Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.

Slides:



Advertisements
Similar presentations
Bruxelles, 13 February 2008 Regional Market and Cross Border Luigi de Francisci TERNA - Rete Elettrica Nazionale S.p.A.
Advertisements

4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
EuroPEX Decentralized Market Coupling as the preferred cross-border method B. den Ouden, President of Europex APEx Annual Conference 2004 Leipzig, Germany,
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Why introducing implicit auctions in the Central South region? Potential gains from improving allocation methods of day-ahead cross border capacity Milan.
CASC.EU S.A. CASC.EU – Capacity Allocation Service Company
Assessment of differences in market designs in the CS region Milan 18 July 2008.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
3rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland Electricity REM Roundup and next steps David Halldearn – Head of European Electricity Policy,
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
The future of GB-Continent: Interconnection & Electricity Regional Initiative Simon McVeigh France-UK-Ireland Stakeholder Group meeting 4 th July 2008,
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
Introduction of an Intraday market on the Italian borders for the year 2011 Terna proposal Electricity Regional Initiative – CSE Region 15th Implementation.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.
Update on Coordination of long term auctions in the FUI region FUI IG, London, 13 th September.
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
Draft document – Work in progress
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
Milan – 16 th November 2010 Cross Border capacity allocation in 2011: CASC Project.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
1 12 th Implementation Group Meeting 26 th March 2009 Establishing a SAO in the CS Region.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
PCR Status report AESAG, September Supported by:
The Market Coupling Experience in Europe Jean-François CONIL-LACOSTE CEO Powernext SA CEO EPEX Spot SE APEX 2008 Conference Session 1 - Part 3: European.
Open market coupling 1 Open Market Coupling 2nd Miniforum/ Stakeholder Meeting in ERI Northern Europe Copenhagen, June 27, 2006 Dr. Frank-Peter Hansen.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
Actions for establishing a Single Auction Office for CSE 9 th IG Meeting Milan, 18 th July 2008.
Actions for establishing a Single Auction Office for CSE 8 th IG Meeting Milan, 3rd June 2008.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
2 nd Mini-Forum for Central-Southern European Region EuroPEX Discussion Points Milan, 17 th of July 2006.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Introduction of an Intraday market on the Italian borders for the year 2011 Electricity Regional Initiative – CSE Region Milan, 16/11/2010.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Power market structure and market price development in the SEE region
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
2nd Mini-Forum for Central West Electricity REM
Supported by: PCR Status report AESAG, September
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
IFA Market Coupling Update
ETSO main 2006 Issues for West-Central Europe Market Development
Gas Regional Initiative
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Supported by: PCR Status report AESAG, September
29th April 2014 Teleconference
Presentation transcript:

Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity Milan – April 21th, nd Central South SG meeting

Action plan on day-ahead implicit auction: background During the 6th CS Implementation Group meeting PXs and TSOs were mandated by Regulators to provide an action plan for day-ahead market coupling that:  has a regional scope  follows a step-wise approach by identifying those borders where market coupling could be implemented at an earlier stage  is compliant with Regulation 1228/03

Action plan on day-ahead implicit auction: the content In the action plan, we use the term implicit auction instead of market coupling. The reason is that implicit auction refers not only to market coupling, but to a wider range of technical/legal arrangements (market coupling /market splitting / dome coupling) that integrate capacity allocation and energy trading, providing consistent price signals and ensuring that the available transfer capacity is fully used.  The action plan identifies the 2008 activities for the implementation of day-ahead implicit auction (market coupling / market splitting / dome coupling) in Central-South Europe as a mean to allocate cross border capacity  The time schedule proposed is indicative and may be subject to changes on the basis of the needs and the scope of each action.

