Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 8/25/2014 1 A CO 2 versus noise trade-off study for the evaluation.

Slides:



Advertisements
Similar presentations
Course Schedule three Assessment Scenarios Discussion Groups Discussion Groups.
Advertisements

Flight Operations.
Performance Based Transition
Industry Viewpoint – Block 0 Carlos Cirilo Assistant Director Infrastructure Strategy 16 November 2012.
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Continuous Climb Operations ( CCO )
Design of the EU ETS for aviation. Aviation and EU ETS legislation Directive 2008/101/EC Directive 2008/101/EC –entered into force on 2 February 2009.
Identifying the Achilles Heels of Instrument Flight Procedures International Flight Inspection Symposium Oklahoma City, OK USA June 2008 Ivan Ferencz CAA.
International Flight Inspection Symposium
Javier Perez Diestro Air Navigation International Director
RNP AR Operation in Sweden
PBN ICAO HQ Activities Overview
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Procedure Design Considerations
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
JAR OPS Noise Abatement Procedures
NPA 53b JAR OPS Noise Abatement Procedures
Continuous Climb Operations (CCO) Saulo Da Silva
International Civil Aviation Organization Hands-on Exercises Performance Based Planning and use of IFSET SIP/ASBU/Bangkok/2012-WP/32B Workshop on preparations.
OPSG 1 JAR OPS Noise Abatement Procedures Capt. Claude Godel OST 05-4.
Estimating Requirements and Costs of 4D ATM in High Density Terminal Areas Gunnar Schwoch DLR Institute of Flight Guidance Braunschweig, Germany ICNS 2012.
Protection Values for VOR-Defined ATS Routes
International Civil Aviation Organization Continuous Descent Operations (CDO) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
En Route Performance CPL Performance.
Review Continuous Descent Operations Manual Roosevelt Pena (Dom Rep)
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
Study Continuous Climb Operations
Flight Operations Panel Madrid May 2002 Rob Root Flight Operations Engineering B AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP.
Containing Aviation Emissions in the Short-term
Green actions in the Air Traffic Management perspective Flygteknik 2010, October Tomas Mårtensson, Martin Hagström; FOI.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
OPTIONS FOR EMISSION AVIATION INVENTORIES The Spanish Civil Aviation View Copenhagen may-2004 Alfredo Iglesias.
CY Segment 1 Phase 1 Tower Services Initial En Route Services Departure Clearances (DCL) Transfer of Communications Initial Check-In.
The Research of One Engine Inoperation for RNP Presented by Wang Zhong.
Potential Safety Benefits of RNP Approach Procedures
NY/NJ/PHL Metropolitan Area Airspace Redesign Record of Decision (ROD) Announcement Congressional Briefing Name: Steve Kelley Date: September 5, 2007 Federal.
Basics of RNP. Outline  What is RNP?  Why implement RNP?  What does it mean for communities?
NOISE ABATEMENT PROCEDURE DESIGN
Flight Operations.
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
PlaneWrong AGM Thursday 13th October
Performance Based Transition
Industry Viewpoint – Block 0
A case study at Gothenburg Landvetter Airport
Continuous Climb Operations (CCO) Saulo Da Silva
Hands-on Exercises Performance Based Planning and use of IFSET
Continuous Descent Operations (CDO) Saulo Da Silva
Delivering NATS ATM CO2 Targets
Performance Based Navigation at London Stansted
Basics of RNP.
Continuous Climb Operations (CCO) Saulo Da Silva
Click to edit Master text styles
Oceanic and International Operations
Workshop on preparations for ANConf/12 − ASBU methodology
Click to edit Master text styles
Hands-on Exercises Performance Based Planning and use of IFSET
Click to edit Master text styles
ОПШТЕСТВО ТЕМА: МЕСТОТО ВО КОЕ ЖИВЕАМ Скопје
Continuous Climb Operations ( CCO )
Balanced Approach to Noise Mitigation
Click to edit Master text styles
Continuous Climb Operations ( CCO )
Balanced Approach to Noise Mitigation
Click to edit Master text styles
PBN ICAO HQ Activities Overview
Presentation transcript:

Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 8/25/ A CO 2 versus noise trade-off study for the evaluation of ATM speed constraints in the departure phase of flight A case study at Gothenburg Landvetter Airport Debbie Rushton & Henrik Ekstrand ICAO EUR PBN TF/7 Paris

Outline Motivation for study Optimising local implementation of PANS-OPS guidance Overview of turn-related speed constraints Case study: Gothenburg Landvetter Airport Speed constraints on TOPLA 1M SID Speed constraint scenarios modelled Data and aircraft performance/noise modelling Results – CO 2 versus noise trade-off study Conclusions Possible solutions for removal of SID speed constraints

Motivation SESAR target 10% CO 2 via ATM improvements by 2020 Potential for substantial fuel savings Historically emphasis on reducing noise exposure around airports. Departure procedures based on interpretation of PANS-OPS Possibility for optimisation

Optimising local implementation of PANS-OPS guidance Local interpretation and implementation of PANS-OPS guidance. Procedure variation between airports (hence in environmental performance). Some PANS-OPS procedures based on performance of old aircraft types (e.g. MD-80). Modern state-of-art aircraft penalised increased CO 2. Identify solutions to optimise existing procedures based on aircraft performance whilst maintaining safety.

