Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource.

Slides:



Advertisements
Similar presentations
CPUC Vision for Transmission Planning in the West Dian M. Grueneich, Commissioner California Public Utilities Commission Western Electricity Coordinating.
Advertisements

1 Modeling Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting August 20, 2009 Tom Miller Pacific Gas & Electric Status and Outlook.
1 Data Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting San Francisco, CA November 28, 2007 Jamie Austin PacifiCorp Progress Report: 2007.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
WGA West-wide Renewable Energy Zone (WREZ) Project.
Heidi Pacini Staff Engineer Developing a Draft 2011 Study Program March 10, 2010 SWG Conference Call.
Database & Lessons Learned WECC - TEPPC Technical Advisory Subcommittee Meeting San Francisco, CA November 28, 2007 Jamie Austin PacifiCorp.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Study Results High Gas Sensitivity Low Gas Sensitivity High High Gas Sensitivity Low Low Gas Sensitivity This slide deck contains results from the 2011.
1 Review of AC Circuits Smith College, EGR 325 March 27, 2006.
Study Results PC8-PC16 System Stress Tests This slide deck contains results from the 2012 TEPPC Study Program related to the various stress tests performed.
Study Results High Hydro Study Low Hydro Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impacts of low.
Study Results Common Case Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of the 2022 Common Case.
Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
10-Year Study Results Colorado Resource Options and Transmission Expansion This slide deck contains results from the 2012 TEPPC Study Program related to.
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
10-Year Study Results California Resource Option.
Study Results NW Resource Option Selkirk-Bell-Ashe Nicola-Chief Joseph Selkirk-Ashe DC Selkirk-Buckley DC This slide deck contains results from the 2012.
BC SUPPLY GAP: A REDEFINITION OF SELF- SUFFICIENCY 32 nd USAEE/IAEE Conference, Anchorage AK July 29, 2013.
Study Results Wyoming Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Wyoming Firmed Resource.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
5/22/20151 Northwest Power & Conservation Council Power Committee Over-generation and Negative Energy Prices – a work in progress Jeff King September 21,
1 R : LTPP Track II Workshop – Operating Flexibility Modeling Results Patrick Young Analyst, Generation & Transmission Planning California Public.
California Energy Commission Workshop Nuclear Power Plant Issues
WGG Coal Retirement Case Transmission Repurposed for Renewables.
Incorporating Water into Electricity Planning Doug Larson Executive Director Western Interstate Energy Board WSWC-WGA Water/Energy Workshop April 2, 2013.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
Historical Year for 2026 Common Case Load/Hydro/Wind/Solar Shapes TAS November 2015 Meeting Tom Miller- TAS Vice Chair W ESTERN E LECTRICITY C OORDINATING.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
TAS – Review Load and Hydro Shapes for use in TEPPC 2026 Common Case Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Greg Brinkman Debbie Lew National Renewable Energy Laboratory Golden, Colorado USA Western Wind and Solar Integration Study: February TRC meeting – Transmission.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 R Workshop on 2016 RA proposals Energy Division Staff Procurement Oversight and Resource Adequacy California Public Utilities Commission Thursday,
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Economic Planning Study June 23, In this presentation  Major changes from last meeting  Results: 2010, 2014, 2019  Finish analyst  Next steps.
Dan Beckstead Associate Staff Engineer TEPPC 2026 Common Case Load.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair
Study Results Common Case Study
Keegan Moyer Interim Manager, Transmission Expansion Planning
Western Electricity Coordinating Council
Study Results Common Case Study
Study Results PC8-PC16 System Stress Tests
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Study Results Drought Scenario Study
Presentation transcript:

Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource Option Studies. The generation results for the associated transmission expansion projects follow immediately along with flow information for the added transmission.

Hydro Firming Modeling Goal Compare different hydro dispatches in different wind conditions given various modeling techniques Compare path flows and production costs Implementation Steps Start with 2022 PC23 NW Resource Option (+12,000 GWh) 1.Increase WECC annual energy demand 8% 2.Add 12,000 GWh of renewables to NW 3.Under the purview of high wind in a particular region, investigate how a nearby region’s hydro responds based on different types of modeling 4.Investigate how the changes listed above impact path flows

Add: 12,000 GWh to meet WECC RPS Add transmission Renewable Options Under High Load Firmed Cases Increase WECC-wide load 8% For these regions 3 Add: firming resource Gas Hydro Pumped storage

Increase WECC-wide load 8% 1 8% 8% increase to peak and energy 10% 10% decrease to energy Higher Load = Additional RPS Energy

Calculate ratios of planned renewables in TEPPC 2022 Common Case Do not include existing resources Do not include DG IRP and LRS data Apply ratio to study build-out of 12,000 GWh Concept: development trends are best representation of what could be added to each state More resources available than what is identified in WREZ More granular information from CPUC/CAISO Locate resources using WREZ peer-analysis tool Extrapolation Method Add 12,000 GWh to meet WECC RPS 2

10-Year Study Results EC27a – NW Firming Study A EC27b – NW Firming Study B Hydro

NW Firmed Resource Cases Comparing Four Cases Revelstoke Shrum Mica +12,000 GWh (mostly wind) +12,000 GWh (mostly wind) +12,000 GWh (mostly wind) Revelstoke Shrum Mica Revelstoke Shrum Mica Shrum PC1-5 High Load PC23 NW Resource Option PC27a NW Firmed Resource PC27b NW Firmed Resource No added resources Standard HTC modeling +12,000 GWh resources Fixed shape hydro from PC1-5 (no resources) +12,000 GWh resources Standard HTC modeling HTC modeling with price signals from a windy Northwest Revelstoke Mica Compare Results 1.Generation 2.Hydro impact 3.Path Flows

Production cost decreased $27 M (.15%) Dump energy increased 397 GWh (93%) Emergency Energy decreased 6% CO2 Emissions decreased 0% AZ, OR, CA, WA

Production cost decreased $6 M (.032%) Dump energy increased 80 GWh (19%) Emergency Energy decreased 0% CO2 Emissions decreased 0% AL, BC

PC23 vs. PC27b Normal hydro NW $ Hydro

Production cost decreased $22 M (.125%) Dump energy increased 478 GWh (1649%) Emergency Energy decreased 6% CO2 Emissions decreased 0%

PC27a vs. PC27b Fixed hydroNW $ hydro

Energy moved

Congestion Less S-N flow S-N

k k

k k

2-weeks in April 2-weeks in October

Questions or thoughts on this study?