Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007 V-GISC V-GISC Project Office An Introduction by Dieter Schröder (ECMWF)

Slides:



Advertisements
Similar presentations
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
Advertisements

World Meteorological Organisation (WMO) Observing and Information Systems Department WMO INFORMATION SYSTEM (WIS) --- COMPLIANCE SPECIFICATIONS OF GISC,
HALO Harmonised Coordintion of Atmosphere Land Ocean Integrated projects in the GMES Backbone Interoperability of WIS (> GTS + EUMETNET+ GEONET) with other.
SIMDAT TMB, 15 December 2004 AMD-1 SIMDAT V-GISC/SIMDAT project – a Virtual GISC Alfred Hofstadler, Matteo DellAcqua ECMWF.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Torsten Antoni – LCG Operations Workshop, CERN 02-04/11/04 Global Grid User Support - GGUS -
Reshaping Digital Library Services at National Level – Why, How, When? Kristiina Hormia-Poutanen, Director of Library Network Services, Finland Liber annual.
World Meteorological Organization Working together in weather, climate and water RA-VI Scenario WMO Jochen Dibbern Chair WG-TDI Deutscher Wetterdienst.
GTS Ingestion Simdat Meeting Different types of ingestion Ingestion for replication –Essential data –Oriented replication and subscription Added.
Abteilung Systeme und Betrieb ICT-ISS, Geneva November 2008 Page 1 WIS GISCs & DCPCs Functions and Specifications Heinrich Knottenberg
- 1 - Heinrich Knottenberg ET WISC: WIS Development in 2006.
WIS V-GISC – Simdat WMO REGIONAL SEMINAR OUAGADOUGOU BURKINA FASO February 2007 Jacques Roumilhac.
© Pearson Prentice Hall 2009
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
High level expert meeting to develop the Near East Regional Action Plan to Implement the Global Strategy to improve Agricultural and Rural Statistics.
Dave Jent, PI Luke Fowler, Co-PI Ron Johnson, Co-PI
© Prentice Hall CHAPTER 1 Managing IT in an E-World.
Lecture 13 Revision IMS Systems Analysis and Design.
Jean-Pierre Aubagnac on behalf of the v-GISC team in Météo France.
1 World Meteorological Organization WMO Information System WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water.
SIMDAT : Elements for building the WIS TECO-WIS, Seoul, 6-8 November 2006 Matteo Dell’Acqua, Météo-France.
Miguel Nunes Information Systems Project Management IS Project Resources.
The Internetworked E-Business Enterprise
Systems Design. Systems Design Skills People skill (25%) - Listening, understanding others, understanding between two lines, conflict resolution, handling.
2 Object-Oriented Analysis and Design with the Unified Process Objectives  Describe the differences between requirements activities and design activities.
Organizing Information Technology Resources
Presentation Handout EDBA – Module 8 Information Technology 7 th December 2014 By K.M.Prashanthan.
Organize to improve Data Quality Data Quality?. © 2012 GS1 To fully exploit and utilize the data available, a strategic approach to data governance at.
Page 1 © Crown copyright 2005 NESC Workshop 6th-8th September 2005 V-GISC – SIMDAT Gil Ross (Met Office UK) NESC Workshop 6th to 8th September 2005.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
1 CASE STUDIES IN PROJECT MANAGEMENT Lecture 2 Project implementation.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
1 1 Japan Meteorological AgencyET-WISC-3, EUMETSAT Germany, Jun.2008 JMA’s Status Report related to WIS Toshikazu NISHIO JMA ET-WISC-III Jun.
1 World Meteorological Organization AR report to ADC May 2008 Presented by David Thomas (WMO) WORLD METEOROLOGICAL ORGANIZATION Weather – Climate.
1 World Meteorological Organization AR report to ADC September 2008 Presented by Don Middleton (NCAR), on behalf of WIS and Dave Thomas, Jean-Michel.
InWEnt | Qualified to shape the future1 Internet based Human Resource Development Management Platform Human Resource Development Programme in Natural Disaster.
Software Quality Assurance
Deutscher Wetterdienst DWD GISC Implementation GISC Development Team.
Slide 1 ECMWF, 5 September 2007 Slide 1 The SIMDAT project Baudouin Raoult Head of Data and Services Section ECMWF.
# e # Project Charter for e-Courts t. # e Utility of Project Charter Provide a common point of reference Define the roles of each of the stakeholders.
AR WMO Information System (WIS) UPDATE REPORT TO ADC FEB.2008.
Enterprise Architecture, Enterprise Data Management, and Data Standardization Efforts at the U.S. Department of Education May 2006 Joe Rose, Chief Architect.
ECMWF – DCPC Status and plans© ECMWFSlide 1 ECMWF DCPC status and plans Baudouin Raoult Head of Meteorological Data Section.
User Community Transition from EGEE to EGI 17 Dec 2008 – Orsay, France The Proposed EGI Model Diana Cresti, INFN
Testing and integrating the WLCG/EGEE middleware in the LHC computing Simone Campana, Alessandro Di Girolamo, Elisa Lanciotti, Nicolò Magini, Patricia.
1 SIMDAT Simdat Project –GTD. Meteo Activity – SIMDAT Meteo Activity OGF June 2008 Barcelona Marta Gutierrez, Baudouin Raoult, Cristina.
World Meteorological Organization Working together in weather, climate and water WMO Information System (WIS) Progress Report Document 3.5 Prof G-R-Hoffmann.
- 11apr03 # 1 Operations Operations Management = LCG deployment management Management team at CERN (+7 FTEs) Core infrastructure.
International workshop on Météo-France and UK Met Office vGISC implementation OpenWIS installation and requirements for NC / DCPC 5 th June to 7 th June.
Pedro Andrade > IT-GD > D4Science Pedro Andrade CERN European Organization for Nuclear Research GD Group Meeting 27 October 2007 CERN (Switzerland)
SAM architecture EGEE 07 Service Availability Monitor for the LHC experiments Simone Campana, Alessandro Di Girolamo, Nicolò Magini, Patricia Mendez Lorenzo,
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Introduction Salma Saber Electronic.
Bob Jones EGEE Technical Director
Météo France GISC and DCPCs
Regional Operations Centres Core infrastructure Centres
Ian Bird GDB Meeting CERN 9 September 2003
Using MIS 2e Chapter 11 Information Systems Management
NA3: User Community Support Team
EIN 6133 Enterprise Engineering
Maite Barroso, SA1 activity leader CERN 27th January 2009
ESMF Governance Cecelia DeLuca NOAA CIRES / NESII April 7, 2017
Connecting the European Grid Infrastructure to Research Communities
Leigh Grundhoefer Indiana University
© Pearson Prentice Hall 2009
How to Design and Implement Research Outputs Repositories
BioMedBridges – Work Packages 2 & 12
Baudouin Raoult Head of Data and Services Section
CORA ESSNet COmmon Reference Architecture starting ...
Status and Plan of Regional WIGOS Center (West Asia) in
The Survival Plan.
Presentation transcript:

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007 V-GISC V-GISC Project Office An Introduction by Dieter Schröder (ECMWF)

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007 V-GISC V-GISC PO: What is V-GISC? V-GISC – The West European Approach to a GISC

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007 V-GISC What is V-GISC and the Project Office? V-GISC = SIMDAT Software + additional Software for integration of local systems + organisational concept (the so-called VO) V-GISC Project Office: Develops concepts / guidelines to reach an operational V-GISC  (no software development)  System Integration Architecture  Organisational Concept of V-GISC V-GISC Project Office: A VO with 2 staff members (Météo France and ECMWF)

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007 V-GISC System Integration Approach Collaboration DMZ Catalogue Node Data Repository SIMDAT Components Local Intranet Local Databases Reverse Proxy I Reverse Proxy 2 GTS - Switch Decoding SW Customer DMZ Push Mode Umbrella Serving GISC Customers via PUSH Mirror DB User Access Management Data Dissemination System Serving Site Customers

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007 V-GISC What is a Virtual Organisation? Definition: VO, inside view  Co-operating independent organisations VO, outside view  One comprehensive organisation Layer Model: 1. Organisation Layer : Cooperation of people and org. unit 2. Product Layer: Meteorological Data, Data Policy 3. Operational Layer: Basic IT Infrastructure (  Grid Technology) 4. Application Layer: Interoperability of the V-GISC components PO deals with concepts of the Organisation Layer Counterparts:Organisation LayerIT-Layers Structural VO Model IT-Architecture Organisation ChartUML Class Diagram Process OrganisationUse Cases Organisation Flow ChartUML Use Case Diagram

