Assessment of differences in market designs in the CS region Milan 18 July 2008.

Slides:



Advertisements
Similar presentations
Secondary Market with Transmission Capacities ČEPS, a.s. 11/2006.
Advertisements

How to do intraday capacity pricing in a continuous trade environment? 10 October 2011 NRA-TSO-PX meeting (Informal minutes, made during workshop, of the.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
EuroPEX Decentralized Market Coupling as the preferred cross-border method B. den Ouden, President of Europex APEx Annual Conference 2004 Leipzig, Germany,
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Why introducing implicit auctions in the Central South region? Potential gains from improving allocation methods of day-ahead cross border capacity Milan.
CASC.EU S.A. CASC.EU – Capacity Allocation Service Company
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
Name Surname Milan, November 2010 European Federation of Energy Traders 1 The Central South Region and the European Target Model – How to ensure consistency?
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
Guidelines for Good Practice on Information Management and Transparency EuroPEX Comments and Suggestions Brussels, 6 th of July 2006.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.
Draft document – Work in progress
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
Milan – 16 th November 2010 Cross Border capacity allocation in 2011: CASC Project.
CASC.EU SA and its role in Explicit auctions 16/11/2010 CASC.EU SA 1.
1 WHOLESALE ELECTRICITY MARKET DESIGN AND STRUCTURE Massimo Parati Market Department Italian Regulatory Authority for Electricity and Gas Milan, March.
Italian – Slovenian Market Coupling CSE SG meeting 16 November 2010, Milan.
JP “Elektromreža Srbije” security reliability sustainability.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
How Italian electricity market manages network constraints Rome, Turin, September 2007.
The Market Coupling Experience in Europe Jean-François CONIL-LACOSTE CEO Powernext SA CEO EPEX Spot SE APEX 2008 Conference Session 1 - Part 3: European.
_________ CASC.EU Intraday Forum _________ ROME, March 13 th, Intraday Forum, ROME, 2012/03/13.
Open market coupling 1 Open Market Coupling 2nd Miniforum/ Stakeholder Meeting in ERI Northern Europe Copenhagen, June 27, 2006 Dr. Frank-Peter Hansen.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Market design and market power in wholesale electricy markets Guido Cervigni IEFE-Bocconi University, Milan CEEM – Summer School on Economics of electricity.
Electricity trading in emerging markets Vienna Economic Forum Tirana, Albania 8-9 June 08 1 EXAA 2008.
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
SUMMARY OF THE IG DISCUSSION PAPER ON THE BALANCING IN THE BALTICS Aistija Zubaviciute, NCC Baltic Electricity Market Mini-Forum 23rd November 2006, Vilnius.
Actions for establishing a Single Auction Office for CSE 8 th IG Meeting Milan, 3rd June 2008.
Long term allocation 2011 Italian borders Central-South and Central-West Regions 2nd Joint RCC meeting Milan, September 28 th, 2010.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
Is there a need for a change?
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
efficient capacity allocation method
1 IG Meeting Milan, 18 th July 2008 Cost of Firmness of Capacity.
2 nd Mini-Forum for Central-Southern European Region EuroPEX Discussion Points Milan, 17 th of July 2006.
Linnfall Consulting Market design: the energy-only market model Linnfall Consulting September 2015.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
SESSION 1. Part 4 IMPORTANCE OF INTRADAY AND ADJUSTMENT MARKETS José Javier González Market Operations Director OMEL 2008 APEX Conference Sydney, October.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
CASC.EU – Capacity Allocation Service Company CASC.EU SA 23/11/10CASC-EU S.A. (R)
Agenda Pag. 1 I.4M MC – Common parts II.Further Information on Romanian Market 1.Regulation for DAM organization and functioning with respect to price.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
Power market structure and market price development in the SEE region
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
2nd Mini-Forum for Central West Electricity REM
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
ETSO main 2006 Issues for West-Central Europe Market Development
Lithuanian PX Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Draft document – Work in progress
efficient capacity allocation method
Presentation transcript:

Assessment of differences in market designs in the CS region Milan 18 July 2008

Background  In the 6th IG meeting PXs were asked to present an assessment of the differences in market designs.  The assessment is the second step of the action plan covering 2008 activities for the implementation of day-ahead implicit auction in the CS region.  The assessment summarizes the results of a survey based on questionnaires sent to TSOs and PXs of the CS region.  The following Countries provided an answer: Austria (EXAA and APG), France (PowerNext), Greece (HTSO), Italy (GME and Terna) and Slovenia (Borzen).  Additional information was collected through the PXs’ and TSOs’ websites or through direct contacts.

