H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation Organization Global Air Navigation System ~Interoperability.

Slides:



Advertisements
Similar presentations
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Advertisements

Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
UNITED NATIONS Shipment Details Report – January 2006.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
SIP/2012/ASBU/Nairobi-WP/19
ICAO AVIATION SAFETY PROGRAMMES
Global ATM Operational Concept
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Regional RAIM Prediction System – Progress Report
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
An Airline Perspective on the implementation of new systems SEMINAR ON THE IMPLEMENTATION OF DATALINK AND SATCOM COMMUNICATIONS Bangkok Thailand,
PLANNING FOR A GLOBAL ATM SYSTEM
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
Introduction to Navigation Specifications
System of Systems (DRAFT) To be approved by the ICAO Council
Create an Application Title 1A - Adult Chapter 3.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Regional Preparatory Workshop for the ITU WRC-2015
International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Technology Roadmaps H. Sudarshan
ICAO Aviation System Block Upgrade Executive Briefing:
Global Air Navigation System ~ Planning Mechanisms ~ H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation.
Economic Assessment H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation Organization Workshop on the development.
Mission Trajectory Step 1 From planning to deployment.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
49 th Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, India, 8-12 October Presented by the International.
Civil Military Cooperation in ATM
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Workshop on preparations for ANConf/12 − ASBU methodology
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Analyzing Genes and Genomes
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
PSSA Preparation.
Essential Cell Biology
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Traffic Management and FUA integration
Pan regional ICD for AIDC structure and status (SP/09)
Military Use of Data Link Phil Platt ATN2001, IEE, London
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Aviation Considerations for Multi-Constellation GNSS Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) December 2008 Federal Aviation Administration.
User Requirements for GNSS Interoperability at Global, Regional, National and Local Scales Matt Higgins Co-Chair of Working Group D of the International.
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
AMHS WORKSHOP POLICY & DOCUMENTATION. AMHS WORKSHOP POLICY & DOCUMENTATION  Operational Requirements for facilities or services are established through.
International Civil Aviation Organization Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan SIP/2012/ASBU/Nairobi -WP/7 Workshop.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
September 2003 ATN Middle East Airlines CNS Developments in the Middle East Captain Ousama Balaa, Head of Technical Department Middle East Airlines.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Global Air Navigation System ~ Planning Mechanisms ~
SIP/2012/ASBU/Nairobi-WP/7
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Global ATM Operational Concept
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
ANConf/12 – Agenda H. Sudarshan
Presentation transcript:

H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation Organization Global Air Navigation System ~Interoperability and Harmonization ~ NPF/SIP/2011-WP/17 Workshop on the development of National Performance Framework for Air Navigation Systems (Nadi, Fiji, 28 March-1 April 2011)

2 Presentation Outline  Vision and dream  Interoperability, Harmonization and Seamlessness  Why do we need harmonization  Approach to Harmonization  Global tasks for interoperability and Harmonization  Examples of Harmonization

3 ATM Community ~ Vision Statement ~  To foster the implementation of an interoperable global air traffic management system for all users during all phases of flight that:  meets agreed levels of safety  provides for optimum economic operations  is environmentally sustainable  meets national security requirements.

4 Dream A single set of avionics for seamlessness across States and regions

5 Reality  Systems are country specific  Stand-alone (high diversity, different protocols)  Lack similar functionalities  No standard interfaces  Thus resulting in set of “island” solutionsset of “island” solutions incoherent ATC systemsincoherent ATC systems

6 Interoperability, harmonization and seamlessness  Interoperability: ability to transfer information or effect functionality across any discontinuity to enable operations  Achieved through common standards, designs and procedures  Harmonization: Accord or agreement for a consistent and orderly implementation of systems/procedures  Achieved through common timing or appropriate tools  Interoperability and harmonization results in seamlessness  Seamlessness is the property that allows transition across any discontinuity

7  Air Navigation systems have  number of operational options RNP, horizontal and vertical separation standardsRNP, horizontal and vertical separation standards  number of technical options data links, GNSS augmentation systemsdata links, GNSS augmentation systems  number of organizational options different service providers ( global, regional, subregional/multinational and national)different service providers ( global, regional, subregional/multinational and national) (1/2) Why do we need harmonization? …

8  Air Navigation systems have  different timings in implementation  different levels of implementation  different methods of financing and cost recovery (2/2) Why do we need harmonization?