Action plan on day-ahead implicit auction: the steps WhatWhoWhen [indicative deadlines] 1.Study on the existing methods for day-ahead allocation of interconnector capacity in the region GME and, if other borders are added to the study, in collaboration with the relevant PXs and TSOs 2nd SG meeting, April Assessment of differences in market designs in the CS region and identification of coordination requirements with other relevant regions Working groups[by end of June 2008] 3.Preliminary feasibility study, part 1: Identification of general features for implicit auctions models in the Central-South region and identification of the borders where implicit auctions can be developed at an earlier stage IG[by July 2008] 4.Preliminary feasibility study, part 2: Development of possible implicit auction models for the borders where implicit auction can be developed at an earlier stage (pilot project) Involved PXs, TSOs and Regulators[by October 2008] 5.Development of a proposal for MoU and definition of timetable for implementation Involved PXs, TSOs and Regulators[by end of 2008]

Action plan on day-ahead implicit auction: step 1 WhatWhoWhen 1.Study on the existing methods for day-ahead allocation of interconnector capacity in the region GME and, if other borders are added to the study, in collaboration with the relevant PXs and TSOs 2nd SG meeting, April The study will focus on the Italian borders. The aims of the study are:  to identify the potential for efficiencies gains from the adoption of implicit auctions instead of explicit auctions as a mean to allocate interconnector capacity at day-ahead stage  to give, where possible, a quantitative background to assessment of the superiority of implicit auctions in short term trading;  to give, where possible, a quantitative background to the evaluation of the opportunity to adopt implicit auction mechanisms for each of the analyzed borders.

WhatWhoWhen 2.Assessment of differences in market designs in the CS region and identification of coordination requirements with other relevant regions Working group[by end of June 2008] The study will be divided in two parts:  The first part should highlight and compare the features of the day-ahead markets in the CS region that have an impact on the implementation of implicit auction mechanisms  The second part should highlight and compare the features of those day-ahead implicit auction mechanisms for the congestion management that are already in place or that are on the way to be developed in other European regions. It should also assess the opportunities offered in terms of interregional integration between the Central-South region and other regional initiatives. Action plan on day-ahead implicit auction: step 2

WhatWhoWhen 3.Preliminary feasibility study, part 1: Identification of general features for implicit auctions models in the Central-South region and identification of the borders where implicit auctions can be developed at an earlier stage IG[by July 2008]  Special focus to the identification of the requirements for an efficient coordination with the “auction office project” that the TSOs of the pentalateral group are developing.  Implicit auction models should be “implementable” in all the borders of the CS region either directly or subsequently through, e.g. explicit auctions / market coupling /dome coupling/ market splitting or similar procedures. IG should identify those borders where implicit auctions could be implemented at an earlier stage Action plan on day-ahead implicit auction: step 3

WhatWhoWhen 4.Preliminary feasibility study, part 2: Development of possible implicit auction models for the borders where implicit auction can be developed at an earlier stage (pilot project) Involved PXs, TSOs and Regulators [by October 2008] PXs, TSOs and Regulators involved in the borders where implicit auctions can be established at an earlier stage should develop feasible implicit auction models.  Models should identify the general technical (market and grid model) and legal/governance aspects.  The detailed description of technical and governance aspects of the models is a task to be carried out during the design phase of the project (after the MoU is signed). Action plan on day-ahead implicit auction: step 4

WhatWhoWhen 5.Development of a proposal for MoU and definition of timetable for implementation Involved PXs, TSOs and Regulators [by end of 2008] PXs and TSOs and Regulators involved in the borders where implicit auction can be established at an earlier stage will present to Regulators a draft proposal of MoU. The MoU:  shall be open to the participation of PXs and TSOs of the borders not initially involved in the project  shall include a timetable for the implementation that shall be agreed upon by interested parties prioritizing the implementation on the basis of the results of the above mentioned preparatory studies, feasibility studies and models Action plan on day-ahead implicit auction: step 5

The proposed action plan has been agreed by:  GME, Terna (Italy)  Powernext, RTE (France)  EXAA (Austria)  E.ON (Germany)  Borzen (Slovenia)  HTSO (Greece) SwissGrid (Switzerland) agreed only to step 1 and 2