Data processing and quality control activities in support to the MIPAS mission F. Niro (1), T. Fehr (2) (1) Serco SpA, ; (2) ESA/ESRIN,

Slides:



Advertisements
Similar presentations
KNMI Ozone Satellite Observations
Advertisements

Future Directions and Initiatives in the Use of Remote Sensing for Water Quality.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
Data processing and quality control activities in support to the GOMOS mission F. Niro (1), D. Del Cavallo (1), G. Barrot (2), T. Fehr (3) (1) Serco SpA,
EGU 2009 Vienna 19 – 24 Apr 2009 Ice on IR sensors: MIPAS case Ice contamination on satellite IR sensors: the MIPAS case F. Niro (1), T. Fehr (2), A. Kleinert.
MIPAS Quality assessment of ENVISAT Atmospheric mission: implication for the scientific user community The monthly reports for each instrument.
RA-2 S-BAND ANOMALY: DETECTION AND WAVEFORMS RECONSTRUCTION A. MARTINI (1), P. FEMENIAS RA-2 S-BAND ANOMALY: DETECTION AND WAVEFORMS RECONSTRUCTION A.
Page1 SCIAMACHY Calibration Review – ESTEC – Sept 2002 SCIAMACHY Tangent Height Verification H.Bovensmann University of Bremen Institute of Remote.
Time & Frequency Products R. Peřestý, J. Kraus, SWRM 4 th Data Quality Workshop 2-5 December 2014 GFZ Potsdam Recent results on ACC Data Processing 1 SWARM.
SABER Instrument Performance and Measurement Requirements.
Lecture # 2 : Process Models
SCILOV-10 Validation of SCIAMACHY limb operational BrO product F. Azam, K. Weigel, A. Rozanov, M. Weber, H. Bovensmann and J. P. Burrows ESA/ESRIN, Frascati,
1.STSE 2.Objectives of today 3.Data availability 4.Reprocessing 5.RFI 6.Conferences & user meetings Introduction – SMOS mission status.
Page 1 MIPAS QWG #15, ESRIN, 23-25/01/08 Bianca Maria Dinelli Istituto di Scienze dell'Atmosfera e del Clima CNR (Italy) Enzo Papandrea Massimo Carlotti.
Full Resolution – Reduced Resolution differences E. Papandrea, M. Carlotti, M. Ridolfi, E. Arnone DCFI, University of Bologna, Italy B.M. Dinelli ISAC-CNR,
Microwindow Selection for the MIPAS Reduced Resolution Mode INTRODUCTION Microwindows are the small subsets of the complete MIPAS spectrum which are used.
High Altitude Equatorial Clouds as Seen with the OSIRIS InfraRed Imager A.E. Bourassa, D.A. Degenstein, N.D. Lloyd and E.J. Llewellyn Institute of Space.
Page 1 ENVISAT Symposium – Salzburg - Austria 6-10 September 2004 GEO-MTR: A 2-Dimensional Multi Target Retrieval System for MIPAS/ENVISAT Observations.
Chiara Piccolo and Anu Dudhia Atmospheric, Oceanic and Planetary Physics, Department of Physics, Oxford University, Oxford, UK Predicted.
Page 1 Reduced Resolution Retrievals from MIPAS / MORSE and Oxford Level 2 Monitoring Alastair Burgess and Anu Dudhia Atmospheric, Oceanic and Planetary.
Atmospheric, Oceanic & Planetary Physics, University of Oxford QWG-11, October 2006, Bologna Chiara Piccolo and Anu Dudhia Precision Validation.
Analysis of D Band Cloud Flag Jane Hurley Anu Dudhia Graham Ewen University of Oxford.
Atmospheric, Oceanic & Planetary Physics, University of Oxford A Dudhia MIPAS QWG16 Venice Apr 2008 Page 1 Recent MIPAS L2 Data Retrieved at Oxford.
Xin Kong, Lizzie Noyes, Gary Corlett, John Remedios, Simon Good and David Llewellyn-Jones Earth Observation Science, Space Research Centre, University.
Page 1 ENVISAT SYMPOSIUM - Montreux – 23/27 April 2007 Page 1 Stratospheric Distribution of CO 2 from the MIPAS High-resolution Full Mission Bianca Maria.
Cloud Top Height Retrieval From MIPAS Jane Hurley, Anu Dudhia, Graham Ewen, Don Grainger Atmospheric, Oceanic and Planetary Physics, University of Oxford.
Plans for interim data release J E Russell (Imperial)
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
N By: Md Rezaul Huda Reza n
© Grant Thornton | | | | | Guidance on Monitoring Internal Control Systems COSO Monitoring Project Update FEI - CFIT Meeting September 25, 2008.