9 What to harmonize?  Between ground based air navigation systems and CNS/ATM systems  Operational procedures  Technical systems  Institutional format  Amongst CNS/ATM systems  Operational procedures  Technical systems  Institutional format

10 Harmonization of air navigation systems  Systems approach  ATM  Communications  Navigation  Surveillance  Major traffic flow approach  ATM objectives  ATM requirements for communications, navigation and surveillance Methods

11 Approach to harmonization of air navigation systems Approach to harmonization of air navigation systems A framework Define ANS partner Determine harmonization area for ANS List major traffic flows or Homogeneous ATM area Identify the air navigation infrastructure New systems Current systems Identify interface issues Amongst new systems Between current and new systems Resolve interface issues Align timelines/ apply harmonization tools Take follow-up action to implement harmonized plan Results in harmonized air navigation systems

12 Air navigation systems partners  States  ANS service providers  Subregional groups  Regional groups  Airspace users  International Service providers  Manufacturers

13 Interface areas for air navigation systems  Within the area  State  Subregion  Region  Across the area  Inter-State  Inter-subregion  Inter-region

14 Homogeneous ATM areas and major traffic flows Homogeneous ATM area An airspace with a common ATM interest based on similar characteristics of traffic density, complexity, air navigation infrastructure requirements or other specified considerations, wherein a common detailed plan fosters the implementation of interoperable CNS/ATM systems

15 Homogeneous ATM areas and major traffic flows Major traffic flows Major traffic flow: A concentration of significant volumes of air traffic on the same or proximate flight trajectories. Note: Major traffic flows may cross several homogeneous ATM areas with different characteristics Routing area: A defined area encompassing one or more major traffic flows

16 Selecting homogeneous ATM areas and major traffic flows  Identify major traffic flows  Within a State/Subregion/ Region/interregional  Identify homogeneous ATM area

17 Air navigation systems infrastructure  Present  Take stock of the current inventory of technical systems and operational procedures  New  Take into account what is being planned in terms of technical systems and operational procedures

18 Infrastructure – Current systems Infrastructure – Current systems  Air traffic management  ATS Route structure  Separation standards  Airspace reservation  ATC procedures  Flow management  Communications/navigation/surveillance  Data and voice communications  En-route, approach and landing aids  Primary and secondary radars

19 CommunicationNavigationSurveillance Air Traffic Management Data  VHF  HF  Mode S  Satellite  ATN Voice  VHF  Satellite GNSS  GPS  GLONASS  GALILEO* Augmentation  ABAS  GBAS  SBAS SSR  Modes A/C A/C  Mode S ADS-C  VHF  HF  Satellite ADS-BMULTLATASM  Airspace organization ATS Route structure  Airspace management Flexible use of airspace Flexible use of airspace ATS: Conflict management  Air Traffic Control  RHSM and RVSM  Search and Rescue  Decision support systems ATFM  Demand and capacity balancing  Traffic synchronization *emerging systems Infrastructure – New systems

20 Interface issues  Between current air navigation systems and CNS/ATM systems  Operational procedures  Technical systems  Institutional format  Amongst CNS/ATM systems  Operational procedures  Technical systems  Institutional format

21 Interface issues – between current and new air navigation systems  Operational procedures  Reserved and flexible use of airspace  Non RNP and RNP environment  Non RVSM and RVSM environment  Technical systems  ACARS and VDL air/ground data communications  Analog and digital voice communications  Ground-based and satellite-based navigation aids  Different geodetic reference systems  Radar and ADS-C/ADS-B

22 Interface issues – amongst CNS/ATM systems  Different air/ground data links (HFDL, AMSS, SSR Mode S and VDL Modes 2, 3 & 4)  Different GNSS augmentation systems (ABAS, SBAS and GBAS )  Different satellite constellations (GPS, GLONASS and *Galileo)  Different surveillance systems (primary radars, secondary radars, ADS-C, ADS-B and MULTILAT) * Emerging systems Communications/Navigation/Surveillance

23 Interface issues – amongst CNS/ATM systems  Operational procedures  Different RNP environments  Different Regional airspace safety performance monitoring structure  Different operational approvals for RNP  ??? Air traffic management

24 Resolution of interface issues Mechanism LEVELMECHANISM NationalStates Subregional Subregional Groups Regional Planning & Implementation Regional Groups Interregional/ Global Interregional interface meetings and ALLPIRG

25 Application of interface tools Application of interface tools  Align implementation timelines  Apply harmonization tools  VHF data analog/digital: Message processor/dual stack  VHF voice analog/digital: Multi-mode radio  ILS/MLS/GNSS: Multi-mode receiver  PSR/SSR Mode S/ ADS-C and ADS-B: Integrated ATC work station  ATC procedures to respond to different requirements Between current and new air navigation systems

