8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna 11.09.2007.

Slides:



Advertisements
Similar presentations
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
Advertisements

EU funds’ evaluation plan , Latvia
Czech approach to Regulatory Impact Assessment Prof. Michal Mejstřík Chairman of Regulatory Impact Assessment Board (RIAB) of the Czech Government Legislative.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
THE CERTIFYING AUTHORITY
- GDP 2011 versus 2010 – increase by 5.5%
Final Report Anton Schrag REGIO D1
AUDIT AND CONTROL UNIT EUROPEAN REGIONAL DEVELOPMENT FUND (ERDF) AND COHESION FUND (CF) QUIRINO MEALHA DIRECTOR.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
15 th September 2013 Enagás and TIGF Information to NRAs.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Dr. Frank-Peter Hansen Bundesnetzagentur.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
Staatssekretariat für Wirtschaft SECO Eidgenössisches Departement für Wirtschaft, Bildung und Forschung WBF Project Completion 1.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
CARICOM. Ninth EDF Project Caribbean Integration Support Programme (CISP ) Statistics Component 34th MEETING OF THE STANDING COMMITTEE OF CARIBBEAN STATISTICIANS.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Public Procurement in Albania in the framework of recent reforms PUBLIC PROCUREMENT AGENCY 1.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
ZHRC/HTI Financial Management Training
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
PCR Status report AESAG, September Supported by:
Open market coupling 1 Open Market Coupling 2nd Miniforum/ Stakeholder Meeting in ERI Northern Europe Copenhagen, June 27, 2006 Dr. Frank-Peter Hansen.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
WG FBA Status Report Andrzej Detkiewicz IG, 30 ty January 2008.
Actions for establishing a Single Auction Office for CSE 9 th IG Meeting Milan, 18 th July 2008.
1 Auction Office establishment, antitrust issues and Project Plan IG Meeting, Vienna January 30 th 2008.
The Status Report for IG meeting Wojciech Jarosz February 13 th 2009.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
Actions for establishing a Single Auction Office for CSE 8 th IG Meeting Milan, 3rd June 2008.
STEPS FOR FUNDING ELI-NP March 11 st 2011 Dan Cutoiu.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Undertakings for collective investment in transferable securities (UCITS) Worldbank Global Development Learning Network The Advanced Program in Accounting.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
RBIG WORKSHOP 1 Supply Chain and Asset Management.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 1 October, 2010 Jurmala ACER and regulatory empowerment.
A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010.
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
1 WG FBA report Uroš Gabrijel IG Meeting, Vienna, May 9th 2008.
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Chisinau, Republic of Moldova 2017
All Wales Safeguarding Procedures Review Project
26th February 2015 Teleconference
Kick-off meeting of the project UMBRELLA
26th February 2015 Teleconference
LNG Workshop Bilbao, March 13th 2009 GLE.
Presentation transcript:

8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna

2 State of Play Antitrust and Merger Regulation Issues Documents requested by CEE-Regulators Updated Project Plan Project Office Open Topics Conclusions Agenda

3 Managing director/MD contract Cost sharing agreement Business plan, budget and shareholder‘s loan ( ) Articles of association Bank account Staff recruiting (Project Team) /employment contracts / accountant service Office ( ) Founding procedure, necessary TSOs‘ confirmations, proxy issue Antitrust and Merger/Cartel regulation issues Service Level Agreement (inter TSO contract) Software (common coordinated capacity calculation and allocation) Communication infrastructure and IT hardware Auction Rules, external data transfer (MLA) Not yet started Started In implementation Completed State of Play

4 Antitrust & Merger Regulation Issues I/II Several antitrust & merger regulations could be relevant:  Antitrust regulations following art. 81/82 of EC contract  Mergers following merger Regulation 139/2004  Antitrust and merger regulations under national (German) laws Previous steps, 1 st letter to the Commission:  CEE TSOs have already submitted a letter, on 26 th March, regarding antitrust & merger issues to the Commission.  The answer of the Commission puts the burden of final judgement of the notification need on TSOs’ shoulders.

5 Antitrust & Merger Regulation Issues II/II Previous steps, 2 nd letter to the Commission:  CEE TSOs have submitted a second letter, on 10 th July, to the Commission for final clarification – whether the Commission is responsible or national competition authorities.  A questionnaire has been submitted to CEE TSOs by the Commission for helping them to clarify the situation.

6 Documents requested to Regulators At the last IG-meeting (June 12th in Vienna) the CEE Regulators requested: Updated Project Plan Articles of Association Basic Business Plan figures  Documents have been submitted to CEE-lead Regulator after receiving the approvals of all TSOs by end of August.

7

8 Project Office Creation of an permanent project structure:  In order not to lose time and to avoid further delay a Project Office will be established.  If the antitrust & merger regulation issues are clarified the Auction Office (as a independent legal entity) can immediately be established. Project coordination:  The Project Office (managed by the designated MD of the future AO) coordinates the work and acts as the overall project management.  A permanent project staff works part/full-time for establishing and developing the future allocation system.  The already established structure (Working Groups) will assist the Project Office.  Also a external consultant has been chosen to support the work!

9 Open topics I/II Scheduling, Curtailment:  Comprehensive concept has already been elaborated and experts of involved TSOs are going to finalise it during the next month.  Also different concepts and possibilities of curtailment are under investigation. Test calculations, Long Term Concept (Y,M auctioning):  First test calculations have been performed (only for D concept).  Long term concept is still under elaboration; first concept test calculations are currently in progress.  The Consultant will also assist in performing test calculations.

10 Open topics II/II IT:  IT-Tender for capacity calculation and auctioning is under preparation.  Delay is obvious.  Experience of similar projects shows that development will take about 6 months.

11 Conclusion I/II Statement 1 at last IG meeting: “It’s obvious that still problems (e.g. Y, M concept and improvement of transparency in D cap. calculation) have to be solved.”  CEE TSOs have chosen to take external consultant support, especially for improving the transparency in D capacity calculation.  First promising inputs and suggestions have already been made for improving the methodology in terms of transparency.

12 Conclusion I/II Statement 2 at last IG meeting: “To start with flow-based D (and M) auctions within 2008 is the realistic case. However additionally has to be solved: How to proceed with especially Y auction for 2008 in order not to “block” flow-based D (and M) auctions in advance (support of regulators)?”  CEE TSO have elaborated two options and ask Regulators for their opinion: Option 1: Maintain the present method – bilateral (coordinated) auctions – for the whole year Option 2: Let the possibility of FBA introduction during the year 2008 and shift offered capacities for 2008 from yearly to monthly and daily in the whole CEE region.

13 Implementation of load flow-based auctions in CEE Option 1 (January 2009):  Consistent package for Y/M/D can be developed from the scratch  Sufficient time for proper testing Option 2 (September 2008):  Any delay will cause new change  Consistency of 2008 NTC approach for Y/M with FBA for D needs to be investigated  Capacities for Y/M most likely have to be decreased to safeguard FBA for D

14 Thank you for your attention