1 FAB CE Feasibility Study Operations FAB CE Stakeholders Workshop March 5 th 2008, Prague.

Slides:



Advertisements
Similar presentations
National Seminar on Developing a Program for the Implementation of the 2008 SNA and Supporting Statistics in Turkey Arzu TOKDEMİR 10 September 2013 Ankara.
Advertisements

Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
SIP/2012/ASBU/Nairobi-WP/19
The Single European Sky ATM Research (SESAR) initiative
1 Item 2.7 ECIP developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008.
CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels,
CDM Collaborative ATFM Interface with Airlines (CAIA) Gerard Mavoian & Peter Eriksen.
Moving Towards an Integrated ASM/ATFCM/ATS Approach
1 Item 4.5 LSSIP Development and SES Reporting Reference: Action Paper SCG/10/AP06 Danny DEBALS LSSIP Manager SCG/10 – 25 February 2009.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
ACG Workshop, 17 Feb 2004 – OATA project Concept of Operations (ConOps) ACG Workshop, 17 February 2004 Jose Varela and Ian Ramsay, SD/ESC.
Traffic and Capacity Performance Summer 2008 Outlook PC/29 – 9 May 2008 Item 3.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
Civil-Military coordination in France
Nordic Council of Ministers Friday, May 30, The Nordic Council of Ministers and the EU Baltic Sea Strategy.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Network Management Operational Performance Enhancements Razvan BUCUROIU.
Episode 3 / CAATS II joint dissemination event Gaming Techniques Episode 3 - CAATS II Final Dissemination Event Patricia López Aena Episode 3 Brussels,
The European Organisation for the Safety of Air Navigation Network Management functions Evolutions in SESAR WP7 and WP13 Moving Towards an Integrated ASM/ATFCM/ATS.
Submission Writing Master Class Gerard Byrne B Comm FCPA FAIM Townsville, 17 April 2010 Thursday, June 12,
The European Organisation for the Safety of Air Navigation ASM Solutions at Network Level ASM / ATTFCM / ATS Workshop EUROCONTROL HQ September 2012.
Click to edit Master title style. Click to edit Master subtitle style.
Mission Trajectory Step 1 From planning to deployment.
Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop September 2012.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
Ensuring a 'Flexible Use of Airspace'….
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
The European Organisation for the Safety of Air Navigation MILO Military Liaison Officer in NMOC Civil-Military Cooperation 20 September 2012 Support function.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Harmonised Data Sharing Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO.
NM USER FORUM 2014 Etienne De Muelenaere Network Strategy & Development 30 January 2014 NM 2014/2015 functional improvements.
Free Route Airspace in DK/SE FAB
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
1 Ensuring a 'Flexible Use of Airspace'…. ICAO EANPG FUA Task Force Paris, May 2008 EUROCONTROL Airspace, Network Planning & Navigation Division.
Traffic Management and FUA integration
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Peter Matern Head of ADM Unit 30/01/2014
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
F. Schubert / page 1 Functional Airspace Blocks - Can they inspire the ANS World? Air Transport, Air & Space Law and Regulation International.
Volcanic Ash Crisis 2010 Seminar Belgrade, 7 th September 2010 INFORMATION SHARING IN VA CRISIS European Organisation for the Safety of Air Navigation.
Frank Brenner Director General, EUROCONTROL European ATM Israel Civil Aviation Conference, 18th November 2013.
Regional ATFM in Europe
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
Flexible Use of Airspace and Collaborative Decision Making The aim of this presentation is to provide the aviation industry with the understanding of the.
© EUROCONTROL European Air Traffic Management Programme The European ATM Master Plan ASAS TN Dave Young, Business Dev. Manager, EEC.
1 Human Resources (HR) Presentation by Andrej Grebensek HR WGL Stakeholders Workshop Prague 5 March 2008.
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
SIP/2012/ASBU/Nairobi-WP/19
Presented by United Arab Emirates
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Click to Add Title Click to Add Subtitle.
Ensuring a 'Flexible Use of Airspace'….
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
The Single European Sky Implementation Programme: SESAME
Click to edit Master text styles
Author names here Author association names here
Click to edit Master text styles
Click to edit Master text styles
Slide Title Edit Master text styles Second level Third level
ОПШТЕСТВО ТЕМА: МЕСТОТО ВО КОЕ ЖИВЕАМ Скопје
Author names here Author associations here
Author names here Author associations here
Click to edit Master text styles
Author names here Author associations here
M. Steinfurth, I. Kuren, R. Lacatus, A. Paulov, V. Somosi
Click to edit Master text styles
WHERE IS The added valuE?
Presentation transcript:

1 FAB CE Feasibility Study Operations FAB CE Stakeholders Workshop March 5 th 2008, Prague

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE  Introduction  Key results  Airspace  Concept  Civil/Military  Contingency Content  Conclusions

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE FAB Development Process Assumptions : 1. Airspace (7States) 2. Route Network (RNDSG 2010+) 3. Common understanding OPERATIONAL CONCEPT DOCUMENT Volume I Initial Airspace Design WG2 OPS WG AREA OF RESPONSIBILITY WG3 WG4 WG5 WG6 OPERATIONAL CONCEPT DOCUMENT Volume II Sector Families Sector Groups TIME FIN WG Master Plan TEC WG HR WG ILR WG SAF WG FAB Scenarios CBA SAF CASE constraints Master Plan OPS Scenarios

