Beatriz Martinez - SAT CFA Team 2 nd CFA Implementation Review ESAC, Madrid, 06 Jun 2013 CLUSTER FINAL ARCHIVE (CFA) Future developments.

Slides:



Advertisements
Similar presentations
Project Name Kelly Waters July Author: Date: Version:
Advertisements

Model Interchange Testing: a Process and a Case Study
What is Test Director? Test Director is a test management tool
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Photometry Data Model| Jesus Salgado | ESAC | 19 May 2010 | IVOA Interop Victoria | Pag. 1/5 Photometry data model Jesus Salgado
GRID Perspectives at ESA/ESAC Science Archives and VO Team Computer Support Group ESAC, Villafranca del Castillo, Madrid, Spain.
OPTN Modifications to Heart Allocation Policy Implemented July 12, 2006 Changed the allocation order for medically urgent (Status 1A and 1B) patients Policy.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 2: Functional Testing.
By Rick Clements Software Testing 101 By Rick Clements
Seminar for OCTs and EU outermost regions CARIFORUM-EC EPA negotiations.
Annual meeting with the MA of the ETC programmes April 2013 Financial management Juan Lopez Lledo, Budget and Financial mangement, Unit REGIO.A.3.
Making the System Operational
23 July 2012 Thomas Bergauer (HEPHY Vienna) Belle II SVD Construction Database 12 th B2GM Bad Aibling.
Cummins® INSITE™ Update Manager Training
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
Configuration management
Software change management
RiskyProject Project Risk Management Software
1 Scheme Combination Product and Labeling Lists. 2 Agenda Scheme Combination Background Task Team 11 Current Update Process Interim Update Process Future.
Project Scheduling: Lagging, Crashing, and Activity Networks
Billing and Electronic Health Record Upgrade Project September 25, 2013 Initiation and Planning Phase Presenters: Terry Reusser, Maggi Gahaller, Michael.
15. Oktober Oktober Oktober 2012.
ITEC800 – Group 1 Mobile G Calendar Ivan Alden [ ] Andrey Chislenko [ ] Kenfe-Mickaël Laventure [ ] Laurent Malvert [ ] José.
Heppenheim Producer-Archive Interface Specification Status of standardisation project Main characteristics, major changes, items pending.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
June 26, 2002; Page: 1 ESOC (TOS-OGR) European Space Operations Centre Manfred Warhaut Ground Segment Manager TOS-OGR ROSETTA Ground Segment.
By Guy Yariv Project Closure – Finally…
LP Seminar – Madrid – 20 October 2008 EUROPEAN REGIONAL DEVELOPMENT FUND REPORTING & MONITORING PROCEDURES Lead Partner Seminar Madrid, 20 October 2008.
The Dutch Dyslexia Programme A case study Open data access week RuG Natasha M. Maurits Professor of clinical neuroengineering Chair of the DDP.
Weekly Attendance by Class w/e 6 th September 2013.
L.C.Smith College of Engineering and Computer Science AppSealer : Automatic Generation of Vulnerability-Specific Patches for Preventing Component Hijacking.
2011 ILWS Science Workshop 28 Aug – 1 Sept Status of Cluster Active Archive (CAA) and Cluster Final Archive (CFA) Harri Laakso, Philippe Escoubet,
 Workflow that manages concurrent multiuser editors on a single ArcSDE data source  Versions represent states or views of the geodatabase  Edits.
SeqMonk tools for methylation analysis
By K atherine I E buoh ( M sc ) Information Technology Implementation Of Technical Analysis Stock Trading Application For The Nigerian Stock Exchange.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
Tom Lindstrom TL TooLs, Inc
CAA/CFA Review | Andrea Laruelo | ESTEC | May CFA Development Status CAA/CFA Review ESTEC, May 19 th 2011 European Space AgencyAndrea Laruelo.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
INSPIRE drafting teams work versus practical INSPIRE implementations, theory and practice Marek Brylski, Intergraph Polska Enviro-i-Fórum – Zvolen – Slovakia.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
11/12/2009 Beta Prototype. 11/12/2009 TOPICS FOR TODAY Project Schedule o Milestones (Past and Future) o Work hours Beta Design and Architecture o Overview.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Introduction / Context.
19 May 2006 NCSA CIP Status Meeting 1 HDF5/SRB Integration Peter Cao & Mike Folk, NCSA Mike Wan & Reagan Moore, SDSC.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
Project Plan and Schedule Goal: Agree on project plan and schedule.
MAPPS-SCM Software Configuration Management. MAPPS-SCM System Services MAPPS Mission Analysis and Payload Planning System Geometry and Trajectory Simulation.
CAA/CFA Meeting | CFA Team | ESAC | Octiber CFA Under Development CAA/CFA Meeting ESAC, Oct 11 th 2011 European Space AgencyCFA Team.
OVT status Yuri Khotyaintsev Swedish Institute of Space Physics, Uppsala and the OVT team ovt.irfu.se November 18, 2015.
INFSOM-RI WP3: WP3: Software configuration tools and methodologies Status Report ETICS All-Hands – 23 May 2007 E. Ronchieri.
8 th Cross-Calibration Workshop, Kinsale, Ireland, October 20081/14 Draft Replies and Actions to the Recommendations of the Review Panel for Final.
Firm SCALE Mid-term Report. What happened in the past 2 weeks Improved landing page design & code Better front-end visualization with chart feature More.
Distributed Software Development Link Analysis Tool Project Plan Adrien Olivier Dominik Rojković Hassan Aziz Khan Petar Butković.
Project and Project Formulation and Management
RSOC Overview at SWT #26, 11/12 June 2009
Status Report of EDI on the CAA
CSA Implementation overview since OR-8 Test campaigns Scheduled development plan Arnaud Masson CSA/CAA Operational Review 9 ESTEC, 04-June-2014.
20th CAA/DAA Cross Calibration Meeting
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
2nd EIONET NRC workshop on Industrial Pollution
Presentation transcript:

