NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

Enabling Customer Demand Management Kevin Evans President & CEO June 24, 2010.
PG&Es 2009 Participating Load Pilot. 2 Overview Regulatory Context Pilot Characteristics Lessons Next Steps.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Operating Reserves and Variable Generation
WECC BAL-STD-002 Workshop February 6, 2008
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
TIM MASON RENEWABLE RESOURCE INTEGRATION IEP ASSOCIATION ANNUAL MEETING FALLEN LEAF LAKE 5 October 2011.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Transparent, Repeatable, Defendable, and Published Generation, Transmission & Nat Gas Network Co-Optimizations
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Operating Reserves Task Force
Electrical and Computer Engineering Mississippi State University
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
05/14/2014 Flexibility Methods Workgroup. 2 © 2014 Electric Power Research Institute, Inc. All rights reserved. Overview/Agenda Discussion of Literature.
Multi-Area Stochastic Unit Commitment for High Wind Penetration in a Transmission Constrained Network Shmuel Oren University of California, Berkeley Joint.
©2012 | Commercial in Confidence | Proprietary to Ventyx, An ABB Company NYISO Real-time Market Presentation to ERCOT METF – April 26, 2012 Confidential.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
August Intelligently Connecting Plug-In Vehicles & the Grid.
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
1 Demand Response: A Reliability Tool Today; A Renewable Integration Tool Tomorrow Dave Waller, VP Customer Service Hawaiian Electric Company.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
Hawaii Energy Storage Seminar: Utility Regulation Service
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
Wind Production intermittency Cross border compensation: what to expect in Western Europe? Analysis of Winter 2010/2011 Hubert Flocard and Jean-Pierre.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Minnesota Renewable Energy Integration and Transmission
Erik Ela, Eamonn Lannoye, Bob Entriken, Aidan Tuohy
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
GENESYS Redevelopment Strawman Proposal
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Overview of New Control Room Desk
Grid Integration of Intermittent Resources
Automatic Generation Control (AGC)
MIT tour of the California ISO Control Center March 31, 2015
Opportunities for Hydrogen-Based Energy Storage for Electric Utilities
Sandip Sharma ERCOT Manager, Operations Planning
Solar Energy Commercialization
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable Energy, LLC Michael Milligan WECC VGS Operating Workgroup Meeting Dec 2, 2010 Operating Reserves and Variable Generation: Research at NREL

Purpose of presentation Describe NREL’s work on reserves Discussion of applicability to OWG –NREL is completing a methods review report; may be a springboard to WECC work and all/parts of the report can be incorporated into OWG report as appropriate –Initial paper presented at IEEE General Meeting: “Evolution of Operating Reserve Determination in Wind Power Integration Studies,” Ela, Kirby, Lannoye, Flynn, Milligan, O’Malley, Zavadil –Final lab report expected Feb 2011 –Other?? National Renewable Energy Laboratory Innovation for Our Energy Future

Overview of NREL’s work on reserves Lead International Energy Agency Reserves Working Group, Task 25 and recent conference paper Collaboration with MISO and University College Dublin on reserves project; recent IEEE paper Large-scale wind integration studies (EWITS, WWSIS) Ongoing work evaluating alternative BA cooperation approaches and reserve implication in the Western Interconnection Wind-provided regulation R&D&D project National Renewable Energy Laboratory Innovation for Our Energy Future

Does VG require a new kind of reserve? National Renewable Energy Laboratory Innovation for Our Energy Future

Wind drop-off looks different than a contingency event National Renewable Energy Laboratory Innovation for Our Energy Future

VG influence “operating reserve” With load alone we know when to expect changes With VG there is a need for more potential movement from conventional units over many time scales Fundamentals: –All variability within next 10 minutes covered by spin –Beyond 10 minutes can be covered by spin (more expensive) or non-spin (if available) –Maintaining balance at lowest cost National Renewable Energy Laboratory Innovation for Our Energy Future

Institutional/Scheduling rules matter: Inter- BA Wind Deliveries No Additional Capacity Required If The External BA Responds When Wind Drops Rather Than Waiting Until The Start of The Next Scheduling Interval Kirby, B.; Milligan, M. (2009). Capacity Requirements to Support Inter-Balancing Area Wind Delivery. 29 pp.; NREL Report No. TP (2009). Capacity Requirements to Support Inter-Balancing Area Wind Delivery.

Reserve approaches and impacts are based on operating practice and institutional constraints National Renewable Energy Laboratory Innovation for Our Energy Future Milligan and Kirby (2009). Capacity Requirements to Support Inter-Balancing Area Wind Delivery. 29 pp.; NREL Report No. TP , and An Examination of Capacity and Ramping Impacts of Wind Energy on Power Systems, Kirby & Milligan, ElecJ Aug./Sept. 2008, Vol. 21, Issue 7, pp 30-42

Fast economic dispatch changes things… Hourly scheduling/dispatch constrains units that may be capable of moving Economic signals at short time frames incent units that can physically and economically respond Variability is thus spread to more units Reserve profile changes National Renewable Energy Laboratory Innovation for Our Energy Future Milligan, M.; Kirby, B. (2010). Market Characteristics for Efficient Integration of Variable Generation in the Western Interconnection. 51 pp.; NREL Report No. TP (2010). Market Characteristics for Efficient Integration of Variable Generation in the Western Interconnection.

Example from NREL EDT Analysis

Reserves issues Fast energy markets can often “automatically” provide load following Holding constant spin for VG is possible, but costly Dynamic reserve is the standard: a static reserve for wind/solar is not rational or economic –How does one assess the level of reserve required if it is variable? –How much is spin? How much is non-spin? What is objective function and constraints of the reserve optimization problem? –Can “simple rules” be developed for operations? National Renewable Energy Laboratory Innovation for Our Energy Future

Questions How do you determine the correct percentage of spinning and non- spinning for each category. Do these percentages change based on system conditions? Might end up as more of an economic separation rather than reliability driven. Spinning: High standby cost, low utilization cost. Non-spinning: Low standby cost, high utilization cost What is the need for synchronization time for non-spinning reserve for each category? Can reserve requirements for a specific area and hour change as you get closer in real-time as things become more certain How to correctly quantify reserves with advanced stochastic unit commitment techniques? How can different reserve categories be shared? (e.g. if all ramping reserves are used up can we use contingency reserves for a non- contingency?) How soon should each reserve category be replaced? Is there a f(x) for each reserve category? If so, what are the x variables? How do we determine their coefficients? Is the function linear or something else?