International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Global ATM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Traffic Management and FUA integration
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Continuous Climb Operations (CCO) Saulo Da Silva
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-102 Increased Effectiveness of Ground-Based Safety Nets SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Collaborative Decision Making (CDM) Saulo Da Silva
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Global ATM Operational Concept
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Trajectory-Based Operations(TBO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories SIP/ASBU/2012 -WP/24 A Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi, May 2012)

2 Module N° B0-10 Improved Operations through Enhanced En-Route Trajectories ICAO SIP ASBU Workshop Summary To allow the use of airspace which would otherwise be segregated (i.e. military airspace) along with flexible routing (Enroute-PBN) adjusted for specific traffic patterns. This will allow greater routing possibilities, reducing potential congestion on trunk routes and busy crossing points, resulting in reduced flight length and fuel burn. Main Performance Impact -KPA01 Access & Equity -KPA02 Capacity -KPA04 Efficiency -KPA05 Environment -KPA06 Flexibility -KPA09 Predictability Operating Environment/Phases of Flight En-route, TMA Applicability Considerations en-route airspace.The larger the size of the concerned airspace the greater the benefits, in particular for flextrack aspects. Benefits accrue to individual flights and flows. Application will naturally span over a long period as traffic develops. Its features can be introduced starting with the simplest ones. Global Concept Component(s) AOM – Airspace Organisation & Management AUO– Airspace Users Operations DCB – Demand-Capacity Balancing Global Plan Initiatives GPI-1 Flexible use of airspace GPI-4 Align upper airspace classifications GPI-7 Dynamic and Flexible Management GPI-8 Collaborative airspace design and management Global Readiness Checklist Status Standards ReadinessReady Avionics AvailabilityReady Ground Systems AvailabilityReady Procedures AvailableReady

3 Varies from States and regions – Airspace organizations and management – limited use of RNAV – Aligning upper airspace classifications – Rigid allocation of airspace between civil and military authorities Integration of civil and military ATC has been a way to eliminate some of the issues. Airspace classification (Not included in the module but mapped to this Module) ICAO SIP ASBU Workshop Module N° B Baseline

4 Element 1  Airspace Planning – Activities to organise and manage airspace prior to the time of flight – Includes CDM applications for En-Route Airspace Element 2  FUA: Flexible Use of Airspace – Airspace should not be designated as either purely civil or purely military airspace, but should be considered as one continuum in which all users’ requirements are accommodated to the maximum extent possible. Element 3  Flexible Routing (Enroute-PBN) – Design of routes (or tracks) to match the traffic pattern and other variable factors such as weather- RNP 2/ Advance RNP – When already in place, flex tracks systems can be improved in line with the new capabilities of ATM and aircraft, such as PBN and ADS. – A current application of the element is DARPS, Dynamic Air route Planning System, used in the Pacific Region ICAO SIP ASBU Workshop Module N° B0-10 – Change Brought by the Module

5ICAO SIP ASBU Workshop Module N° B0-10 – Intended Performance Operational Improvement Access and EquityBetter access to airspace by a reduction of the permanently segregated volumes. CapacityThe FUA gives greater possibilities to separate flights horizontally. PBN helps to reduce route spacing and aircraft separations. This in turn allows reducing controller workload by flight. EfficiencyIn particular the module will reduce flight length and related fuel burn and emissions. The potential savings are a significant proportion of the ATM related inefficiencies. The module will reduce the number of flight diversions and cancellations. EnvironmentFuel burn and emissions will be reduced; FlexibilityThe various tactical functions allow to react rapidly to changing conditions. PredictabilityImproved planning allows stakeholders to anticipate on expected situations and be better prepared. CBAThe ground costs are lower than the benefits to airspace users.