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE OPS Concept evolution CONCEPT ALIGNMENT Based on FAB Static and Dynamic Scenarios Main driver: Business and Technology Alignment with: SESAR LT Concept Expectations FABCE partners Industry standards Based on FAB Static and Dynamic Scenarios Main driver: Strategic ATM business objectives Operational performance included SAFETY Alignment with: ECIP/LCIP DMEAN SESAR MT Concept Expectations of the FAB partners Based on FAB scenario for initial operations Main driver: Satisfy SES Req. Alignment with: ECIP/LCIP DMEAN. Legal [e.gSES] Expectations of the FAB partners FAB CE 2015 Concept Concept for the future [2020+] Concept for 2009-> Evolution from current situation

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE Initial Operations Small scale cross border operations solving 25 critical areas in upper and lower airspace Joint Civil-Military Airspace Co-ordination Body [JCMACB] coordinating airspace use and route network and enabling functional integration of ASM & ATFCM Systematic Application of Direct Routes Contingency Plan for safety critical situations

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE Airspace SECTOR Configuration (SC) EST SECTOR GROUP (SG) FAB CE OPS Concept Elements 2015 Elementary SECTOR (ES) EST Traffic 2012 Optimized AAS 07 SECTOR FAMILY (SF) FAMILY GROUP (FG) Airspace design OPS Scenarios OPS Concept Sector Family (SF) - areas containing specific air traffic flows and conflict areas which will consist of strongly interdependent elementary sectors. Family Group (FG) - group of Sector Families made along the major traffic flows (minimum FAB) Sector Configuration (SC) – combination of elementary sectors to satisfy operational requirements Sector Group (SG) – includes one Sector Family or more Sector Families to satisfy single sector configuration management (minimum AoR)

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE Sector Groups (FL285 – FL660) and Family Groups Note: FGs borders simplified for purpose of presentations

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE Sector Groups (GND – FL285)

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE Concept Planning Cycle State/ANSP/ MIL FAB CE Other Network Stakeholders State/ANSP/ MIL NOP SGs/AoR sectors SCP STATIC AoR: 1 ATSU in 1 SG Dynamic AoR: 1+n ATSU in 1 SG Network FAB CE coordinated implementation, training, validation

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE Static AoR Operations Extensive cross border sectorisation with ATM provision for GAT (possibly OAT) Sector Configuration Plan (SCP) relating to Sectors Groups which are under the exclusive control of single ATSU SCP part of FAB/European NOP valid/updated minimum for a season ASM/ATFCM integrated processes involve the different actors (ANSPs, CFMU, Airlines, Authorised Agency and civil/military coordinating bodies) FAB AMC(s) (in each FG), ideally combined with FMPs, play a key role in collaborative decision making and in review of the NOP Collaborative decision making process from the strategic phase to the executing phase

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE Dynamic AoR Operations Sector Group involves several ATSUs Sector Configuration Plan for several ATSUs relating to Sectors Group as part of FAB/European NOP, valid/updated minimum for a season Sector Configuration Management done within a Sector Group

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE Dynamic Area of Responsibility Operations sector 2 ATSU A ATSU B ATSU B provides ATS in Sector 3 and 4 as part of SG B (sec 2 + sec 3 + sec 4) sector 3 ATSU A and ATSU B provide ATS in sector 2 in periods defined by Sector Configuration Plan ATSU B is responsible for Sector Configuration Management in whole SG B including the sec 2 sector 1 ATSU A provides ATS in sector 1 as part of the SG A (sec 1) sector 4

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE Civil/Military Strategic ASM/ATFCM Process FAB CE Airspace Plan EUROPEAN NATIONAL REGIONAL Military Airspace Requirements FAB CE Member States Civil Airspace Requirements FAB CE ANSPs EUROPEAN BODIES JCMACB NATIONAL BODIES Supporting Bureau

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE FAB AMC Traffic Demand TRAFFIC DATA Civil/Military Pre-tactical ASM/ATFCM Process AUP UUP ACCs Sectors capacities/conf. CFMU Coordination major traffic flows Establish pre-defined modus operandi Establish process and procedures to apply Establish defined priority criteria to use for decision Strategic level decisions Airspace allocation requests * On line definition of airspace requests based on: Fixed areas Predefined areas Requested shapes * National decision to identify the Approved Agencies CRAM UCRAM ADR CFMU IFPS AOs: Shortest routes Cheapest routes No-delay routes

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE Contingency Concept COST EFFECTIVENESS: Targeted in Dynamic AoR for the whole Contingency cycle SAFETY: FAB mutual assistance achieved in Initial Operations BUSINESS: FAB – ATS delegation achieved in Static AoR Operations

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE Conclusions Concept of FAB driven by OPS needs, using existing and planned ATS facilities Incremental, performance driven development and implementation Alignment with SES and European Network Adaptation responding to the evolution of traffic

Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 01/10/ FAB CE FAB CE Feasibility Study OPS WG THANK YOU !