Beatriz Martinez - SAT CFA Team 2 nd CFA Implementation Review ESAC, Madrid, 06 Jun 2013 CLUSTER FINAL ARCHIVE (CFA) Future developments

CFA future developments | Beatriz Martinez | ESAC | 06 Jun 2013 | Pag. 2 CURRENT SCHEDULE –From June 2012 till July 2013 –Current status: on- schedule –CFA 1.0 Public Release: 25/07/2013

THE PRESENT  CFA implementation: CFA 0.8.beta released on 17/05/2013 On-going development of CFA 0.9.beta version CFA future developments | Beatriz Martinez | ESAC | 06 Jun 2013 | Pag. 3  Generation of pre-generated plots: On-going generation with CAA scripts (≈ 3.6 TB in 3 months)  CAA-CFA transfer: Bulk finished. Currently, regular transfers All files received until the moment have been ingested (processed)

CFA future developments | Beatriz Martinez | ESAC | 06 Jun 2013 | Pag. 4 NEXT TASKS IN SCHEDULE Pre-generated plots available Inventory data available Fix issues

OPEN ISSUES Track of issues done with “redmine” 21 open issues 11 bugs 10 features CFA future developments | Beatriz Martinez | ESAC | 06 Jun 2013 | Pag. 5

 Data streaming  Archive and provide access to non-Cluster products (Double-Star, ECLAT, …)  Archive and provide access to Raw data  Improve CFA help and user’s manual  Implementation of a Visualization tool for Quick-look products  Implementation of a Visualization tool for Distribution Functions  On-demand inventory plots  Data mining tool  Improve Graphical Products View Plot several parameters in the same y-axis Provide different default styles of plots Zoom in/out  Scope for further development NEXT DEVELOPMENTS CFA future developments | Beatriz Martinez | ESAC | 06 Jun 2013 | Pag. 6

 Data streaming  Archive and provide access to non-Cluster products (Double-Star, ECLAT, …)  Archive and provide access to Raw data  Improve CFA help and user’s manual  Implementation of a Visualization tool for Quick-look products  Implementation of a Visualization tool for Distribution Functions  On-demand inventory plots  Data mining tool  Improve Graphical Products View Plot several parameters in the same y-axis Provide different default styles of plots Zoom in/out  Scope for further development INMEDIATE DEVELOPMENTS CFA future developments | Beatriz Martinez | ESAC | 06 Jun 2013 | Pag. 7

THANK YOU Beatriz Martinez, SAT CFA Team CFA future developments