49 th Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, India, 8-12 October 2012 1 Presented by the International.

Slides:



Advertisements
Similar presentations
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Advertisements

Membership & Roster Maintenance Officers Training Workshop September 2012 Kevin Shanahan 1.
RECORD KEEPING Cooperative Development of Operational
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
ICAO Asia and Pacific Office
The Implementation Structure DG AGRI, October 2005
UNFCCC secretariat, programme Fleur Newman, Programme Officer Breakout session 4.2 Procedure on significant deficiencies CMP & EB Mandates and 2012 Process.
SIP/2012/ASBU/Nairobi-WP/19
APEC GNSS Implementation Team and Outcomes of APEC GIT 16
ICAO AVIATION SAFETY PROGRAMMES
Global ATM Operational Concept
Federal Aviation Administration GOLD Amendment Program By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar.
Regional RAIM Prediction System – Progress Report
AERONAUTICAL COMMUNICATIONS PANEL (ACP) TWENTY THIRD MEETING OF WORKING GROUP F WACAF/ESAF BRIEF REPORT BY OMODELE AROWOLO Cairo, Egypt 21 – 27 September.
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
System of Systems (DRAFT) To be approved by the ICAO Council
Briefing on APANPIRG Priorities and Targets
Electronic Filing of Differences(EFOD) System and Filing of Differences Task Force (FDTF) Air Navigation Bureau.
Module N° 7 – Introduction to SMS
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
The UEA House of Delegates Directing YOUR Association through the democratic process. 1.
Management Plans: A Roadmap to Successful Implementation
Presentation of the proposed Annex 19 – Safety Management
A Roadmap to Successful Implementation Management Plans.
VOORBLAD.
SAI Performance Measurement Framework
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Aviation Safety Management at global, European and Member State level (ICAO, EASP, EASp, SSP, SMS and ESSI) Juan Anton Continuing Airworthiness Manager.
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
International Civil Aviation Organization Roles of an RSOO in the Management of Safety Information and/or Data John Illson Chief, Integrated Safety Management.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Workshop on preparations for ANConf/12 − ASBU methodology
Senior Manager – Research Finance & Programmes
1 Attributing the costs of health & social care Research & Development – Understanding AcoRD Trudi Simmons Senior Manager – Research Finance & Programmes.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Functional Areas & Positions
GEtServices Services Training For Suppliers Requests/Proposals.
Timeline/Issues January to July 2012 FEPA Mid Year Work Session 2012.
REVIEW OF RECOMMENDATIONS OF 2 nd MEETING OF THE NATIONAL COORDINATORS COSCAP – SOUTH ASIA COSCAP – SOUTH ASIA 18 th MEETING OF THE STEERING COMMITTEE.
Nadia Konzali Project Coordinator, COSCAP-GS
Table of contents 1 Manual of Operational Procedures (MOP) 2
25 seconds left…...
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Weekly Attendance by Class w/e 6 th September 2013.
Pan regional ICD for AIDC structure and status (SP/09)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
African Aviation Training Organization
Information Management The ICAO Perspective
International Civil Aviation Organization FAOSD Programme Administrative and Programme Participation Terms & Conditions Roles and Responsibilities.
ATS Route and Waypoint Implementation:
ATM Implementation Support by ICAO APAC RSO
Introduction to PBN Seminar ICAO PBN Implementation 1.
Global and Regional Planning for AIM Transition
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
ATM Implementation Support by ICAO APAC RSO
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23 DP/3/1
the International Civil Aviation Organization
IATA/ATDI Senior Civil Aviation Management Course
Regional RAIM Prediction System – Progress Report
COSCAP-SEA Work Programme Discussion Paper 3
Workshop on preparations for ANConf/12 − ASBU methodology
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
Presentation transcript:

49 th Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, India, 8-12 October Presented by the International Civil Aviation Organization RESPONSES FROM ADMINISTRATIONS TO ACTION ITEMS ARISING FROM THE 48 th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION, ASIA AND PACIFIC REGIONS DP/2/1

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 ACTION ITEM 47/1 Given the global and trans-boundary nature of air traffic flows the Conference recognizes the need for ATM Contingency Plans to be developed in consonance with ICAO Annex 11 and requests the ICAO APAC Office to consider the establishment of a Task Force for planning, coordination and implementation of a regional ATM contingency plan.. 2

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 The Task Force established for planning, coordination and implementation of a regional ATM contingency plan. The Task force met from April 2012 in Bangkok 3 ICAO ACTIONS - 47/1

