SWFDP – Eastern Africa (pilot phase) Milestones (Planning and Management): Technical-Planning Workshop (Nairobi, Oct 2010) –Agreement that the SWFDP-EA.

Slides:



Advertisements
Similar presentations
RSMC La Réunion activities regarding SWFDP Southern Africa Matthieu Plu (Météo-France, La Réunion), Philippe Arbogast (Météo-France, Toulouse), Nicole.
Advertisements

CLIMATE RISK: REVIEW OF PROGRESS IN SCIENCE AND TECHNOLOGY L.A.OGALLO IGAD CLIMATE AND APPLICATIONS CENTRE (ICPAC) Dept. of.
World Meteorological Organization Working together in weather, climate and water EXPECTED RESULT 1 ENHANCED CAPABILITIES OF MEMBERS TO PRODUCE BETTER WEATHER.
World Meteorological Organization (WMO) Severe Weather Forecasting and Disaster risk reduction Demonstration Project (SWFDDP) Steve Ready WMO RA V SSWS.
MOGREPS-W First-guess Severe Weather Warnings for NSWWS
Severe Weather Forecasting Demonstration Project (SWFDP)
Ensemble Forecasting of High-Impact Weather Richard Swinbank with thanks to various, mainly Met Office, colleagues High-Impact Weather THORPEX follow-on.
Severe Weather Forecasting Demonstration Project (SWFDP)
Current Warning System of India Meteorological Department.
WMO Severe Weather Forecasting Development Project (SWFDP) Ken Mylne Chair DPFS (Data-processing and Forecasting Systems) & Chair SWFDP SG WMO; WDS.
TMA Experience in Implementing CAP and its Role in SWFDP-EA as RFSC for Lake Victoria Basin Hellen Msemo Tanzania Meteorological Agency
Eugene Poolman South African Weather Service Pretoria, South Africa
ECMWF involvement in the DRR/SEE programme Conclusion of co-operation agreements with: The former Yugoslav Republic of Macedonia Bosnia & Herzegovina (agreed.
WMO Status and Plans of the SWFDP – Severe Weather Forecasting Development Project Ken Mylne Chair DPFS (Data-processing and Forecasting Systems) & Chair.
Welcome to the Cloud Nasara!
Challenges and Opportunities Hamza Kabelwa REGIONAL FORECASTING SUPPORT CENTRE, DAR ES SALAAM Washington, USA, June 2013.
© Crown copyright Met Office SWFDP: Met Office support for East Africa Rob Varley – Met Office Operations and Services Director.
Implementing SWFDP in Eastern Africa: What our NMHS need from Regional and Global Centers Michael S.Z Nkalubo PR Uganda Chair EAC Heads of Met. Services.
WMO Severe Weather Forecasting Demonstration Project (SWFDP) and its Future Directions A. Soares Scientific Officer WMO Data-processing and Forecasting.
WMO Severe Weather Forecasting Demonstration Project (SWFDP): a Cross-Cutting Activity involving Multiple TCs and Programmes – What Next? Alice Soares.
SWFDP Synergy with and Contribution to the EAC’s Five-years Meteorological Development Plan and Investment Strategy ( ) By Ruben K. Barakiza Institut.
Status of the implementation SWFDP in South Sudan Submitted by : PAULINO OMOJ OMAY Weather forecast section, South Sudan meteorological service.
African Training Desk National Centers for Environmental Predictions Staff Wassila M. Thiaw, Team Leader Vadlamani Kumar Endalkachew Bekele Visitors from.
NEEDS AND REQUIREMENTS FOR METEOROLOGICAL AND CLIMATE INFORMATION IN SUPPORT TO HUMANITARIAN AGENCIES – SUMMARY OF INITIAL EVALUATION CBS (DPFS/PWS) Task.
Numerical Weather Prediction Models
Regional Models Lake Victoria Model Prepared by C. Tubbs, P. Davies, Met Office UK Revised, delivered by P. Chen, WMO Secretariat SWFDP-Eastern Africa.
Samuel Muchemi Public Weather Services (PWS) programme, WMO
Richard (Rick) Jones SWFDP Training Workshop on Severe Weather Forecasting Bujumbura, Burundi, Nov 11-16, 2013.
World Meteorological Organization Working together in weather, climate and water SWFDP - Eastern Africa Regional Training Workshop on Severe Weather Forecasting.
World Meteorological Organization Working together in weather, climate and water SWFDP - Eastern Africa Regional Training Workshop on Severe Weather Forecasting.
SWFDP-SA: Evolution, challenges and successes Mark Majodina South African Weather Service 1 October 20141FCAST-PRE