Atmospheric Science Conference, ESA-ESRIN, 2006 Spatial and temporal distributions of water vapour in the UTLS as observed with MIPAS/Envisat M.Milz for.
® Kick off meeting. February 17th, 2011 QUAlity aware VIsualisation for the Global Earth Observation system of systems GEOVIQUA workshop February, the.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
25 June 2009 Dawn Conway, AMSR-E TLSCF Lead Software Engineer AMSR-E Team Leader Science Computing Facility.
Page 1ENVISAT Validation Review / GOMOS session - ESRIN – 13th December 2002 ENVISAT VALIDATION WORKSHOP GOMOS Recommendations by the ESL team : Service.
Overview of CEOS Virtual Constellations Andrew Mitchell NASA CEOS SIT Team / WGISS NASA ESRIN – Frascati, Italy September 20, 2013 GEOSS Vision and Architecture.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
Florian Nichitiu a,*, James R. Drummond a, Jiansheng Zou a, Robert Deschambault b a) Department of Physics, University of Toronto, Canada,60 St. George.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
INSTRUMENT STATUS AND PERFORMANCE Guido Levrini. Page 2 ENVISAT Validation Workshop - ESRIN - 9–13 December 2002 ASAR F Instrument operability issues.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Science instruments data pipeline G. Martucci.
Page 1 Validation Workshop, 9-13 th December 2002, ESRIN ENVISAT Validation Workshop AATSR Report Marianne Edwards Space Research Centre Department of.
Sciavalig – 6-8/12/2004 Status of the Atmospheric Chemistry Instruments onboard Envisat SCIAVALIG 6–8 December 2004 Rob Koopman Angelika Dehn Lidia Saavedra.
Introduction GOES-R ABI will be the first GOES imaging instrument providing observations in both the visible and the near infrared spectral bands. Therefore.
Recent Solar Irradiance Data From SBUV/2 and OMI Matthew DeLand and Sergey Marchenko Science Systems and Applications, Inc. (SSAI) SOLID WP-2 Workshop.
C H A M P International Laser Ranging Service - General Assembly, October 2005 Eastbourne, UK L. Grunwaldt, R. Schmidt, D. König, R. König, F.-H. Massmann.
MODIS Preprocessing (before L1B) Changes over the Last Year (and looking forward) Chris Moeller and others CIMSS; Univ. Wisconsin July 13, 2004 Thanks.
Ozone PEATE 2/20/20161 OMPS LP Release 2 - Status Matt DeLand (for the PEATE team) SSAI 5 December 2013.
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First level 1b Leakage current analysis.
Nine Years of Atmospheric Remote Sensing with SCIAMACHY – Instrument Performance Gottwald, Krieg, Lichtenberg, Slijkhuis – DLR-IMF Noël, Bramstedt, Bovensmann,
SCM x330 Ocean Discovery through Technology Area F GE.
Institut für Umweltphysik/Fernerkundung Physik/Elektrotechnik Fachbereich 1 Status of SQWG activities H. Bovensmann, G. Lichtenberg, R. Snel, C. Lerot,
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
1 Creating Situational Awareness with Data Trending and Monitoring Zhenping Li, J.P. Douglas, and Ken. Mitchell Arctic Slope Technical Services.
Research and Service Support Resources for EO data exploitation RSS Team, ESRIN, 23/01/2013 Requirements for a Federated Infrastructure.
ESA Climate Change Initiative Sea-level-CCI project A.Cazenave (Science Leader), G.Larnicol /Y.Faugere(Project Leader), M.Ablain (EO) MARCDAT-III meeting.
GOMOS Mission and Processing Status On 22nd March 2003 GOMOS suffered the anomaly ‘Azimuth Voice coil command saturation”. The anomaly occurred during.
JMA GPRC report Arata OKUYAMA Meteorological Satellite Center,
Validation status overivew
Validation status overivew
Dehn(1), F. Niro(1), A. von Bargen(2), T. Fehr(3)
MIPAS Monitoring at Oxford
Status of ACVE-3/pre-validation recommendationss 21. 6
in-orbit operations and achievements
MODIS Characterization and Support Team Presented By Truman Wilson
“Brief” update on ACE water vapour
“SMILES” aboard the ISS-JEM “KIBO”
Combination Approaches
Dorothee Coppens.
