Web Enabled Vendor Data Collection on BP Angola Block 18 Project Howard Chipperfield, Information Manager BP c o n t e n t e n g i n e e r i n g.

Slides:



Advertisements
Similar presentations
Project Procurement Management
Advertisements

Maximo extension to worldwide Suppliers for complete data integrity
Contract CloseOut.
© 2010 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys.
Evolution of Parametric Analysis within Rolls-Royce Purchasing
Benchmark Estimating – Company History Benchmark Estimating An introduction to our company.
Dr. Terry Moss, General Manager, Eskom (South Africa) TECHNOLOGY TRANSFER: HOW TO MAKE IT HAPPEN.
Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration.
1 NEMA NEMA Board of Governors November 13, 2004 Report.
Discover ACP It's Easier than Ever to Hire Temp Labor.
E-Business Strategies in the European Power Generation Equipment Market “OEMs and turnkey contractors seek to transform themselves from traditional equipment.
Crown Commercial Service Commercial Contract and Supplier Management
Welcome to Viewing Vendor Invoice - VVI
1.  Consider: What are my Hazard Risks & consequences?  Awareness to storm and flood risks ◦ Winds ◦ Floods ◦ Nor’easter ◦ Snow/Ice Storms ◦ Hurricane.
Building Information Modeling
© 2014 Rockwell Collins. All rights reserved. Middle East Airport Construction Projects: Lessons Learned From an ICT Perspective May 2015.
Assuming Software Maintenance of a Large, Embedded Legacy System from the Original Developer by William L. Miller Lawerence B. Compton Bruce L. Woodmansee.
BAE SYSTEMS Overview of Systems Engineering at BAE SYSTEMS & ALENIA MARCONI SYSTEMS 8/10/2015/MS By Leigh Watton Friday 27th July 2001.
Integrated Process Model - v2
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
The Crown and Suppliers: A New Way of Working People & Security15:35 – 16:20 Channels & Citizen Engagement Social Media ICT Capability Risk Management.
Scotland’s Environment Web LIFE Project LIFE10 ENV-UK Paula Brown Senior Project Manager – SEPA.
The BIM Project Execution Planning Procedure
1 Procurement Quality Assurance Use quality as the framework for process/continual improvement Use quality as the framework for process/continual improvement.
Business Solutions for Microsoft Dynamics CRM.
Electronic and Information Resources (EIR) Accessibility in Cooperative Contracts Procurement June 2013.
IBuy Services (Click CSM) Introduction P2P Compliant Services Procurement.
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
The FIX Protocol as an Effective Solution for Algorithmic Trading Kevin Houstoun, Co-chair FPL Global Technical Committee, Consultant to HSBC.
Business Solutions for Microsoft Dynamics CRM.
By Anthony W. Hill & Course Technology 1 Product Evaluation Strategies and Support Standards Beisse.
Global Program Management Dawn Davis, SVP Global Records Management.
Stockton BC Corporate and Social Inclusion Select Committee Ian Taylor NEPO Director.
Key issues in current procurement practice What’s hot & what’s not.
Construction Work Packaging
EMARS User Group Meeting April 25, Agenda Opening Remarks Barbara Aldridge-Montfort Ethnic Minority VendorsDon Speer/Joan Graham EO1sDon Speer/Joan.
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
BMT Sigma Capability Overview. BMT Group An international network of subsidiaries providing engineering, design and risk management consultancy Wholly.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Customer Story Leggett & Platt’s Enterprise Procurement System.
First 5 LA Phase III Website Strategic Plan Presentation to Public Affairs Committee July 13, 2006.
EPotential ICT Capabilities Resource. The ePotential ICT Capabilities Resource (ePotential) is designed to: Assist teachers to develop their own ICT Professional.
Resiliency Track Readout August Objective and Scope Objective: –To share best practices in supply chain resiliency Track Scope: Product, Supplier.
© 2012 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Public Protection Service 2008/9 Charter Mark and Electronic Data Management System (EDMS) Improve performance and efficiency together with improving customer.
1 Welcome To: 360 Feedback Overview Quantum Services Inc.
© Nano Time Limited – October 2008 Source Planning What –Analytical process that for creating procurement and supply strategies for key categories Wh y.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Accelerate - Integrate - Expand Reducing complexity, time and cost Application Accelerator.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
Chapter 11 Selecting the Best Alternative Design Strategy Modern Systems Analysis and Design Third Edition 11.1.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
Packaging Design: Key Requirements in the Thermoformed Package Development Process.
Construction Work Packaging
Configuration Management
BUSINESS PROCESSES MAP
Global Strategic Sourcing Business Review with Joe Sutton
Managing Operational Planning and Resource Management Financial
بازاریابی و بازرگانی زمستان 93.
WaterHUB People Worksteam Update 10 July 2018.
AWP Scalability The Acme Solar Project.
Modern Systems Analysis and Design Third Edition
Infra program Project outline Jouko Kankainen
Indirect Upgrades Rules of Engagement February 2018 INTERNAL USE ONLY
Modern Systems Analysis and Design Third Edition
Industry Engagement Program Medical Diagnostic Imaging (MDI) Equipment
Modern Systems Analysis and Design Third Edition
WORKSHOP Establish a Communication and Training Plan
Presentation transcript:

Web Enabled Vendor Data Collection on BP Angola Block 18 Project Howard Chipperfield, Information Manager BP c o n t e n t e n g i n e e r i n g

3. Define/Review Class Requirement Templates 3. Define/Review Class Requirement Templates Define and justify requirements Develop collection templates 2. Define/Review Standards 2. Define/Review Standards Upgrade standards Develop new standards Manage reference data 4. Develop/Improve Capture Process & Tools 4. Develop/Improve Capture Process & Tools Implement best practice tools Impose tools on information providers Implement these processes Notify information providers 5. Define/Review Aggregation/ Validation Process 5. Define/Review Aggregation/ Validation Process Engage an expert partner Make IM Contractual 1. Establish/Coach Information Support Service 1. Establish/Coach Information Support Service 6. Review Lessons Learnt Modify processes for next time The Road Map Block 31 Information Management Strategy

Data Validation/Aggregation BP SYSTEMS KBR Stolt/Technip/FMC HHI Contract Responsibilities EPC Data Management 3D Model 2D Docs Design Docs Information Collection Tool (Phantom) Supplier Data Supplier Docs PH CM Contract with EPC PH CM Contract with BP

$4 billion 80,000 items 4-6 FPSOs 4-6 x 80,000 items Project Information Original Equipment Manufacturers (OEMs) Project Infra-structure Rotork Emerson Weir Brook Crompton KBR Engineering Procurement Contractors (EPC) Caterpiller Plenty Metrol Atlas Copco Rolls Royce Package Vendors BP Angola GPP BP Block 31

Using the ICT to deliver the EIHS

Completion Analyser gives on line feedback.

Benefits for Suppliers  Supplier input minimised to ease completion.  Many copy features.  Enter data once and reports generated for delverables. i.e. Hazardous area schedule.  Web based shadowing to support users.  On line completion analyser lets the supplier know the shortfalls.  Early completion – early payment!

Benefits for BP  Data completion moved from 50% on last project to 95% on block 18.  Data available 18 months earlier than on last project.  Information organised to enable sharing with other BP projects.  BP has captured essential data and document relationships electronically.  Accuracy assured by validation process.