11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.

Slides:



Advertisements
Similar presentations
Carrier Pre-Select Meeting BT Systems Interface Roadmap
Advertisements

The Implementation Structure DG AGRI, October 2005
European Commission: Environment Directorate General Slide: 1 ECCP Aviation Working Group Mandate and draft work programme Directorate C – Air and Chemicals.
BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0.
11 Simultaneous Provide. 22 Disclaimer: The information contained in this Presentation slide-pack is confidential information for discussion purposes.
Presentation of the proposed Annex 19 – Safety Management
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
New EU Rules on Derivatives Trading The EMIR Reporting Technical Standards Victoria Cooley OTC Derivatives & Post Trade Policy Financial Conduct Authority.
Ofcom Consumer Switching
Ofcom Consumer Switching
Wholesale Line Rental Consumer Issues Task Group 5 August 2002.
Third Energy Package for Change of Supplier 2009/73/EC.
DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Why are you here? You are considered to be a core stakeholder in the changes taking place to our systems. To some extent you will be affected by this.
Simultaneous PSTN and Broadband Provision Process Incorporating Broadband Movers Issue 5.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
Rosemarie Day Deputy Director and Chief Operating Officer Thursday, May 8, 2008 Operations Report Current Priorities and Future Plans.
Emergency Services Workshop UK VoIP 999/112s John Medland – BT 999/112 Policy Manager.
15 th September 2013 Enagás and TIGF Information to NRAs.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Nexus Workgroup Transition Approach Update 8 th January 2014.
Children and Families – Early Help and Prevention Children’s Centre Briefings Transition Arrangements October 2013.
All-IP Transition Initiatives June 17, ATIS Board of Directors’ Meeting October 20, 2011 NANC Meeting June 17, 2014 IP Transition Work within.
Consultation on the proposed closure of Streetfield Middle School from August
National Patient Safety Alerting System (NPSAS) Patient Safety Domain NHS England Publications Gateway Ref No
WIOA Timeline and Action Plan for States
Wholesale Retail Separation and e-Portal 13 November
11 Ofcom Consumer Switching What does it mean for us all? Bev Bytheway-Jackson Product manager
Ofcom Consumer Switching
11 Ofcom Consumer Switching 17 June 2014 Bev Bytheway-Jackson WBC Product Manager Tel:
Title Consult 21 Mike Reed - Openreach Name 21 st February 2006.
Thank you.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Online infringement of copyright - the Digital Economy Act June 2010 Robin Fry.
How to do business guide. Fixed, Data and Hosted Solutions by Mandy Fazelynia Latest update – 11/11/2013 Operations Director.
Imposing access obligations under the new framework Karen Hardy.
Delaware Health Benefit Exchange (HBE) Project Update Delaware Health Care Commission Meeting: March 28, 2013.
Consult21 IMWG Pre-Migration Scheduling Consultation Summary & Approach The purpose of this presentation is to share the summary and.
Main outcomes of 21 th ERG Plenary Roberto Viola, ERG Chair Brussels, 15 June 2007.
BT Wholesale Customer Roadmap 1 st July 2008 Welcome Chris Booth Business Improvement Programme Graham Crane Consult21.
Xoserve Change Management: Guiding Principles. Context This deck details a set a guiding principles for future change management at Xoserve The principles.
FAQs about the new regulatory framework Lucy Rhodes
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
Interconnect Product Forum 21 st October STANDARD CONTRACT FORUM SESSION 21 October 2009 Keith Mitchinson.
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
BT Wholesale Products June, SOR Management Tool Angus Flett John Skingle.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
1 Consult21 webcall – BT Wholesale Service availability data (Datasets) Peter Davis, BT Design Bill du Cann, BT Consult21.
Partial Private Circuits Kalpesh Brahmbhatt 31 October 02.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 14 – 03 November 2008 Information.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
On March 14, 2013, Governor Chris Christie signed into law Assembly Bill A720, which mandates all NJ state employees be enrolled in direct deposit by.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Industry Dialogue on xoserve Services 14 th September 2007.
ACMA Tune-up 400 MHz (Update and Milestone 3) MHz - Introduction 11 March 2016.
Fair Go Rates System Dr Ron Ben-David Chairperson
School Cleaning Update
Managed Access to NIHR-funded Research Data
Fair Go Rates System Dr Ron Ben-David Chairperson
CRUE – The Way Forward Vicki Jackson
Approach to Market Cutover - Draft for Discussion
Release 3 Update 07th March 2018.
Timeline Overview Planned Timescales
Presentation transcript:

11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014

22 Final statement (first phase) – key points Scope remains: –Voice and broadband switching within Openreach network –Residential and small business customers (NB all customers affected) –Other networks (cable and FTTP) and services (Pay TV?) in next phase Conclusions from consultation: –Implementation of the move from MAC to Notice of Transfer (NoT) for all voice and broadband switches to be complete by 20 th June 2015 –All proposed “front end” enhancements to NoT to be adopted and implemented by 20 th September 2014 –First industry working group meeting 22 nd January 2014, chaired by Ofcom and supported by OTA Second phase: –Further examination to consider - the extent and cause of erroneous transfers (largely as result of Working Line Take Overs) - feasibility of extending to include other technologies, networks and services - further development of NoT, or hub/database solution –Details and timeline to be published in Spring 2014

33 Openreach proposed milestones for move to NoT  January 2014Industry working group to agree governance arrangements and underlying principles of harmonised process  March 2014Stakeholder agreement on implementation strategy  April 2014Stakeholders to submit Implementation Commitment Plans & agree e2e process  May 2014Openreach to issue straw man interface spec, CPs to begin detailed design  June 2014Wholesale CPs to submit straw man of their interface spec  October 2014Openreach and wholesale CPs to confirm detailed design  November 2014Openreach and wholesale CPs to publish final technical spec and CPs to begin interlock testing  January 2015Final release of Openreach systems updates for CP testing  January-June 2015Business readiness and testing  June 2015Launch of harmonised switching process

44 Points to note about NoT implementation Ofcom have opted for a “big bang” approach Ofcom recognise that this requires more co-ordination and collaboration across industry than “normal” changes A number of issues for further debate within the working group, such as: - mandatory use of RIDs on SMPF and FTTx - application of emergency restoration process - KPIs required to support enforcement - strategic KCIs needed from wholesale CPs on losses/ceases Acknowledged that switches of larger businesses might be impacted, but regulation will not apply, so down to commercial negotiation with Openreach

55 Enhancements to NoT  Record of consent –Call recordings of telesales, “I agree” button for online orders –To include direct record of consent, explanation from CP that it is required to create this record, customer name & address, time, date & means by which consent given, place (where appropriate), address and CLI of target line –Retrievable on an individual basis and retained for 12 months  Provision of better info on implications of switching –NoT letters to contain precise info on ETCs, including means by which they must be paid, calculated according to planed switching date –impact on ancillary/retained services, including price, specific to consumer –clear statement that customer does not have to contact LP  Mandatory use of functionality to ensure seamless transfer of bundled services with no loss of service (e.g. Sim provide, Linked Orders, SIM2) where customer makes a single request to one GP  Mandating some best-practice elements of Working Line Takeover (WLT) process ₋ No WLT order placed without exact match; GPs to take all reasonable steps to identify ₋ Notification letter to “incumbent” customer, via post or another durable format if agreed

66 To be considered in future phase: Options to address “poor quality Openreach address data – a major cause of Erroneous Transfers” Whether recent industry developments, such as the MPF helpline, are sufficient to address lack of visibility of key data in identifying correct line Whether a harmonised process giving consumers a similar end-to-end process regardless of underlying technology is possible (e.g. for moves to/from cable) Whether further enhancements to the AoT process are needed (e.g. mandating use of Cancel Other Whether a new GPL solution, based on Transfer Code and an industry database, may be necessary and proportionate