MIPAS-2D water database and its validation
Presentation transcript:

Data processing and quality control activities in support to the MIPAS mission F. Niro (1), T. Fehr (2) (1) Serco SpA, ; (2) ESA/ESRIN, Mission and processing status Monitoring activities DPQC activities Abstract The DPQC is a consortium of specialized companies collecting engineering and scientific expertise all over Europe. The DPQC role is to provide on behalf of ESA the service of instrument and product monitoring and processor implementation for the ENVISAT and ERS mission. While performing these tasks the DPQC interacts with ESA as well as with the industry and the science user community. Whenever an anomaly is detected during the quality check an investigation is started by involving all the necessary expertise. The outcome of the investigation is a remedy that could imply a workaround solution or a re-processing instance; in some cases the solution could drive the evolution of the processor baseline and/or the review of the calibration and validation plan. The final outputs of the DPQC service are the daily and monthly reports that are delivered to the science user community. Furthermore the DPQC contributes to workshop and meetings in support to the mission. A flowchart showing the activities performed by the DPQC and the main entities involved in the anomaly handling process is shown on fig.1. The original FR MIPAS mission was suspended on March 2004 due to increase of IDU error. The “new” RR mission started routinely on Jan 2005 with:  Spectral resolution reduced to 41% of the original  Reduced duty cycle (30 – 50%)  Over-sampling of the vertical domain  Latitude dependent tangent altitude The following operational products are generated on the ground segments from MIPAS measurements:  level 0: instrument source packets and telemetry data  level 1: geo-located and fully calibrated spectra  level 2: profiles of pT, O 3, H 2 O, CH 4, NO 2, N 2 O and HNO 3 The quality check provided by the DPQC is extended to all product levels. The main quality indicators in the MIPAS products are in tab. 2. The QUADAS tool is used to extract the quality information parameters from the products and to generate a wide variety of plots and tables. Final outputs of QUADAS are html reports but also a database that can be used for long term analysis. Monitoring configuration QUADAS reports are inspected daily by the DPQC in order to detect anomalies in the Flight or Ground Segment. The level 0 daily monitoring provides a first check of the operational processing performance, since it allows detection of anomalies in the acquisition or transmission of the instrument source packets. Furthermore the level 0 monitoring is important for monitoring the instrument behavior, especially devices temperatures and cooler performances as well as ADC counts. The monitoring of MIPAS L1b products allows the quality check of the spectra and the verification of the spectral and radiometric calibration. Indeed many anomalies in the level 2 retrieval are due to an incorrect spectral calibration. With the level 2 monitoring the scientific validity of the geophysical profiles can be checked, in particular concerning any problem in the operational retrieval. Furthermore the L2 products quality check is also an interesting mean to detect on a short term basis the status of the Earth’s atmosphere. In addition to the daily monitoring which is aimed at the quick detection of instrument and products anomaly a systematic long term analysis is carried out on a monthly basis and a report is delivered to the user community. The MR is issued with the support of the QWG, the report contains information about:  Mission status and instrument planning  Processing Status and Configuration on the Ground Segments  Products quality monitoring and long term analysis  Anomaly reporting and investigation The main results of the MIPAS MR are the long term analysis of the instrument status and performances, the long term trend of the gain and spectral calibration and the mispointing evolution. The analysis of significant instrument parameters on a long term basis is important in order to study long term trend or seasonal variation and for detecting instrument ageing. A few examples of monitoring results contained in the MR are presented in the figs. 5 – 7. In fig. 5 the mispointing over the full mission is plotted. We can observe that after the correction of the on-board s/w problem (Dec 2003) the mispointing remains stable around a value of -30 mdeg. In fig. 6 the variation of the gain factor since Jan 2005 is shown. The slope of this curve is a measure of the detector ice contamination. In this plot the improvement observed in the last months can be appreciated. It was due to the fact that more frequent decontaminations are performed. The importance of the gain monitoring is demonstrated in fig.7. In this plot we can see that the gain and NESR variation in band A are strongly correlated. Therefore a gain increase significantly affects the retrieval precision of the L2 products. In addition to the routine monitoring activities, ad-hoc analysis are carried out by the DPQC in order to solve instrument or processing anomalies and to improve the monitoring efficiency. An example of anomaly investigation is shown in fig.8. In this figure the monthly occurrence of a corruption in the band D from Jul to Nov 2006 is shown using geo-located maps. We can see that the anomaly occurred always on the South Hemisphere, at low altitude and it moves towards the South Pole when approaching the Antarctic Summer. The investigation has shown that the problem was due to solar light backscattered into the MIPAS FOV by low altitude clouds. The quality monitoring is a dynamic process that evolves in order to meet instrument performances evolution and to improve efficiency of anomaly detection. In this frame new analysis or plots could