Page 1 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Ocean geophysical results from ASAR  Geophysical overview  ocean spectra : the isidore case.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
2. The WAM Model: Solves energy balance equation, including Snonlin
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Multiplication Tile Facts Multiplication Tile Facts Rectangular next © 2009 Richard A. Medeiros.
ABC Technology Project
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Analyze the information brought by the polarization diversity (HH-VV-HV for ASAR, full-polarimetric for airborne radar) for wind and wave studies Validate.
Page 1 ASAR Validation Workshop - ESRIN – December 2002 Preliminary Performance of the ASAR Wave Level WVS and WVW Product Frank Melger ARGOSS.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
1..
Do you have the Maths Factor?. Maths Can you beat this term’s Maths Challenge?
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 Verification of wave forecast models Martin Holt Jim Gunson Damian Holmes-Bell.
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
Immunobiology: The Immune System in Health & Disease Sixth Edition
CpSc 3220 Designing a Database
Traktor- og motorlære Kapitel 1 1 Kopiering forbudt.
Presentation transcript:

Page 1 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Ocean geophysical results from ASAR  Geophysical overview  ocean spectra : the isidore case  inversion on single look complex images  prospective studies : doppler anomaly  conclusions

Page 2 ASAR Validatoin Review - ESRIN – 9-13 December 2002 annual swell index annual significant wave height

Page 3 ASAR Validatoin Review - ESRIN – 9-13 December 2002 swell index for autumn season

Page 4 ASAR Validatoin Review - ESRIN – 9-13 December 2002

Page 5 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Imagette visualisation

Page 6 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Imagette spectrum visualisation

Page 7 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Sar inversion (esa algorithm)

Page 8 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Collocated WAM spectrum

Page 9 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Hurricane isidore from NOAA Sept 23 ASAR/MERIS Sept 21

Page 10 ASAR Validatoin Review - ESRIN – 9-13 December 2002 ASAR Wave Mode, Level 2 algorithm

Page 11 ASAR Validatoin Review - ESRIN – 9-13 December 2002 ASAR intensity image during Valparaiso experiment (cetp) oct 26

Page 12 ASAR Validatoin Review - ESRIN – 9-13 December 2002

Page 13 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Sigma 0 ECMWF (dB) calibration constant : dB based on september data Imagette mean intensity (dB)

Page 14 ASAR Validatoin Review - ESRIN – 9-13 December 2002 doppler centroid anomaly Two different tracks

Page 15 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Doppler centroid anomaly on Wave mode level1b (descending tracks)

Page 16 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Doppler centroid anomaly (ascending tracks)

Page 17 ASAR Validatoin Review - ESRIN – 9-13 December 2002 ASAR intensity image during Valparaiso experiment (cetp) oct 26

Page 18 ASAR Validatoin Review - ESRIN – 9-13 December 2002 (triggered by a doppler-map case study from Andrea Monti-Guarnieri in 2000) Doppler anomaly map some block processing issues !

Page 19 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Doppler centoid (Hz) Land Ocean

Page 20 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Comparison with a similar ERS 2 SLC image doppler centroid analysis

Page 21 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Doppler estimated on range compressed data saturation on rapidly changing backscatter area !

Page 22 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Doppler estimated on range and azimuth compressed data Wind

Page 23 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Doppler anomaly chart

Page 24 ASAR Validatoin Review - ESRIN – 9-13 December 2002

Page 25 ASAR Validatoin Review - ESRIN – 9-13 December 2002 CONCLUSION overall very excellent quality of asar data need for another 3 month validation with buoys and model for level 2 doppler anomaly estimation require precise orbit and attitude monitoring