RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Comisión Nacional de Actividades Espaciales Exeter, October 2012 RARS IG - 6 Servicio Meteorológico Nacional South America RARS - Argentina Argentinean.
Slide 1 Insert your own content. Slide 2 Insert your own content.
VIIRS Data Evaluation Over Thailand and Japan February 13, 2012 Chair, Chris Elvidge NOAA-NGDC 1.
GEO User Interface Committee Meeting, Ottawa, 5 – 7 September 2006 Page 1 GEONETCast The EUMETCast Contribution Delivering Operational Services to Users.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
EUMETSAT Data Collection System
The GEONETCast Alert Channel and CAP over GTS
CMAs Satellite-based Data Services NMIC, CMA. Outline CMAs domestic communication networks CMAs data dissemination services – CMA PCVSAT broadcast – CMA.
Slide 1 ECMWF Training Course - The Global Observing System - 06/2013 The Satellite Global Observing System Stephen English 1.A brief introduction to the.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Welcome to Who Wants to be a Millionaire
1 Copyright Copyright 2012.
VOORBLAD.
© Crown copyright Met Office RARS Implementation Group – Software and monitoring Nigel Atkinson (Met Office, UK) RARS IG-6.
6 th RARS IG-Meeting 25 th - 26 th,Oct/2012 (EXETER - UK) INPE/INMET Brazilian Institute for Space Research National Institute of Meteorology Sérgio de.
© 2012 National Heart Foundation of Australia. Slide 2.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Combining Multiple References GSICS Web Meeting
1 World Meteorological Organization ICG-WIS Brasilia July 2008 Key Points from the 2 nd meetings of the RARS and IGGDS Implementation Groups WORLD.
WMO RA VI WORKSHOP, SOFIA, BULGARIA, 1 – 3 NOVEMBER 2011 EUMETSAT DCPC and it's interface to users in RA-VI Slide: 1.
Addition 1’s to 20.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
Title: Applications of the AWG Cloud Height Algorithm (ACHA) Authors and AffiliationsAndrew Heidinger, NOAA/NESDIS/STAR Steve Wanzong, UW/CIMSS Topics:
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
NWCSAF 2014 Users’ Survey NWC SAF 2015 Users Workshop February 2015 Ana Sánchez Piqué
1 Improving Data Mobility & Management for International Climate Science, & Challenges in the provision.
RARS Implementation Group – Sixth meeting Exeter RARS Implementation Group – Sixth Meeting Exeter – 2012 Status of EARS Slide: 1.
Community Satellite Processing Package NOAA Satellite Conference, 8-12 April 2013 Liam Gumley CIMSS/SSEC, UW-Madison Hurricane Sandy 2012/10/28 06:25 UTC.
EUM/OPS/VWG/11/0498 Issue GEONETCast EUMETSAT EO Portal Product Life Cycle Slide: 1.
Slide: 1 ROSA GRAS Meeting February 2009 Matera, Italy User Services EUMETSAT EUMETSAT Data Access & User Support.
1 EUMETSAT SAF NETWORK Lothar Schüller, EUMETSAT SAF Network Manager.
WMO Space Programme, CBS Technical Conference1 Integrated Global Data Dissemination Service (IGDDS)
Filename.ppt 1 NOAA Direct Broadcast Data Initiative to Meet NWP Latency Requirements NOAA WP-13.
Suomi National Polar-orbiting Partnership (SNPP) Data Access NOAA Satellite Conference April 8-12, 2013 Kevin Berberich NESDIS/OSD NDE Project Photographs.
Centre de Météorologie Spatiale DP/CMS/R&D–GuyRochard28/11/2002 Direction de la Production Centre de Météorologie Spatiale Direction.
WMO Space Programme Expert Team on WIS & GTS, Tokyo, April Integrated Global Data Dissemination Service (IGDDS)
The Satellite Meteorology Centre  The Satellite Meteorology Centre (Centre de Météorologie “Spatiale” : CMS) is established at Lannion in the Côtes d'Armor.
APSDEU-6, 1-3 June 2005 Seoul, Korea 1 ASIA-PACIFIC RARS (Regional Advanced Redistribution System) IMPLEMENTATION PLAN Notes for APSDEU-6 by David Griersmith.
POLAR MULTI-SENSOR AEROSOL PROPERTIES OVER LAND Michael Grzegorski, Rosemary Munro, Gabriele Poli, Andriy Holdak and Ruediger Lang.
Slide 1 Second GPS/RO Users Workshop, August , The EUMETSAT Polar System GRAS SAF and Data Products Martin B. Sorensen GRAS SAF Project Atmosphere.
GRAS SAF User Workshop June GRAS Level 1 Processing and Products Juha-Pekka Luntama and Julian Wilson EUMETSAT Am Kavalleriesand 31, D
WMO Space Programme Activities, RARS and IGDDS David Griersmith Observer for WMO at APSDEU-7 Honolulu, Hawaii September 2006.
Slide: 1 xxx xxx, 23 October 2008 xxx EUMETSAT Data Access.
MSC Satellite Reception Network slides from:David Bradley additions by:Ron Goodson.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Direct Broadcast Network (DBNet) for Near.
© Crown copyright Met Office Report to 22 nd NAEDEX Meeting Roger Saunders + many others, Met Office, Exeter.
NOAA Near Real-Time AIRS Processing and Distribution System Walter Wolf Mitch Goldberg Lihang Zhou NESDIS/ORA/CRAD.
New Australian High Resolution AVHRR SST Products from the Integrated Marine Observing System Presented at the GHRSST Users Symposium, Santa Rosa, USA,
Monitoring weather and climate from space
Jérôme Lafeuille WMO Space Programme
NOAA Report on Ocean Parameters - SST Presented to CGMS-43 Working Group 2 session, agenda item 9 Author: Sasha Ignatov.
SNPP Regional Retransmission Service: Plans and Status of Implementation Presented to CGMS-43 Working Group 1 session, agenda item 6.
Processing and Use of Direct Broadcast Data at the Met Office
HIGHLIGHTS 2 ARGOS satellites decommissioned (NOAA 12 and 14)
Mikael Rattenborg and Jérôme Lafeuille WMO Space Programme
NOAA-20 and Suomi NPP ATMS On-orbit Performance
Intercomparison of IASI and CrIS spectra
Ninghai Sun1, Lihang Zhou2, Mitch Goldberg3
Presentation transcript:

RARS Implementation Group – Sixth meeting Exeter RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1

RARS Implementation Group – Sixth meeting Exeter EARS-IASI

RARS Implementation Group – Sixth meeting Exeter EARS-IASI Design: Decentralised processing. Channel selection and data compression using Principal Component Scores to reduce data volume. Processor: AAPP (v7.3) and OPS-LRS (v6.0p12) as delivered by NWP SAF. Distribution via EUMETCast Ku-Band and GTS. Satellites: Metop-A (Metop-B, Metop-C). Number of stations: 4 (more planned for Metop-B). Products, formats: One Level 1c product per pass: –calibrated and navigated IASI observations, –combined product containing both Principal Component scores and 366 original IASI Channels, –cloud/scene analysis information, –BUFR format. Timeliness: 30 minutes (HRPT). 60 minutes (FDES).

RARS Implementation Group – Sixth meeting Exeter EARS-IASI (2/2) Number of Users on EUMETCast: > 100 registered Users. Number of products per day: ~ 25 files, corresponding to 500 MB. System evolutions in the near future: GTS dissemination to start in November Metop-B. Product quality monitoring (under development): NWP-SAF product monitoring (comparison with global data and local products, warning messages, etc.). Details to be agreed. Statistics + inter-comparisons at EUMETSAT.

RARS Implementation Group – Sixth meeting Exeter Product Processing Slide: 5 OPS-LRS AAPP L1C IASI GTS EUMETCast IASI L1 BUFR (PC scores and 366 channels) L0 IASI AAPP L0 AVHRR L1B AVHRR

RARS Implementation Group – Sixth meeting Exeter Daily Data Volume per Service (EUMETCast Ku-Band - October 2012) Slide: 6 ServiceNumber of stations Number of satellites Total number of passes Daily volume (MB) EARS-ATOVS EARS-AVHRR7228 (630 segments)1400 EARS-ASCAT EARS-IASI EARS-NWC7228 (630 segments)800

RARS Implementation Group – Sixth meeting Exeter EARS-NPP

RARS Implementation Group – Sixth meeting Exeter Direct Readout Reception Supporting NOAA POES, Metop, NPP/JPSS, FY3 Slide: 8 NOAA POES L-Band 0.6 Mb/s Metop L-Band 3.5 Mb/s FY-3 L-Band 3.5 Mb/s X-Band 18 Mb/s L-Band NPP/JPSS X-Band 15 Mb/s X/L-Band

