Ship Safety and Security Implementation of Masked Callsigns

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Seasonal Forecasting and Weather/Climate information at WMO
Animal Tracking Component Private and State Animal Tracking Databases (ATD) Animal Trace Processing System (ATPS) National Animal Identification System.
Use of VOS data in Climate Products Elizabeth Kent and Scott Woodruff National Oceanography Centre, Southampton NOAA Earth System Research Laboratory.
World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating and coordinating international.
25 October 2002Geneva1 Plant variety rights - The Breeders Exemption Tim Roberts © 2002.
Graeme Ball VOS Program Manager, Australia Chairman, Ship Observations Team PMO-III, March 2006, Hamburg, Germany. Information Exchange & VOS Promotion.
Software change management
Task Team on Metadata for WMO-No. 47 World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO SOT-IV April 2007, Geneva,
JCOMMOPS as Portal for WMO No. 47 World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating.
World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO SOT Terms of Reference Ship Observations Team ~ integrating and coordinating.
SOT Introduction and Goals of SOT-IV World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating.
Roles, Responsibilities and Functions of the Port Meteorological Officer World Meteorological OrganizationIntergovernmental Oceanographic Commission of.
National Report by Australia SOT-IV April 2007, Geneva, Switzerland Graeme Ball Australian Bureau of Meteorology with input from Ann Gronell (CSIRO),
Page 1© Crown copyright Elanor Gowland, Chair META-T SOT-IV, 16 th –21 st April 2007 Water temperature metadata pilot project META-T.
VOS Communications Problems and Errors World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating.
World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating and coordinating international.
World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating and coordinating international.
World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating and coordinating international.
World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating and coordinating international.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DG “PROGRAMMING OF THE REGIONAL DEVELOPMENT” OPERATIONAL PROGRAMME “REGIONAL DEVELOPMENT” EVALUATION.
Graeme Ball Chairman, Ship Observations Team Ship Observations Team PMO-III, March 2006, Hamburg, Germany.
Graeme Ball VOS Program Manager, Australia Chairman, Ship Observations Team PMO-III, March 2006, Hamburg, Germany. Role & Responsibility of the PMO.
Identity Management Based on P3P Authors: Oliver Berthold and Marit Kohntopp P3P = Platform for Privacy Preferences Project.
JCOMM Expert Team on Marine Climatology - Task Team on Marine-Meteorological and Oceanographic Summaries (TT-MOCS) Elizabeth Kent National Oceanography.
AMVERSEAS Status and Plans Francis Bringas NOAA / Atlantic Oceanographic and Meteorological Laboratory (AOML), Miami, FL AMVERSEAS.
Encapsulation Security Payload Protocol Lan Vu. OUTLINE 1.Introduction and terms 2.ESP Overview 3.ESP Packet Format 4.ESP Fields 5.ESP Modes 6.ESP packet.
UPDATING TABLE DRIVEN CODE FORMS 18 April 2006 (Joël Martellet, WMO, World Weather Watch, Data Processing and Forecasting Systems)
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (1) JCOMM in situ Observing Platform Support Centre Most developments now achieved –Infrastructure in.
ET-DARE W.J. Wright Bureau of Meteorology 700 Collins St, Melbourne, Australia Ph: W.Wright
JCOMM in situ Observing Platform Support Centre JCOMMOPS
1 World Meteorological Organization Ship owners and masters concerns with regard to VOS data exchange WMO-EC LVIII, June 2006 –No reclassification (Res.
World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating and coordinating international.
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS David Meldrum, vice chair, JCOMM OPA.
Surface Marine Metadata Prepared for 1st meeting of WCRP Working Group on Surface Fluxes Halifax, October 2004.
Technical Working Group, II Teruko Manabe Steven Worley Miroslaw Mietus Shawn Smith Simon Tett Volker Wagner Scott Woodruff David Berry Liz Kent.
IV-3.1 JCOMMOPS SOT Technical Coordinator. 2 JCOMMOPS structure Programmes currently supported –Ship Observations Team (30% Mathieu Belbeoch) –Argo Profiling.
IPET-DRMM WMO; Name of Department (ND). IPET-DRMM  Inter-Programme Expert Team on Data Representation Maintenance and Monitoring  looks after  traditional.
Ship Observations Team NOAA Climate Observations Program 3 rd Annual System Review. 25–27 April 2005, Silver Spring, USA. Graeme Ball Chairman, Ship Observations.
Monitoring and management of ship logistics opportunities M. Belbeoch PMO IV December 2010 Orlando, USA.
Page 1© Crown copyright Report of the Global Collecting Centres Elanor Gowland, GCC UK SOT-IV, 16 th - 21 st April 2007.
