SIS Update on Eastern Seams Issues WECC SIS Meeting 2/1/12 Salt Lake City, UT.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Business Practices Subcommittee Update April 30, 2013.
Business Practices Subcommittee Update August 20, 2013.
©2005 PJM 1 Development of Wholesale Electricity Scheduling and OASIS Determining the Future Needs of the Open Access Same-time Information System Andy.
1 R12010 Default Scheduling Intervals. 2 Submitted by Southern Company In response to Order 764s 15 minute scheduling intervals Establish default scheduling.
Parallel Flow Visualization/Mitigation Proposal
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
California Independent System Operator 1 tmw/ California ISO Update on RTO Request for Designation as Regional Transmission Organization (RTO) WECC.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Primary Objectives of WIT
Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Western Electricity Coordinating Council Market Interface Committee Report to the WECC Board of Directors December 6-7, 2007 Robert D. Schwermann MIC Chair.
WECC-0074 Power Flow Base Case and Dynamic Stability Data Prep Procedure W. Shannon Black Manager, Business Practices and Standards Processes November.
MISO Southern Region Integration – ARR/FTR Timeline FTR WG February 6,
Regional Transmission Organizations: A Primer
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
WECC Interchange Authority Michelle Mizumori Joint Guidance Committee May 5-6, 2009.
1 What is the Internet Archive We are a Digital Library Mission Statement: Universal access to human knowledge Founded in 1996 by Brewster Kahle in San.
FEBRUARY 27, 2013 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS Parallel Flow Visualization Overview 1.
1 MISO Business Plan: Enhanced Reliability, Customer Service & Market Implementation James P. Torgerson, President & CEO Midwest ISO December 17, 2003.
1 Dale Osborn Midwest ISO March 17, 2008 Detroit, Michigan Great Lake Regional Wind Institute Introduction to the Midwest ISO.
Midwest ISO Market Readiness Update October 27, 2004.
2015 WECC Spring Scheduler’s Meeting
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, May 13th, :00 to 3:00 p.m. EDT.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
Jim Price Chair, Market & Seams Issues Subcommittee MSIS Update to Market Interface Committee March 24, 2015 Salt Lake City, UT.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Andy Meyers Bonneville Power Administration Market Interface Committee Update ISAS April 2015 Salt Lake City, UT.
Andy Meyers Bonneville Power Administration Operating Committee Update ISAS April 2015 Salt Lake City, UT.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
1 Restructuring of the Midwest Wholesale Electricity Markets Michael D. Smith Constellation Power Source December 10, 2003.
2005 WRAP Work Plan WRAP Board Meeting Salt Lake City, UT November 10, 2004.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
ESI/SPP Seams Agreement Implementation Update Transmission Planning Summit August 11, 2010.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
EIM/EDT Update ColumbiaGrid Planning Meeting June 2, 2011.
NAESB BPS UPDATE TO EXECUTIVE COMMITTEE AUGUST 21, 2012 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS PARALLEL FLOW VISUALIZATION PROJECT 1.
1 Parallel Flow Visualization Goals NAESB BPS Meeting September 15-16, 2010.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Bert Peters Chair, Path Operator Task Force
ISO-NE Synchrophasor Related Projects
Joel Bladow – Tri-State G & T
Defining an IT Workflow, from Request to Support
Pseudo-tie business procedure
MIC Committee Discussion
Duke Energy Carolinas Quarterly Stakeholder Meeting
WECC Annual Meeting 9/11/2018 Cameron Warren
MISO-SPP Whitepaper Discussion
WECC Annual Meeting 9/11/2018 Cameron Warren
GENERATOR OPERATOR WORK GROUP
MIC Committee Discussion
NERC Congestion Management
Bert Peters Chair, Path Operator Task Force
WIAB WECC Interchange Authority Backup
Pseudo-tie business procedure
Presentation transcript:

SIS Update on Eastern Seams Issues WECC SIS Meeting 2/1/12 Salt Lake City, UT

Eastern-side Seams Topics MISO-PJM JOA Update – y/Tariff/Rate%20Schedules/Rate%20Schedul e%2005%20-%20Midwest%20ISO- PJM%20JOA%20and%20CMP.pdfhttps:// y/Tariff/Rate%20Schedules/Rate%20Schedul e%2005%20-%20Midwest%20ISO- PJM%20JOA%20and%20CMP.pdf –Also Utilicast recently completed a baseline evaluation of the MISO-PJM agreement, available as a stand-alone document.

Eastern-side Seams Topics Broader Regional Markets Initiative –Also known as the “Lake Erie Loop Flow” issue

Eastern-side Seams Topics Market to Non-Market Issues –PFVT: a NAESB effort to address untagged non-firm flows within a BA boundary and improve market coordination –NDEX: MISO is deploying a new real-time stability assessment tool and associated transmission limit calculator

Eastern-side Seams Topics MISO-SPP SOA Renegotiations (Entergy) Tariff/Rate%20Schedules/Rate%20Schedule %2006%20-%20Midwest%20ISO- SPP%20JOA%20and%20CMP.pdf

Reference Site Many areas to gather information MISO reference: cInitiatives/Pages/Seams.aspx Seams management workshop/recording link: G aspx