RARS Implementation Group – Sixth meeting Exeter EARS – New Regional Suomi NPP Services Satellites: NOAA POES Metop Suomi NPP Services EARS-ATOVSL1A/C/D EARS-ASCATL2 Winds EARS-AVHRRL0 EARS-IASIL1C + PCS EARS-NWCL2 Clouds EARS-ATMSSDR (L1C) EARS-CrISSDR (L1C) EARS-VIIRSSDR (L1C) Initial Suomi NPP Coverage

RARS Implementation Group – Sixth meeting Exeter EARS-NPP Common part Slide: 10 Geographical coverage:  6 core European stations initially. Other EARS stations to be added if and when NPP data become available. Product processing:  CSPP/AAPP, as provided by the CIMSS/NWP-SAF, configured and run by EUMETSAT. Kangerlussuaq Svalbard Athens Lannion Moscow Maspalomas

RARS Implementation Group – Sixth meeting Exeter EARS-NPP EARS-ATMS Slide: 11 Product Segmentation: one file per station pass. Products via EUMETCast (Ku-Band Europe):  SDR (Level 1),  all 22 channels,  all FOV,  data on original instrument grid,  BUFR format. Timeliness via EUMETCast: 30 minutes. Products via GTS/RMDCN: As for EUMETCast.

RARS Implementation Group – Sixth meeting Exeter EARS-NPP EARS-CrIS Slide: 12 Product Segmentation: one file per station pass. Products via EUMETCast (Ku-Band Europe):  SDR (Level 1),  399 channels out of 1305,  all FOV,  data on original instrument grid,  BUFR format. Timeliness via EUMETCast: 30 minutes. Products via GTS/RMDCN: As for EUMETCast.

RARS Implementation Group – Sixth meeting Exeter EARS-NPP EARS-VIIRS Slide: 13 Product Segmentation: segmented. Duplicates removed. Products via EUMETCast (Ku-Band Europe):  SDR (Level 1), geolocation on tie-points,  all 16 M-Band channels,  HDF5 format,  bzip2 compressed. Timeliness via EUMETCast: 15 minutes. Products via GTS/RMDCN: None.

RARS Implementation Group – Sixth meeting Exeter Building on EARS infrastructure Slide: 14 EUMETCast is EUMETSATs data dissemination system based on DVB over satellite Minutes

RARS Implementation Group – Sixth meeting Exeter Product Processing Slide: 15 CSPP AAPP L1/SDR ATMS & CrIS VFP** L1/SDR VIIRS GTS EUMETCast L1 BUFR ATMS & CrIS BZIP2 L1’ VIIRS L1’’ VIIRS L0/RDR* VIIRS, ATMS & CrIS *: using RT-STPS to produce RDR per instrument from CADU file containing all instruments. **VFP: VIIRS Formatting Package (computes geolocation on tie-points, scale radiances and segments data)

RARS Implementation Group – Sixth meeting Exeter Slide: 16 Product Quality Monitoring Planned for EAR-NPP EARS-ATMS and EARS-CrIS: -Product quality indicator collected during the processing and recorded (statistics, time series…). -Comparison with global data and independent local products (offline). EARS-VIIRS: -As for EARS-ATMS and EARS-CrIS plus: -VIIRS tie-point and interpolation: geolocation errors to be recorded. Involvement of the SAFs (TBC): -NWP-SAF for EARS-ATMS and EARS-CrIS. -NWC-SAF for EARS-VIIRS.

RARS Implementation Group – Sixth meeting Exeter Daily Data Volume per Service (October 2012) Estimates for ATMS, CrIS and VIIRS Slide: 17 ServiceNumber of stations Number of satellites Total number of passes Daily volume EARS-ATOVS EARS-AVHRR7228 (630 segments)1400 EARS-ASCAT EARS-IASI EARS-NWC7228 (630 segments)800 EARS-ATMS MB EARS-CrIS MB EARS-VIIRS6114 (300 segments)> 11GB

RARS Implementation Group – Sixth meeting Exeter Slide: 18 Early Access to Regional NPP Services Early access to the three Regional NPP Services is expected as follows:  EARS-ATMS starting in Q  EARS-CrIS starting in Q4 2012, initially without VIIRS Cloud information  EARS-VIIRS starting in Q1 2013