Presented by Roger Ndicu CAP Implementation in Kenya.
POWERFUL WEATHER INTELLIGENCE. SWFDDP – South Pacific: Challenges and Opportunities PETER KREFT, CHIEF FORECASTER.
Severe weather forecasting and early warning in the National Meteorological Agency of Ethiopia Tesfaye Gissila National Meteorological Agency of Ethiopia.
SWFDP Eastern Africa- Cascading Forecast
Access to products from the SWFDP-EA RSMC, Nairobi web portal
EMERGENCY ALERTING POLICY WORKSHOP Haleh Kootval Chief, Public Weather Services WMO Montreal, Canada, 1-2 May 2012.
THE USE OF REMOTE SENSING DATA/INFORMATION AS PROXY OF WEATHER AND CLIMATE IN THE GREATER HORN OF AFRICA Gilbert O Ouma IGAD Climate Applications and Prediction.
The African Monsoon Recent Evolution and Current Status Include Week-1 and Week-2 Outlooks Update prepared by Climate Prediction Center / NCEP 23 March.
SIPR Dundee. © Crown copyright Scottish Flood Forecasting Service Pete Buchanan – Met Office Richard Maxey – SEPA SIPR, Dundee, 21 June 2011.
Severe Weather Forecasting Demonstration Project (SWFDP) Peter Chen Chief, Data-Processing and Forecasting System Division Weather and Disaster Risk Reduction.
WMO The WMO Severe Weather Forecasting Demonstration Project – bringing the benefits of leading NWP to developing countries Ken Mylne Chair DPFS (Data-processing.
Severe Weather Forecasting Demonstration project for southern African countries Portfolio committee, 21 August 2007.
THIRD Eastern Africa Regional Training on Severe Weather Forecasting and Warning Services: Workshop on Public Weather Services SOUTH SUDAN PRESENTATION.
Role of Risk Identification for Development and Implementation of the ICPAC Regional Strategy L.A.OGALLO IGAD CLIMATE AND APPLICATIONS CENTRE (ICPAC)
Severe Weather Forecasting Demonstration Project (SWFDP)
Presentation at SWFDP at Entebbe 1 By Chali Debele Mechanism for production and dissemination of warnings and the experience of implementing and impact.
Presented by Roger Ndicu Principal Meteorologist Public Weather Service CAP Implementation Experiences in Kenya KENYA METEOROLOGICAL DEPARTMENT.
21 st May 2012 Case Study for Gode zone (Somali region) flood due to heavy rainfall Chali Debele (Senior Meteorologist) Meheret Muluneh (Senior Forecaster)
World Meteorological Organization (WMO) Severe Weather Forecasting and Disaster risk reduction Demonstration Project (SWFDDP) REGIONAL SUBPROJECT RA V.
Monitoring Weather Hazards in Uganda
Severe Weather Forecasting Demonstration Project (SWFDP) Peter Chen Chief, Data-Processing and Forecasting Systems Division Weather and Disaster Risk Reduction.
Munehiko Yamaguchi Typhoon Research Department, Meteorological Research Institute of the Japan Meteorological Agency 9:00 – 12: (Thr) Topic.
WMO Anticipated advances in Numerical Weather Prediction, and the growing technology gap in weather forecasting Ken Mylne Chair DPFS (Data-processing and.
17 November Organisation Météorologique Mondiale Pour une collaboration active dans le domaine du temps, du climat et de l’eau A perspective from.
World Meteorological Organization Working together in weather, climate and water SWFDP – Southeast Asia and Bay of Bengal Regional Training Workshop on.
Multi Hazard, Impact Based forecasting and warning services
Severe Weather Forecasting Demonstration Project (SWFDP) Peter Chen Chief, Data-Processing and Forecasting System Division Weather and Disaster Risk Reduction.
Meteorological Department St. Maarten
Impact of AMDAR/RS Modelling at the SAWS
Severe Weather Forecasting Demonstration Project (SWFDP) Bay of Bengal
Outline of NMCs Presentation
Eugene Poolman RSMC Pretoria
Severe Weather Forecasting Demonstration Project (SWFDP)
Severe Weather Forecasting Demonstration Project (SWFDP) Bay of Bengal
Outline of NMCs Presentations (Maximum 10 slides)
Severe Weather Forecasting Demonstration Project (SWFDP)
GIFS-TIGGE project Richard Swinbank, and Young-Youn Park,
Linking operational activities and research
Severe Weather Forecasting Demonstration Project (SWFDP)
Presentation transcript:

SWFDP – Eastern Africa (pilot phase) Milestones (Planning and Management): Technical-Planning Workshop (Nairobi, Oct 2010) –Agreement that the SWFDP-EA would be technically feasible –Users: general public, disaster management, media, agriculture and fisheries –Focus on: strong winds, heavy precipitation, Hazardous waves (Indian Ocean and Lake Victoria) 1st Meeting of the Regional Subproject Management Team (Nairobi, June 2011) –Development and approval of the Regional Subproject Implementation Plan (RSIP) –Roles and responsibilities of the participating centres defined –Timelines for implementation defined –Centres’ Representatives appointed, following the nomination by the PRs

SWFDP – Eastern Africa – RSIP for the pilot phase WMO Focus on: Strong winds (≥ 25kts) Heavy precipitation (≥ 50mm/24hr) Hazardous waves (≥ 2m) (Indian Ocean and Lake Victoria) Dry spells (up to: 5 days (LAM); 10 days (global)) Users: general public, disaster management, media, agriculture and fisheries Domains: 5E – 55E; 30N – 25S (for monitoring, analyzing, predicting and verifying the various severe weather events) 31E – 36E; 2N – 4S (for the Lake Victoria) Global Centres: ECMWF, UKMO, NOAA/NCEP (NWP guidance material) MSG satellite products (EUMETSAT products) Verification Regional Centre: RSMC Nairobi, supported by TMA, UKMO and DWD National Met. Centres: Kenya, Tanzania, Uganda, Burundi, Rwanda and Ethiopia Pilot Phase: Started September 2011 to August 2013

SWFDP – Eastern Africa (pilot phase) Milestones (Training): Preparatory Training Workshop (Dar, Oct 2010) –6 forecasters –6 reps of the nat. disaster management orgs –6 reps of the agricultural meteorology sector Training workshop (Arusha, Nov 2011) –6 forecasters – Participating Centres Reps + 3 TMA –6 PWS Focal Points –6 AgM Focal Points

SWFDP – Eastern Africa (pilot phase) Milestones (Training) – cont.: Training Workshop (Entebbe, Nov 2012) –6 forecasters + 2 UDoM (including the UDoM rep for the SWFDP-EA) + 1 South Sudan –6 PWS Focal Points + 1 South Sudan Training workshop (Bujumbura, Nov 2013) –7 forecasters (including 3 participating centres reps: Burundi, Rwanda, Uganda) + 7 BHMD –6 PWS Focal Points

SWFDP – Eastern Africa (pilot phase) Summary of the Quarterly Reports: BurundiEthiopiaKenyaRwandaUgandaTanzania (United Rep.) Oct-Dec 2011yesnoyes Jan-Mar 2012yesnoyes Apr-Jun 2012yesnoyes Jul-Sep 2012no yes Oct-Dec 2012yes noyes

SWFDP – Eastern Africa (pilot phase) Summary of the Quarterly Reports General agreement regarding the usefulness of the products (both deterministic and probabilistic) received from ECMWF, UKMO and NCEP. Participating Centres have moved from a subjective evaluation of different models in a poor man’s ensemble mode to a more objective discrimination in terms of probabilities regarding the occurrence of severe events in their countries Case studies provided are particularly important to give feedback to the forecasters and Centres running NWP models. An example was shown related with the lack of details of ECMWF EPS probabilities around lake Victoria. This feedback has triggered an investigation at ECMWF, which is still ongoing. Some results show a striking difference in the ECMWF precip model climate between D+1 and longer term forecasts on that area.

SWFDP – Eastern Africa (pilot phase) Summary of the Quarterly Reports – cont. Although the thresholds used to issue warnings look low on occasions, regional guidance criteria is appropriate taking into account that the models tend to underestimate the precipitations or strong winds. Verification – events table compiled in the 3 largest countries, slow progress in performing verification activities (maybe due to the lack of specific questions on verification in the quarterly report template)

Improved accuracy in the weather forecasts, alerts and advisories Capacity development –Enhanced skills and competencies (Forecasters and Non-forecasters) –Improved computing/ICT facilities –Improved dialogue among the “Expert Group” Created a “critical-mass” of champions at all levels (Sectors) Created a platform for data/product/information sharing Created confidence among the weather/climate producers and users Forecasters appreciated the usefulness of the NWP products Improved lead-time of warnings, advisories and alerts Improved service delivery SWFDP – Eastern Africa (pilot phase) Summary of the Quarterly Reports - Benefits

SWFDP – Eastern Africa (full demonstration phase) Meeting of the Regional Subproject Management Team in conjunction with the meeting of the EAC Heads of Met Services (Arusha, May 2013) –Started in September 2013; with South Sudan participation –The following criteria were agreed for alerting severe weather in the RSMC Daily Guidance charts: Heavy rain: ≥ 50 mm/24hr, (also ≥30mm/hr criterion in text guidance only) Strong winds: ≥ 25 Kts Ocean/lake large waves: ≥ 2m Dry spells during the rainy season: dry spell of one to 5 days (from LAMs); dry spell of 5 to 10 days (from global models); (a dry day has rainfall less than 3mm a day, warnings needed during the rainy season only) Lightning : lightning risk of 4 or 5 (on 1-5 scale) Hailstorms: hailstorm risk of 4 or 5 (on 1-5 scale) Extreme temperatures: maximum ≥ 35 C; maximum ≥ 40 C sustained for more than the period specified in WHO guidance; minimum < 10 C, < 5 C, < 0 C plus additional warning if these criteria are sustained

SWFDP – Eastern Africa (full demonstration phase) Meeting of the Regional Subproject Management Team in conjunction with the meeting of the EAC Heads of Met Services (Arusha, May 2013) –Revised report template (4-months) to include : More detailed questions on the usefulness of the NWP/EPS products made available through the project Questions on verification –Daily videoconferencing between forecasters (gradually being implemented)

Daily Teleconferencing between forecasters Met Office GGU Kenya (Cross region) Tanzania (Lake Victoria) Rwanda Uganda Burundi Ethiopia South Sudan Consensus Support Collaboration