Background The questionnaire focused on the following features of the day-ahead energy markets operating in the CS region: 1. Overview of trading arrangements 2. Features of traded products 3. Algorithms and matching rules 4. Impact of the current Italian Market Splitting on the cross-border implicit auction project for the CS Region 5. Timing 6. Guarantee and settlement systems 7. Governance, institutional and regulatory framework 8. Monitoring and transparency rules 9. Market liquidity

Overview of trading arrangements  PXs exist in all Countries, except Switzerland where EEX organizes a day-ahead market for the Swissgrid balancing area  PXs operate markets with physical delivery in all Countries (orders may refer to a specific point of injection/withdrawal or to the control area of the relevant TSO) During the design phase of market coupling, it could be investigated whether other differences not specifically addressed in the questionnaire could would have different impacts on the coupling project compared to impacts they already have on the results of explicit auctions:  Eventual modification of the arrangements for market participants to notify import-export schedules to TSO’s.  Impact of Market coupling to the contractual framework between PXs and TSOs (shipping agent, data flows, payments and guarantess, etc).  Consequences of coupling a pool-like market (e.g. IPEX) with an exchange-like market (e.g. Powernext, EEX, EXAA, etc.)  Impact of deviating national regulations on renewables, CO2 etc. (cross-subsidizing effects)

Features of traded products Traded products in the day ahead auction are not homogeneous across markets:  In Italy, Greece and Slovenia only hourly products  In Austria, France and Germany both hourly and block orders The presence of block orders in case of Market Coupling implies:  either a mechanism based on iterations (as in Belpex); or  implementing of block constraints in the central solver algorithm; or  implement some form of volume coupling Price and volume steps are rather uniform  some form of coordination of the format of the bids/offers sent off by PXs to the Central (coupling) office will be required for market coupling

Algorithms and matching rules There are substantial differences in the algorithms that might impact on the choice of the market coupling model:  the most relevant feature is the use of locational prices to implement the allocation of available domestic transmission capacity (IPEX and HTSO) Price caps/bid limits/values of lost loads are quite diverse:  the lowest one is implemented in Greece (150 €/MWh)  the highest one is implemented in Austria, France and Italy (3.000 €/MWh) For the efficient functioning of the market coupling, coordination on those values might be crucial in times of generation tightness.

Impact of the current Italian Market Splitting on the cross-border implicit auction project for the CS Region The Italian reference price for the market coupling is the price of the neighboring Italian zone to the border in which the coupling mechanism is implemented (North zone for France, Switzerland, Austria and Slovenia, Brindisi zone for Greece):  the same reference prices of the Italian market are actually considered for explicit auctions One of the approaches to integrate the Italian market splitting in a regional market coupling could be the following:  the hypothetical NEC of IPEX would describe the relevant zonal prices with different quantities of import/export from/to the coupled market  the hypothetical NEC of IPEX would be calculated by considering the domestic congestions as from the market splitting algorithm

Timing Market coupling requires all involved Countries to synchronize at least in the following deadlines:  collection of demand and supply bids by all involved markets must end before the coupling algorithm is run  publication of domestic market outcome by each national PX must take place after the market coupling results are calculated There is an heterogeneity both in terms of gate closure times and in terms of computation time:  a strong effort in the direction of the harmonization of timing is very likely to be necessary in order to proceed with the coupling of the day-ahead markets in the CS Region.

Guarantee and settlement systems Guarantees required to participate in the organized markets are similar in all Countries (generally a bank letter of credit and/or a cash deposit covering the countervalue of the outstanding debt). Settlement times are very diverse. The greatest difference is between:  PowerNext: the working day after the trading day  IPEX: the 16th working day of the second month following the month of trading In case PXs with different settlement timeframes are coupled, PXs and Regulators should address the issues of harmonizing those timeframes or, alternatively, covering the implied financial costs or allocating the extra revenues

Governance, institutional and regulatory framework Authorities involved in the control of day-ahead markets are, uniformly across Countries:  the energy regulatory authorities  the governments (through the Ministries or Directorates for Energy) In France, the Financial Markets Authority (AMF) controls Powernext activities. However, since day-ahead products are defined as commodities, they do not fall under the scrutiny of the AMF. In all Countries national PXs and TSOs interact closely in organizing the electricity markets.

Monitoring and transparency rules  Market monitoring is generally a function carried out by the energy regulatory authorities, with the support of PXs  Publication of aggregated supply and demand curves, traded volumes and prices and others indices is a common practice

Market liquidity  Market liquidity provides an indication of the amount of trades that occurs on the organized markets vs. bilateral trading.  Levels of liquidity of the markets are very different.  Market coupling could increase the liquidity of the involved markets.