requirements, based on diversity benefit, independently before start of market optimization across EIM footprint Benefits of reduced flexibility requirements realized Information provided to facilitate opportunity for EIM entity to resolve infeasible base schedules

California Greenhouse Gas Regulations Optimization process efficiently schedules resources at least cost, recognizing Calif. Air Resources Board obligations for energy transferred to California. Market dispatch enables compliance, compensates resources, and does not assign costs to non-CA load. EIM Participating Resources may submit a separate bid for the GHG compliance obligation costs. Energy generated outside California that is not imported is not subject to GHG obligation. GHG costs for transfers into California incorporated into price paid by CA demand.

Energy Imbalance Market Summary EIM provides reliability and financial benefits to California, EIM participants, and the West CAISO implementation is based on its existing platform to provide a flexible and scalable approach, at low cost, to other balancing authorities EIM implementation helps facilitate renewable integration across the West

EIM Market Simulation Open to all interested parties Structured scenarios (7/25-8/22) List of structured scenarios on ISO website Results will be on ISO website Unstructured scenarios (8/25-9/12) All market participants run own scenarios Results provided to scheduling coordinator of the scenario Addition implementation information is available at: http://www.caiso.com/informed/Pages/StakeholderProcesses/EnergyImbalanceMarket.aspx

Market Performance and Planning Forum Every six weeks Review of market results and metrics Provides updates on implementation activities Identifies upcoming market design enhancement stakeholder initiatives Additional information is available: http://www.caiso.com/Pages/documentsbygroup.aspx?GroupID=587B83F7-5396-404E-AB51-D8B469BF1390

Flexible Ramping Product Initiative Recommence on June 2 (updated straw proposal) Design modifications to reflect FERC Order No. 764 design changes Compensates resources for both upward and downward ramping product in all markets Enhanced cost allocation to resources/loads than drive increased flexibility requirements Enhances EIM by including downward ramping test to resource sufficiency evaluation

Questions