26 Application of interface tools Amongst CNS/ATM systems Application of interface tools Amongst CNS/ATM systems  Align implementation timelines  Apply harmonization tools  VHF data/AMSS/HF/SSR Mode S: ATN  GPS/GLONASS/*GALILEO: integrated GNSS receiver  WAAS/EGNOS/MSAS/GAGAN:Interoperability SARPs  ABAS/SBAS/GBAS: integrated GNSS receiver  SSR Mode S/ ADS-A/ADS-B/MULTILAT: Integrated ATC work station  ATC Procedures to respond different requirements * Emerging systems

27 Follow-up tasks  Decide on the new timeframe as a consequence of aligning the implementation timelines  Plan for implementing the appropriate harmonization tools  Incorporate the relevant changes in the regional air navigation plan (ANP)

28 Interoperability and Harmonization of air navigation systems  Seamlessness  Cost-effectiveness  Easy migration path  Enhanced safety Benefits Resulting in an integrated global air traffic management system global air traffic management system

29 Issue Current Status Additional guidance material on the RNP operational approvals process for each RNP types is required Guidance on the RNP 10/RNP 4 approval process has been provided. Development of guidance material for other RNP approval is in progress Provisions and guidance material for annotation of RNP requirements on aeronautical charts Development completed and released by ICAO as an amendment to chart manual Interoperability and Harmonization issues being addressed by ICAO … (1/5)

30 Issue Current Status Combined GNSS receiver to integrate signals from different constellations SARPs for combined GPS/GLONASS receiver have been developed; Issues associated with combined use of GPS and Galileo are under consideration by the NSP of ICAO Harmonization of different satellite-based augmentation systems for GNSS (WAAS/EGNOS/MSAS/ GAGAN) SARPs for SBAS have been developed; SBAS interface issues are being addressed by NSP of ICAO and the Interoperability Working Group, which is comprised of SBAS service providers. (2/5) Interoperability and Harmonization issues being addressed by ICAO …

31 Issue Current Status ATS route planning and implementation between regions Being addressed as part of the work programme of interregional coordination meetings by ICAO Regional offices and PIRGs Harmonization of procedures for transition from RVSM levels to non ‑ RVSM levels (3/5) Interoperability and Harmonization issues being addressed by ICAO …

32 Issue Current Status Progressive implementation of ATN islands, domains and backbones and their interconnections Guidance material has been developed; Being addressed by the interregional coordination meetings by ICAO Regional offices and PIRGs Multi-mode receiver (MMR) for integrating ILS/MLS/GNSS MMR specifications have been finalized; The equipage is presently under development by the Industry (4/5) Interoperability and Harmonization issues being addressed by ICAO …

33 Issue Current Status Availability of ANP/FASID documents of all the regions Transition to eANP is under progress and to be completed by January 2013 Application of BORPC for all the regions A common BORPC is now applicable to all regions. This is being revised and new BORPC will be released in June (5/5) Interoperability and Harmonization issues being addressed by ICAO

34 Examples of harmonization in implementation of air navigation systems  Revision of interregional ATS Trunk Route Structure covering Europe/ Middle East/Asia Task was coordinated amongst three regions Task was coordinated amongst three regions Implemented Implemented  Implementation of RVSM on interregional Major Traffic Flow from Asia to Europe through Middle East Task was coordinated amongst three regions Task was coordinated amongst three regions Implemented Implemented Interregional approach (1/2)

35  Implementation of RVSM on interregional Major Traffic Flow from South America to Europe through Africa Task is coordinated amongst three regionsTask is coordinated amongst three regions ImplementedImplemented  Implementation of RVSM on interregional Major Traffic Flow from South America through Caribbean to North America Task is coordinated amongst three regionsTask is coordinated amongst three regions ImplementedImplemented (2/2) Examples of harmonization in implementation of air navigation systems Interregional approach

36 Interregional harmonization

37  Implementation of RNP5/RNAV in Middle East region on selected routes  Task was coordinated amongst States of the Region  Already implemented  Implementation of AMHS in Asia/Pacific Region  Task is being coordinated amongst States of the Region  Implementation is ongoing Regional approach Examples of harmonization in implementation of air navigation systems

38  Implementation of Ground - Ground communications network in SADC/ Central Caribbean subregion.  Task was coordinated amongst the States of subregion using subregional approach  Already implemented  Implementation of RNP5/RNAV in ECAC area  Task was coordinated amongst the States of subregion using subregional approach  Already implemented Subregional approach Examples of harmonization in implementation of air navigation systems

39 SUMMARY  Understood the concept of Interoperability, Harmonization and seamlessness  Recognized the need for harmonization  Discussed a framework for harmonization including tools  Noted the work of ICAO in progress to enhance Interoperability and Harmonization  Acknowledged the success stories of harmonization carried out by regions/subregional groups

— END —