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 Noting the lack of completion of State PBN Implementation Plan in the APAC Region and in keeping with the ICAO Assembly Resolution A37-11, the Conference urges States/Administrations that are yet to develop their plans, to complete a State PBN implementation plan as a matter of urgency to achieve the timelines and intermediate milestones and: a) requests States/Administrations to identify the focal point, consider deploying some resources to the PBN implementation plan and ensure the responses made within the deadline; b) submit their plans to the ICAO APAC Office at the earliest; and c) requests the ICAO APAC Office to initiate a questionnaire to find out the problem/issues faced by States in not being able to submit a State PBN Implementation Plan. 4 ACTION ITEM 47/4

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 ICAO Action 47/4 Refer DGCA 49 IP/3/17 on PBN TF outcomes The PBN Plan Review Team had undertaken assessments of 12 plans in 2012, and as a result there has been a significant improvement in the number of administrations with a ‘Robust’ status plan, so one-third of administrations now had satisfactory PBN planning. States that had achieved this robust status in the past 12 months were: Hong Kong, China, Myanmar, Nepal, the Philippines and Sri Lanka. Table in next slide provides an overall summary of the status of Asia/Pacific States PBN Plan changes. 5

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 ICAO Action 47/4 Continued 6

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 ICAO Action 47/4 Continued:  Notwithstanding the overall improvement, a large number of States remained as either ‘Marginal’ or ‘Incomplete’ status plans, or had no plan. States with significant aviation activity in this category were Malaysia (‘Marginal’), Pakistan (‘Marginal’) and Indonesia (‘Incomplete’).  Of significant interest to the Task Force was the proportion of Pacific Island administrations (14 of 18) that had not provided a PBN Plan to the Asia/Pacific Office  A PBN SIP Workshop has been approved and is planned for Nadi, Fiji December 2012, which will be held before the last PBN/TF/10. The PBN Workshop is intended to focus on bringing the small South Pacific Island States up to speed with a State PBN Plan. 7

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012  Taking cognizance of the difficulties mentioned in the DGCA-47/DP/9c/3 (Scheduling of DGCA Conferences being held in the same years as ICAO Assemblies) paper, the Conference agrees that during an ICAO Assembly year, the DGCA Conference should be held in a reasonable timeframe before or after the ICAO Assembly, noting that this may require some adjustments to the rescheduling of other related regional meetings. 8 ACTION ITEM 47/16

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 The ICAO Regional Office looked at various options for maximizing efficiency and in consultation with State Administration worked out the following draft program keeping in view the overall objective of efficient management of meetings, cost effectiveness and resources within Regional Office for year  Reducing the number of APANPIRG Meeting days from 5 to3;  Holding RASG APAC meeting back to back with APANPIRG Meeting;  Holding DGCA Conference consecutively with APANPIRG & RASG Meetings.  50 th DGCA Conference is scheduled to be held in Bangkok from 1 to 3 July ICAO Action 47/16

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 The Plan for 2013 is to hold APANPIRG/24 from 24 to 26 June 2013 (Monday to Wednesday), followed by RASG APAC on June (Thursday and Friday). The dates for the Sub Group Meetings will be advanced accordingly The 50 th DGCA Conference in Bangkok is scheduled to be held from 1 to 3 July 2013 (Monday to Wednesday).. 10 ICAO Action 47/16

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 State responses to the 48 th DGCA Conference Action Items are available in 49/DP/2/ DGCA Conference Action Items

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 Recognizing the need for collaboration and harmonization towards seamless ATM in the Asia- Pacific region, the Conference urges States and Administrations to: a) share information and experience on their ATM modernization Programmes, and requests ICAO to explore setting up a website for this; and b) actively participate and contribute resources as appropriate to the Asia Pacific Seamless ATM Planning Group. 12 Action Item 48/1

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012  Refer DGCA 49 DP/3/18 and APAC website (meetings)   Two key deliverables   Asia/Pacific ASBU Position Statement   Seamless ATM Principles supporting the draft Seamless Plan.  A draft Seamless ATM Plan including Seamless ATM Principles presented to APANPIRG/23 13 ICAO Action 48/1

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 Recognizing the potentially significant impact of the ICAO Aviation System Block Upgrades on national ATM modernization and regional harmonization, the Conference requests APANPIRG, through the Asia Pacific Seamless ATM Planning Group, to: a. study the proposed ICAO Aviation System Block Upgrades and provide advice on the benefits, business case and implications to States and Administrations; and b. explore formulating a regional position prior to the 12th Air Navigation Conference. 14 Action Item 48/ 2