6 Element 1  Airspace Planning – Required procedures exist for the main. They may need to be complemented by local practical guidance and processes – The airspace requirements (RNAV, RNP and the value of the performance required) may require new ATS procedures and ground system functionalities Element 2  FUA: Flexible Use of Airspace – The ICAO Circular 330 AN/189 Civil/Military Cooperation in Air Traffic Management offers guidance and examples of successful practices of Civil and Military Cooperation Element 3  Flexible Routing (enroute PBN) – A number of operational issues and requirements will need to be addressed to enable harmonized deployment of Flex Route operations in a given area such as: Some adaptation of Letters of Agreement; Revised procedures to consider the possibility of transfer of control at other than published fixes; Review of controller manuals and current operating practices Specific communication and navigation requirements ICAO SIP ASBU Workshop Module N° B0-10 – Necessary Procedures (Air & Ground)

7 Avionics – Deployment of PBN is ongoing; Enhanced flight planning systems (FPS) available today – Flight dispatchers must ensure the applicability of Overflight permissions for the over flown countries Ground Systems – Technology is available. Even CDM can be supported by a form of internet portal. – Basic FUA concept can be implemented with the existing technology. For more advanced use of conditional routes, a robust collaborative decision system is required. – ANSPs evaluate their FDPS to determine what, if any, modifications will be required to accommodate the implementation of Flex Route operations ICAO SIP ASBU Workshop Module N° B0-10 – Necessary System Capability

8 The required training is available and the change step is achievable from a human factors perspective. Training in the operational standards and procedures are required for this Module. Likewise, the qualifications requirements are identified in the regulatory requirements ICAO SIP ASBU Workshop Module N° B0-10 – Training and Qualification Requirements

9 Element 1  Airspace Planning – ICAO material is available Element 2  FUA: Flexible Use of Airspace – Until today, the Chicago Convention in its Article 3 expressly excludes the consideration of State aircraft from the scope of applicability – ICAO provisions related to coordination between civil and military in support to the Flexile Use of Airspace can be found in several Annexes, PANS and Manuals Element 3  Flexible Routing – LoA/LoCs: Letters of agreement (LoA) and/or letters of coordination (LoC) might be required to reflect the specificities of Flex Route operations. Local hand-off procedures, timings and frequency allocations must be clearly detailed Approval Plans: To Be Determined, based upon regional applications. Possible regional mandates of PBN should be considered. ICAO SIP ASBU Workshop Module N° B0-10 – Regulatory /Standardization needs and Approval Plan (Air & Ground)

10 Standards – ICAO Doc 4444, Procedures for Air Navigation Services — Air Traffic Management, Chapter 5 Procedures: Nil Guidance Material – ICAO Doc 9426, Air Traffic Services Planning Manual; – ICAO Doc 9554, Manual Concerning Safety Measures Relating to Military Activities Potentially Hazardous to Civil Aircraft Operations; – ICAO Doc 9613, Performance-based Navigation (PBN) Manual; – ICAO Doc 9689, Manual on Airspace Planning Methodology for the Determination of Separation Minima; – ICAO Global Collaborative Decision Making (CDM) Guidelines (under development); – ICAO Circular 330 AN/189, Civil/Military Cooperation in Air Traffic Management. Approval Documents – ICAO Doc 9426, Air Traffic Services Planning Manual; – ICAO Doc 9689, Manual on Airspace Planning Methodology for the Determination of Separation Minima; – ICAO Doc 9613, Performance-based Navigation (PBN) Manual; – ICAO Doc 9554, Manual Concerning Safety Measures Relating to Military Activities Potentially Hazardous to Civil Aircraft Operations; – ICAO Global Collaborative Decision Making (CDM) Guidelines (under development) – ICAO Circular 330 AN/189 Civil/Military Cooperation in Air Traffic Management ICAO SIP ASBU Workshop Module N° B0-10 – Reference Documents

11 Improved Operations through Enhanced En- Route Trajectories Benefits: Access, Capacity, Efficiency, Environment Flexibility and Predictability Elements: – Airspace classification (not included in the Module) – Airspace planning and application of CDM for En-Route Airspace; – Flexible use of airspace, improve civil/Military coordination and determine conditional routes – Flexible routing –Enroute PBN (RNP2/Advance RNP)/DARPs To be reflected in ANRF ICAO SIP ASBU Workshop Module N° B0-10 Implementation - Benefits and Elements

12ICAO SIP ASBU Workshop