be added to the routine check. An example is given in fig. 9 where the spikes monitoring in channel D is presented. This plot clearly shows the high density of spikes over the SAA region. After discussion within the QWG this analysis will be added to the MR. Data quality disclaimers provide information on known deficiencies in processing, they are available at: Daily/monthly reports can be accessed at: The unavailability intervals of the MIPAS instrument are available on line For any questions on MIPAS, please contact ESA’s EO Helpdesk Source of information The quick detection of all instrument and product anomalies is crucial for instrument safety, as well as for optimizing the quality of the products before delivery to the users. Furthermore the investigation on the detected anomaly could drive the development of the operational processor and could help to optimize the instrument operations and the calibration plan. In fact the quality control is a dynamic process that evolves in order to satisfy the new requirements coming out during the mission. In this paper we will address the quality control measures focusing on the MIPAS mission. The mission and processing status and the monitoring baseline and evolution will be outlined; furthermore the implications of these activities for the scientific user community will be underlined. The objective of this paper is to highlight the importance of the satellite instrument and products monitoring and to show the implication of this task for the scientific user community. The MIPAS processing status is summarized hereafter:  The last processor used in NRT was the IPF  IPF 4.61 and 4.62 were used for reprocessing the FR mission.  IPF 4.65 and 4.67 were used to process RR data up to L1.  The only processor able to generate L2 data of the RR mission will be the 5.0 that will be put into operation by the end of  IPF 5.0 will also be used for reprocessing the whole mission.  The IPF versions and their validity are shown in fig.2. Fig. 1 – Flowchart showing the DPQC anomaly handling process. Validation Dataset Status Fig. 3 – Cloud top height map for 13 July Fig. 9 – Density of detected spikes on channel D during Dec 2006 Fig. 8 – Occurrence of corruption in band D from Jul to Nov Daily monitoring Before starting the IPF 5.0 implementation a set of specific orbits was selected by the validation teams. These data were chosen in correspondence to collocated remote sensing measurements (e.g. lidar, balloon). These orbits were processed to L1 and L2 using the prototypes with the support of ESL, GRID-Team and DPQC and were made available to the user community. In total 371 level 1 and 140 level 2 products were processed. Thanks to this dataset the validation team will give a first assessment about the accuracy of the new processor and will allow to correct for any undetected systematic error before the IPF 5.0 deployment. Anomaly investigations and monitoring evolution The IDU errors occurrence is decreasing since Feb 2006, as a result the instrument duty cycle was raised in the last month up to 50% and it will be further increased in the future if the instrument performance will keep improving. The actual Ground Segment configuration is depicted in tab.1 where the correspondence of the operational processor (IPF) with the prototype, DPM, ADF and IODD are listed. The current operational processor (4.67) is marked in red, while the upcoming future IPF (5.0) is printed in italic. Example plots of the QUADAS daily report are shown in figures 3 and 4. In fig. 3 the cloud top height map is shown. This is an interesting analysis that allows for checking correctness of radiometric calibration in band A, but it gives also an interesting information about the atmospheric status, for example in the figure the presence of stratospheric clouds during the Antarctic winter is clearly visible. In fig.4 the NO 2 stratospheric distribution is shown, in this plot the white stripes indicate processing failures, on the other hand the typical night/day variation of NO 2 VMR is visible and some anomalous enhanced NO 2 values can be seen on the high stratosphere. Fig. 5 – Long term mispointing variation. Tab. 1 – MIPAS Processing configuration. Tab. 2 – Main quality indicators for MIPAS products. Fig. 4 – NO2 vertical distribution for one day of measurements (18th Aug 2004). Long term monitoring Fig. 7 – Relation between gain and NESR variation for the FR mission. DatasetFieldDescription LEVEL 1B MDSquality_flag “0”, not corrupted; “1”, one or more bands corrupted; “-1”, blank MDSR. LEVEL 1B MDSband_val Band validity PCD: one value per band (A, AB, B, C and D) where “0” = not corrupted, “2” = corrupted due to transmission errors, “4” = corrupted due to observational validation. LEVEL 2 PCD INFORMATION ADS info_strings.pcd_info PCD (Product Confidence Data) information string. Example: Failed to select an occupation matrix for scan 26 Retrieval 0. LEVEL 2 SPHnum_sp_no t_proc Number of elevation scans in nominal mode processed. LEVEL 2 PT/SPECIE RETRIEVAL MDS conv_id ID of convergence : “0” = maximum number of micro-iterations exceeded; “1” = maximum number of macro-iterations exceeded; “2” = convergence reached; “3” = maximum run time exceeded; “4” = retrieval failed. LEVEL 2 PT/SPECIE RETRIEVAL MDS quality_flag Quality indicator (set to -1 if retrieval failed, set to 0 otherwise). IPF PrototypeDPMIODDADF L1 Migsp L2 ml2pp L1L2L1L2L1L L-5A5B Ia4.14E4.04E I4.14E4.04E H4.04E4.04E4.0 NEW MIPAS on ENVISAT Fig. 2 – IPF validity for the different MIPAS mission scenario. NEW Fig. 6 – Gain factor relative variation since Jan The quality of the satellite data can be variable due to several sources of instrument and products degradation due to:  The Space Segment (e.g.: anomaly in the satellite communication, instrument ice contamination)  The Ground Segment (e.g.: anomaly in activation of ADF, operational processor anomalies)