North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.

Slides:



Advertisements
Similar presentations
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
Advertisements

Second Asia Gas Buyers’ Summit Mumbai, 2-3 February 2004
Safeguarding Investments In Gas Infrastructure Informal lecture Agency for the Cooperation of Energy Regulators, ACER - By Tim Boersma.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EURELECTRIC vision on market development – what can the industry provide to accelerate market development? Peter ŠTULC Chairman of EURELECTRIC TF flow-based.
Completing the EU internal energy market IFIEC, 22 November 2011
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
France-UK-Ireland Region 1 February 2007 Written Consultation – Overview of Responses Shaun Kent – Head of European Electricity Policy, Ofgem.
Gas Regional Initiative - Region South-South East 1st Implementation Group Meeting An Action Plan for the South-South East Europe Natural Gas Market Vienna,
Progress with coupling FUI and CWE region
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Gas Regional Initiative - Region North / North-West Stakeholders Group Meeting The Hague, October 9th, 2006.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
Completing the EU internal energy market
European Developments: Capacity Transmission Workgroup 6th October 2011.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
Energy Tom Howes DG Energy European Commission Europe's renewable energy strategy.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Market Integration Project. Background –Single Electricity Market Organisation –EU Internal Energy Market –Context for Market Design Market Integration.
22 February 2007 ERGEG approach to the internal energy market Nick Thompson – Ofgem IFIEC Europe Energy Forum, 22 February 2007.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
The New EU Directives Oftel Forum 25/04/02 Heather Clayton.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Energy Agency of the Republic of Serbia
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
13 February 2007, Brussels Electricity Infrastructure Workshop Shaun Kent, co-chair Electricity Regional Initiative TF.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
© ONTRAS Development and innovative strategies for transmission system operators Ralph Bahke Managing Director, ONTRAS.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
North West Region Gas Regional Initiatives Regulatory Co-ordination Workshop 23 rd April 2007.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
The 3rd package for the internal energy market
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
How will the 3rd Energy Package Impact GRI NW ?
ETSO Comments on the draft Congestion Management Guidelines
Gas Transmission Europe
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
ERGEG GRI South South East – , Maribor
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Update on European Network Codes
Gas balancing – where next
The Policy Framework For New Gas Infrastructure Brendan Devlin
XIIIth Madrid Forum (16th/17th October 2007)
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Presentation transcript:

North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007

Responses to Issues Paper Regulatory Co-ordination

Responses Received to Issues Paper Twelve Individual Responses –Six Shipper / Trader –Six Transporter Consolidated Response from European Transporters

General Observations Assume all regulators consult as much as possible Obligations under Art 25 Dir and Reg 1775 Extent limited by National Legislation Philosophical / Policy differences Extension of Duties under proposed 3 rd EU package Telecoms Framework Directive good model

How to Co-ordinate Co-operate in developing harmonised regulations Compulsory if not voluntary Common Criteria –Checklist of Issues One Regulatory Window

Legal Structures Institutionalised Co-operation EU regulatory body –Monitor regulatory actions / decisions –Consistent EU Network Codes Memoranda of Understandings Mandatory Guidelines

Circumstances where Cooperation NB Neighbouring Countries Where direct interconnection –E.g. UK, Ire, Be, Norway, Netherlands Where new Rules being introduced already operating elsewhere Specific Projects (cross border investments)

Issues for Co-operation Open Season Transport, transparency, trading hubs New Projects (consenting, construction) Costs Gas Quality Balancing

Impacts from lack of Co-ordination Different Balancing Requirements –Move imbalance to other market, distort flows, impede trade Limiting Exit Capacity –Artificially curtailing flows Different Open Seasons –Risks if required to commit to one jurisdiction first –Compounded if no effective Secondary Trading –Restricts new entry

Dual Regulation Investments –Different tariff methodologies –Delays in decision making - need for joint consultations at early stages Access to Pipelines –Entry / Exit regimes –Balancing –Maximum Available Capacities –Quality Storage Production –Different Country for Connection to Grid

General Examples Licencing –By Two Regulators –Interconnectors –Storage production different from connection point Cross Border Pipes –Access (different Entry /Exit Regimes) / Open Season & 2 nd ry Cap availability Pricing Methodology –Balancing Regimes –Compression –Regulatory Asset Bases Market Arrangements –Balancing –New Procedures –Quality

Specific Examples UK Exit reforms –No advance Discussions with Ireland / NI Difference in Open Season (Ne, Be) –Transportation Pricing –Process itself –Technical Access Conditions Interconnector Auctions (D – NL; DK – D) Art 22 Exemptions (OFGEM /Dte) –Two regulator Decisions required –Timing different

Specific Examples (2) UK Interconnector Licencing (Fr, Be, Ire) –Licenced by two Regulators –Potential for Conflict Gas Quality (UK, Be, NL) –Different Approaches Inconsistent Approaches to Market Development –Application of Legislation (Swe, Den) –UK Transporter can’t operate Interconnector –German approach to Pipe/pipe and Market Area Competition

How to Manage Risks Assign Regulatory Responsibilities Consult Regularly and with Market Players Framework for Dealing with X border issues –Consult before Licencing - early –Co-ordinate Actions Guidelines based on Case Histories Harmonise Business Practices (rules / regulations) Dispute Resolution Process

Market Arrangements Mechanisms should be Compatible – Not necessarily Harmonised Capacity –Entry / Exit need to Correspond –Definitions of Firmness Harmonise Products Sell combined Products Common Auctions or Open Seasons Balancing Regimes –(hourly v daily) –Penalties Electronic Communications Same timelines for advising Allocated Quantities

Market Arrangements (2) Secondary Market Harmonise Rules Transparency Trading Hubs Tariffs –No need to fully harmonise if trade not affected –Compression costs can Distort Trade –Joint Consultations could be useful Gas Quality Discrepancies –Volumetric v Energy

Dispute Resolution Comments Desirable but not Major Issue Will become increasingly NB as supplies more diversified and longer distances May Require National Legislation Rules enabling EU Commission to take Greater Role may be Needed

Proposals for Dispute Resolution Independent Mediation (non-binding) Conciliation – Non binding Formal Independent Arbiter – binding ERGEG –Implementing guidelines and monitoring –More powers under 3 rd package– binding Treaties between neighbouring Countries Mandatory Guidelines European Courts –Lengthy Process –May be unavoidable