Example: turn-related speed constraints on departure PANS-OPS recommends use of speed constraints on SIDs with small-radius turns at low altitude. Designed to ensure containment within protection area during strong winds. Speed constraint dependent on: Track change of turn. Altitude. Assumed met conditions = worst-case tail wind. Max. allowed aircraft bank angle = 25° above ft. Appears overly-conservative for modern aircraft, e.g. A321.

Fuel burn penalty of turn-related speed constraints Example: 210 KIAS constraint at Gothenburg Landvetter Airport Slat retraction usually >210 KIAS Flap retraction >210 KIAS for heavy aircraft

Case study: Gothenburg Landvetter Airport (ESGG) RWY03 RWY21 ESGG

TOPLA 1M departure route 210 KIAS speed constraint 210

Speed constraint scenarios KIAS to 10 NM KIAS to 10 NM KIAS to 10 NM KIAS to Flight Level Free Speed (no constraints)

Data Flight Data Recorder data from Novair. Take-Off Data Calculation (TODC) data. Selected initial conditions for typical Winter flight. Meteorological data. Novair A321 departures along TOPLA 1M SID (RWY 03).

Aircraft performance modelling & validation Operational Flight Performance (OFP) tool in Airbus Performance Engineers Program (PEP). Replicate actual flight performance based on manufacturer’s data. Ensured PEP climb profile in good agreement with the FDR data. Made deviations in PEP by changing speed constraints.

Aircraft noise modelling Airbus Noise Level (NLC) tool. Assume microphone location 1.2 m above ground level (ICAO Annex 16) and directly under flight path. Noise calculations based on manufacturer’s Noise Power Distance tables. Maximum A-Weighted Audible Noise (LA max ) metric used for analysis (metric used in Sweden for procedure development). Also describes single-event noise.

Data analysis

Speed Constraint Scenarios - Results Climb profiles consistent until 5 NM and 2300 ft AGL. 205 KIAS scenario has highest altitude between 5 NM and 12 NM. 250 KIAS and Free Speed scenarios identical until 7 NM and 2800 ft AGL. Free Speed profile has lowest climb angle during initial climb phase (limited due to prolonged acceleration phase).

Speed Constraint Scenarios - Results Distances >7 NM Free Speed scenario generates highest LA max. Explained by shallow climb profile of aircraft. Similar noise profiles for remaining 4 scenarios above 10 NM ground distance. Noise profiles identical until ~4NM.

55 dB(A) = 155 km 2 70 dB(A) = 15 km 2 55 dB(A) = 184 km 2 70 dB(A) = 15 km KIAS to 10 NM (present day)Free Speed Speed Constraint Scenarios - Contours

Area most affected by increased noise due to removal of speed constraints Region affected by noise during prolonged acceleration phase

CO 2 vs. Noise Trade-Off Analysis – Results Potential for CO 2 savings of ~180 kg per flight if remove 210 KIAS and 250 KIAS speed constraints on LABAN 1M SID (~60 kg fuel). Increase in noise ranging between 2 dB(A) – 5 dB(A) during initial climb depending on position along flight path.

Speed Constraint Analysis - Conclusions Free Speed causes aircraft to stay closer to ground during initial climb – increase in noise profile by 2 – 5 dB(A) below 70 dB(A) depending on position along flight path. Offset by potential fuel savings ~60 kg for heavy A321 winter flight and ~180 kg reduction in CO 2. ~3500 departures along TOPLA 1M per year ~190 tonnes of fuel savings and ~575 tonnes of CO 2. Removal of turn-related speed constraints increases noise closer in to airport but alleviates noise further out (objective of NADP 2). ATM industry must prioritise between aircraft noise exposure and CO 2 emissions in order to meet SESAR target of 10% reduction in CO 2 emissions by 2020.

Possible solutions for removal of SID speed constraints Optimise use of PANS-OPS guidance Deviation from PANS-OPS & local safety case OR 1.Use of statistical winds rather than worst-case winds for procedure design. 2.Allow aircraft capable of banking 30° to fly turn without speed constraint. 3.Publish RNP procedure using radius to fix (RF) legs. Publish overlay SID procedure with less restrictive constraints. Publish overlay SID procedure for RF-equipped aircraft. Produces flight path that is almost identical to conventional one from ATC perspective – does not increase ATC workload or airspace complexity.

Track-keeping adherence

QUESTIONS?