ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.

Slides:



Advertisements
Similar presentations
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Advertisements

Block 1 Overview Rubén Oscar González Air Navigation Commissioner
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
1 Managed Airspace or Free Flight by Steve Zerkowitz Assistant Director Infrastructure Europe IATA.
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Mission Trajectory Step 1 From planning to deployment.
ASAS Dream or reality? ASAS TN Workshop April 2003 Presented by Thomas Fixy Manager Air Traffic Information Management.
Operational applications enabled by ADS-B
ASAS TN 6-8 October 2003 GS applications in Kiruna A Swedish ADS-B validation site Göran Hasslar CNS/ATM Applications Systems Engineer.
ASAS TN 2nd Workshop 6-8 October ADS-B Safety Analysis (ASA & GSA) Bob Darby EUROCONTROL ADS Programme ASAS Thematic Network Second Workshop 6-8.
C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE ASAS-TN, 2nd workshop - Malmö 6 ~ 8 october 2003page 1 Electronic separation Clearance Enabling the Crossing.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Applications from packages I to III
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS Thematic Network First Workshop Outcome Eric Hoffman 6-8th October Malmö.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
2 nd Workshop, April 2006 ASAS in Tomorrows Airspace Pierre Gayraud, THALES Bob Graham, EEC Tony Henley, BAe Systems Dr Anthony Smoker, IFATCA ASAS-TN2.
SESAR State of the Art – Civil RPAS Insertion in the European Aviation System 3 rd Workshop on European Unmanned Maritime Systems FÓRUM DO MAR Porto, May.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
ASAS TN Third Workshop, April 2004, Toulouse 1 Session 2 Functional and Technical issues and Solutions Chairperson : JC Richard Secretary : G Matrella.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
Alberto Pasquini – Deep Blue Safety Assessment in MFF ASAS TN2 3-5 April 2006, Rome MENU: COVER | SUMMARY | OVERVIEW | TASKS | ALLOCATIONSCOVER SUMMARY.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
ASAS Thematic Network II First Workshop Savoy Hotel, Malmö.
ASSTAR Overview Jean-Marc Loscos, DSNA
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Ground System implication for ASAS implementation
ASSTAR Project Overview & User Forum Objectives
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO AMCP WG-M/1 meeting, December 2000
ASAS-TN2 5th Workshop Toulouse 17 September 2007 Jörg Steinleitner
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS

ASAS TN Second Workshop, 6-8 October 2003, Malmö Overview Implementation Challenges Work In Progress The Way Forward

ASAS TN Second Workshop, 6-8 October 2003, Malmö Implementation Challenges Operational definition Technology ACAS/ASAS Integration Equipage Rates Certification Large scale Validation Investment costs vs benefits

ASAS TN Second Workshop, 6-8 October 2003, Malmö Work In Progress Research Programmes –MA-AFAS, AFAS, NUP I&II, MFF Requirements Focus Group –Coordinates European and US Activity OSED Harmonisation Group –Standardising applications –feeds SPR/INTEROP activities Integration with other tools/capabilities –(C-ATM, SEAP, LAVA/NUP III)

ASAS TN Second Workshop, 6-8 October 2003, Malmö Base Line Strategy Considerations Retrofit vs Forward fit ATSAW vs new operations Core Europe vs city pairs Many small steps vs few big leaps

ASAS TN Second Workshop, 6-8 October 2003, Malmö Retrofit vs Forward fit ASAS requires a fleet of interacting aircraft –1 A/c per hour per airport will not give benefits –Estimate 40-50% equipage in sector/TMA required to evaluate benefits large commercial aircraft in Europe –most with another 10 years of life –Forward fit will give 50% equipage by 2018? earliest

ASAS TN Second Workshop, 6-8 October 2003, Malmö ATSAW vs New operations in European Radar airspace ADS-B Out - (without intent ) –no additional information –no cost justification ATSAW -(ADS-B In) –new information to pilots –under ATC radar control, cannot be used –(except on airport surface) –no operational benefit ASAS Manoeuvres SVA, S&M, C&P –Measurable operational benefits –potential cost justification

ASAS TN Second Workshop, 6-8 October 2003, Malmö Initial Deployment large scale validation –high density of equipped aircraft per selected sector or TMA city pair-e.g Madrid Barcelona -or hub –one or two airlines –small number of aircraft types problem in core Europe - – many airlines and aircraft types –difficult to achieve the density quickly –higher costs

ASAS TN Second Workshop, 6-8 October 2003, Malmö The Way Forward Two phases of equipage –Phase 1 at Local/Regional Level - ADS-B in and Out with Maneuver Guidance Near term Demonstrate benefits to airlines Minimise impact on ground infrastructure –Phase 2 Fully integrated avionic solution (new FMS) Integration of ASAS with 4 D trajectories and new ATC tools

ASAS TN Second Workshop, 6-8 October 2003, Malmö Phase 1 (~2007+) Package 1 validation  Focus on functions giving operational benefits  Start with high density sector with few airline  No change in separation responsibility On ground  Minimal change to ground infrastructure  Necessary enhancements to CWP MMI In Air  Single avionic unit incorporating surveillance database and manoeuvre generator  Manual control of manoeuvres via autopilot

ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS Prerequisites Pilot Support Controller support Accountant support ( Airlines & ANSPs) Therefore Responsibilities must be clear –Safety must be maintained Benefits must justify investment

ASAS TN Second Workshop, 6-8 October 2003, Malmö End