Towards Data Management Principles (report of progress of the Task Force on Data Management Principles) Alessandro Annoni European Commission Joint Research.
Topics describe the Data Buoy Cooperation Panel (DBCP) –aims, –achievements and –Challenges network status developments of data buoy technology JCOMM.
I-2.5 Report by the former SOT Technical Coordinator Hester Viola 1 May 2007 – 31 January 2009.
Guidelines to Port Meteorological Officers By S P Joshi Assistant Meteorologist.
MEDIN Work Plan for By March 2011 MEDIN will be 3 years into the original 5 year development plan started in Would normally ask for continued.
JCOMM Services Program Area Working together beyond GODAE for Operational Oceanography Dr. Craig Donlon JCOMM Service Programme Area Coordinator The Met.
© Crown copyright Met Office Upgrading VOS to VOSClim Sarah North.
Global Collecting Centres ETMC-5 Activities of the GCCs Geneva 2015 Activities of the GCCs ETMC-5 22 nd – 25 th June 2015, Geneva, Switzerland.
State of Georgia Release Management Training
REVIEW OF OUTCOMES FROM THE 2 nd WIGOS Workshop on Quality Monitoring and Incident Management ICG-WIGOS-5 WMO; OBS/WIGOS.
WMO WIGOS Pre-operational Phase Regional & National Perspectives Tyrone W. SUTHERLAND (BCT, EC FP for WIGOS)
WE Surface-based GOS for Weather May 2008 Up-date.
CHILDREN OF PRISONERS PARTNERSHIP What is the Children of Prisoners (CP) Partnership? The CP Partnership is a funding project between PFI and selected.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Data Coordinating Center University of Washington Department of Biostatistics Elizabeth Brown, ScD Siiri Bennett, MD.
Implementing the New JCOMM Marine Climate Data System (MCDS)
Prepared by the JCOMM Ship Observations Team
GEOSS Data Sharing Principles
What is JCOMMOPS JCOMMOPS occupies a unique place as the focal point for the practical coordination of the in-situ ocean observing systems defined by JCOMM.
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
WMO, World Weather Watch, Data Processing and Forecasting Systems)
Overview of the WMO Integrated Global Observing System (WIGOS)
Coordinating Operational Oceanography and Marine Meteorology
Organisation Météorologique Mondiale Pour une collaboration active dans le domaine du temps, du climat et de l’eau OMM Operating principles of the WMO.
PMO Advisor / Marine Networks
Coding issues BUFR Binary Universal code Form for the Representation of meteorological data Binary Table driven code form (BUFR, CREX) Efficient compression.
JCOMM Submitted by: TT-MOWIS (Doc 03b)
JCOMM SOT 8 TT-Training …PMO’s play an important role in all the observing programs of the SOT… Paula M. Rychtar SOT Chair on the Task Team for Training.
Argo Information Centre & Argo Users
Presentation transcript:

Ship Safety and Security Implementation of Masked Callsigns Ship Observations Team ~ integrating and coordinating international ship-based observing programmes for JCOMM ~ World Meteorological Organization Intergovernmental Oceanographic Commission of UNESCO Ship Safety and Security Implementation of Masked Callsigns SOT-IV 16-21 April 2007, Geneva, Switzerland Graeme Ball Chairman, SOT

Implementation of Masked Callsigns, SOT-IV, Geneva Outline Definitions Review of the Masking Options: Advantages / Disadvantages; Flow Diagram; and Summary. Conclusions. Recommendations. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Definitions REAL Official ITU callsign of the ship. SHIP Non-unique identifier. REAL is unilaterally replaced by the letters SHIP. MASK Unique, repeating identifier. MASK is assigned by the NMS that recruited by the ship. ENCODE Unique, non-repeating identifier. Derived by encrypting specific elements of the message, e.g. callsign + latitude + longitude 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Option 1 - REAL Advantages Disadvantages Default option of all NMS. Ships can easily be identified on publicly available NMS or similar products displaying callsign. Real-time and delayed-mode quality monitoring are not compromised. REAL included in national updates to WMO No. 47, hence the integrity of WMO No. 47 is retained. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Option 2 - SHIP Advantages Disadvantages Identity of the ship is hidden. Non-unique (advantage ?). Implemented at source before sending of the observation OR at the NMS before GTS dissemination. Real-time quality monitoring of SHIP is impossible unless non-masked data are supplied separately to the monitoring centres and NMSs. Immediate implementation if quality monitoring concerns are ignored. Delayed-mode quality monitoring not possible with SHIP. Ships cannot be tracked individually on publicly available NMS or similar products that routinely show callsign. Renders WMO No. 47 largely unusable 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Summary - SHIP Largely eliminates vessel tracking. Impacts on the usability of WMO No. 47. SHIP without additional measures to assist with QM: No real-time QM by monitoring centres; No delayed-mode QM; and Data excluded from long-term climate studies. SHIP with additional measures to assist with QM: Enables real-time and delayed-mode quality monitoring. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Option 3 - MASK Advantages Identity of the ship is hidden. Short to medium term implementation. Real-time and delayed-mode quality monitoring. REAL included in national updates to WMO No. 47. Independent of the official ITU callsign of the ship which often changes. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Option 3 - MASK Disadvantages Overheads to maintain a database of REAL v MASK. Possible that MASK may impinge on REAL of another country. Monitoring centres and NMSs need real-time access to a centralised database of MASK v REAL. NMSs must keep up-to-date the MASK v REAL database for access by the monitoring centres. Ships can be tracked on publicly available NMS or similar products routinely showing callsign. E-SURFMAR implementation impacts on long-term climate monitoring. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Summary - MASK Unique identifier. Independent national schemes. Repeating identifier: Enables real-time and delayed-mode quality monitoring; but Does not eliminate vessel tracking. No impact on WMO No. 47. Effective implementation for QM requires: Centralised MASK v REAL database; and Access routines by monitoring centres and NMS. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Option 4 - ENCODE Advantages Identity of the ship is hidden. Real-time and delayed-mode quality monitoring are not compromised. 3rd party users of ship data would receive ENCODE. One proposed solution is to uses a public key for encoding and a private key (restricted distribution) for decoding. REAL included in national updates to WMO No. 47. Ships cannot be tracked with ENCODE because the encrypted value changes with each observation. Permits the random selection of elements in the message to be encrypted as ENCODE. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Option 4 – ENCODE (cont) Disadvantages Requires all monitoring centres and NMSs to upgrade their message recognition and switching systems to include encoding and decoding routines. The length of ENCODE exceeds the currently permitted callsign length in the message recognition software in some NMSs. BUFR is regarded by some as the preferred message format in which to transmit ENCODE, however BUFR is not mandatory until 2012. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Summary - ENCODE Only requires encode and decode routines. 3rd party data users get the ENCODE version of data. No impact on WMO No. 47. Permits the random selection of elements to be encrypted. Requires BUFR due to the length of ENCODE. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Conclusions SHIP satisfies the requirement for ship anonymity and largely eliminates vessel tracking. SHIP without additional measures to assist with QM is not recommended for the VOS. MASK satisfies the requirements for ship anonymity and quality monitoring, plus it eliminates data loss when REAL changes during a voyage. MASK is recommended for the VOS. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Conclusions (cont) ENCODE satisfies the need for ship anonymity and quality monitoring, plus it largely eliminates vessel tracking. ENCODE is recommended as the long-term solution for the VOS. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva Recommendations ENCODE to be promoted as the preferred long-term SOT solution with a recommendation to EC-LIX requesting that all NMSs and monitoring centres eventually incorporate SOT approved encoding and decoding routines in their message recognition and switching centres. In the shorter-term MASK is preferable to SHIP in the case where SHIP is implemented without additional measures to assist with QM. The use of SHIP in this manner should be discouraged. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Recommendations (cont) For SHIP to meet all requirements, it is proposed that countries implementing this scheme at the NMS level: Collect the raw (non-masked) BBXX in a secured database and provide these data to the monitoring centres or NMSs as required; If these data are not provided in real-time then perform the real-time QM on ships that it masks and provide feedback to the appropriate VOS FP; Delayed-mode data must use REAL; and Technical solutions to supply the raw data to be developed in collaboration with the receiving centres to ensure there is one agreed delivery method. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Recommendations (cont) For MASK to meet all requirements, it is proposed: That JCOMMOPS hosts the centralised MASK v REAL database; The database is password protected from unauthorised access; and Countries implementing MASK to supply: Quarterly VOF list of MASK v REAL, and Monthly update of significant changes to its list of MASK v REAL. VOS Programme Manager to be the national focal point for callsign masking of all national ship-based observing programmes, e.g. SOOP and ASAP. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Recommendations (cont) Establish a Task Team on Callsign Masking and Encoding (Chairs of SOT, VOSP, ETMC, SOT TC): Oversee the implementation of MASK and ENCODE and develop guidelines as necessary; Review and approve national MASK schemes to ensure they remain unique and do not impinge on: The ITU callsign series allocated to a country, or any other marine or oceanographic identification scheme used by WMO, e.g. buoy identification numbers; Ensure the MASK v REAL database is kept up-to-date by NMSs implementing MASK; Develop the ENCODE encryption strategy; and Develop the encoding and decoding keys. 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva

Implementation of Masked Callsigns, SOT-IV, Geneva 16-21April 2007 Implementation of Masked Callsigns, SOT-IV, Geneva