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012  Refer DGCA 48 DP/3/18  a) on going – APSAPG is studying the proposed ICAO Aviation System Block Upgrades  b) APANPIRG/23 adopted the Conclusion on Asia/Pacific Position Statement on ASBU 15 ICAO Action 48/2

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 Noting that not all elements of the ICAO Aviation System Block Upgrades are required by States and Administrations, the Conference requests APANPIRG, through the Asia Pacific Seamless ATM Planning Group, to: identify the critical minimum operational and system needs under the ASBUs to be implemented for implementation. 16 Action Item 48/ 3

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012  Refer DGCA 49 DP/3/18 APANPIRG/23 agreed to the following Conclusion on Asia/Pacific Position Statement on ASBU Contained in Appendix 2 to the APANPIRG/23 report on Agenda Item ICAO Action 48/3

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 Recognizing that the full benefits of ADS-B would only be achieved through harmonized implementation, the Conference urges States and Administrations to expedite ADS-B implementation and share with ICAO Regional Office their implementation plan. 18 Action Item 48/ 4

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012  13 Administrations support implementation of ADS-B  Three Guidance Materials (Safety case, sample document for sharing and amendment to AIGD) have been posted on APAC website. 19 ICAO Action 48/4

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 Refer: DGCA 48 IP/3/17 Noting the importance of GNSS in supporting PBN, the Conference urges States and Administration to: a.expedite the implementation of PBN as well as GNSS, and to look into creating a regulatory environment and the protection of aviation use of GNSS; and b.implement the minimum requirement of GNSS- enabled area navigation systems for all RNP navigation authorizations, which has been adopted.. 20 Action Item 48/5

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012  17 Administrations support implementation of GNSS  GNSS workshop was held on 26th March 2012 and the Outcomes were: 1) Recommendation 1: That, States, which have not yet developed a GNSS plan, be requested to integrate their GNSS implementation plan within their PBN plan; 2) Recommendation 2: That, ICAO be invited to consider including GNSS as an element of ILS for the purpose of distance/altitude verification. 21 ICAO Action 48/5

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 Given the need for global implementation of the new FPL 2012, the Conference urges States and Administrations to: a.expedite its implementation; and b.cooperate and share information with other States and Administrations to ensure a timely transition to the FPL Action Item 48/6

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 ICAO Action - 48/6  Refer DGCA 49 DP/3/16  16 Administrations have reported implementation is at various stages of completion and one Administration has reported that FPL 2012 has been implemented.  State Letter 12 April 2012, advising States of their assessed risk, and requesting response to revised questionnaire by 11 May   Thirteen responses by the due date   Total 23 responses now received, including only partial information in some cases. 23

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 To promote AIM implementation in the Asia-Pacific, the Conference urges ICAO to look into: a. developing an Asia Pacific AIM Implementation Plan to ensure seamless transition to AIM and inter-operability; b.providing States with Advisory Circular on eTOD implementation until ICAO specifications on electronic terrain and obstacle data are developed; c.establishing a website as a means of tracking the implementation status of States and Administration; and d. establishing a central database of aeronautical information that is available to ATM users. 24 Action Item 48/7

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 a) The Seamless ATM Plan being developed by the Asia/Pacific Seamless ATM Planning Group (APSAPG) includes AIM requirements. The AIM transition table being maintained and updated on the ICAO Asia/Pacific Regional Office website tracks current AIM implementation status. Due to slow progress of many States the AIS-AIM Implementation Taskforce (AAITF) has placed a much greater emphasis on individual State planning to achieve AIM transition as soon as practicable, including the development by each State of a basic plan. 25 ICAO Action 48/7

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012  b. E TOD Manual is under preparation and expected to be available in 1 st Quarter of 2013  c. In progress as part of transition from paper based Regional ANPs to web based Regional e ANPs. Target date- July 2013  d. To be considered in due course 26 ICAO Action 48/7

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012 Recognizing the benefits of ATFM, the Conference requests that the ICAO Regional Office to develop and coordinate with ICAO Air Navigation Bureau the Regional ATFM Strategy. 27 Action Item 48/8

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October 2012  ATFM is a key component of the Seamless ATM Plan  The Asia/Pacific ATFM Concept of Operations has been incorporated into the new Draft ATFM Global Guidance Material 28 ICAO Action 48/8

49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8– 12 October