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007 V-GISC Structural Organisation for V-GISC Central Support Office (at one partner site) Central Reference Installation / Central Test System / Central SW Documentation / Bugzilla Repository / SW Asset Management / Office Duties Implementation Team D EUMETSAT ECMWF Implementation Team F Implementation Team UK Implementation Board Syst. Engineers from all sites QM-Supervision/Change Manag./ Escalation/Implem. Governance Steering Committee / Management Board Executive Representatives from all sites Supervision/Escalation/Strategic Decisions Project Manager ( Ideally: Head of Central Support Office) Leading the Project,/ Keep Things Going VGISC Operational Team System Operation/Monitoring/Backup/ Change Management. GTS-Teamleader D GTS/VGISC-Op Team D GTS-Teamleader UK GTS/VGISC-Op Team UK GTS-Teamleader F GTS/VGISC-Op Team F EUMETSAT ECMWF Operational Board “GTS-Teamleaders” QM-Supervision/Change Management/ Escalation/Functional Operative Decisions V-GISC “Op-Teamleader” “Round-robin” from GTS-Teamleaders Operational Decisions/Delegation of tasks SW-Dev. Team D EUMETSAT ECMWF SW-Dev. Team F SW-Dev. Team UK External Development Team (Contractor) Develops Central SW-Modules Design&Architecture Team “Chief Designer” Representative of Each Local Team Major Design & Arch. Decisions/Supervision Local “User-Group” D EUMETSAT ECMWF Local “User-Group” F Loc. “User-Group” UK Evaluation Board Representatives from Local User-Groups Evaluation of Design, Architecture and Software

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007 V-GISC Management & Central Service Central Support Office (at one partner site) Central Reference Installation / Central Test System / Central SW Documentation / Bugzilla Repository / SW Asset Management / Office Duties Steering Committee / Management Board Executive Representatives from all sites Supervision/Escalation/Strategic Decisions Project Manager ( Ideally: Head of Central Support Office) Leading the Project,/ Keep Things Going

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007 V-GISC Structural Organisation for Operation Steering Committee / Management Board Executive Representatives from all sites Supervision/Escalation/Strategic Decisions Project Manager ( Ideally: Head of Central Support Office) Leading the Project,/ Keep Things Going VGISC Operational Team System Operation/Monitoring/Backup/ Change Management. GTS-Teamleader D GTS/VGISC-Op Team D GTS-Teamleader UK GTS/VGISC-Op Team UK GTS-Teamleader F GTS/VGISC-Op Team F EUMETSAT ECMWF Operational Board “GTS-Teamleaders” QM-Supervision/Change Management/ Escalation/Functional Operative Decisions V-GISC “Op-Teamleader” “Round-robin” from GTS-Teamleaders Operational Decisions/Delegation of tasks

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007 V-GISC Structural Organisation for SW Development in V-GISC Central Support Office (at one partner site) Central Reference Installation / Central Test System / Central SW Doc. / Bugzilla Repository / SW Asset Management / Office Duties External Development Team (Contractor) Develops Central SW-Modules SW-Dev. Team D EUMETSAT ECMWF SW-Dev. Team F SW-Dev. Team UK Design & Architecture Team “Chief Designer” Responsible for an homogeneous SW Design Representative of Each Local Team Major Design & Arch. Decisions/Supervision Evaluation Board Representatives from Local User-Groups Evaluation of Design, Architecture and Software / Change Management / Coordination of the Integration Tasks EUMETSAT ECMWF Local “User-Group” D Operational Team Data Management Team … Local “User-Group” F Operational Team Data Management Team … Local “User-Group” UK Operational Team Data Management Team … Steering Committee / Management Board Executive Representatives from all sites Supervision/Escalation/Strategic Decisions Project Manager ( Ideally: Head of Central Support Office) Leading the Project,/ Keep Things Going

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007 V-GISC Structural Organisation: Implementation Central Support Office (at one partner site) Central Reference Installation / Central Test System / Central SW Documentation / Bugzilla Repository / SW Asset Management / Office Duties Implementation Team D EUMETSAT ECMWF Implementation Team F Implementation Team UK Implementation Board Syst. Engineers from all sites QM-Supervision/Change Manag./ Escalation/Implem. Governance Steering Committee / Management Board Executive Representatives from all sites Supervision/Escalation/Strategic Decisions Project Manager ( Ideally: Head of Central Support Office) Leading the Project,/ Keep Things Going

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007 V-GISC Process Organisation Operational Process: SW Development & Implementation Day-to-day operation Backup Process Trouble Ticket Process Missing Data Investigation Change Management Process