WRC-12 Agenda Item 1.7 ICAO WG-F Mexico City 26-30 April 2010.

Slides:



Advertisements
Similar presentations
By Andy Knill Head of Surveillance and Spectrum Management UK Civil Aviation Authority.
Advertisements

World Meteorological Organisation Use of Radio Spectrum for Meteorology: Weather, Water and Climate Monitoring and Prediction Jean-Michel Rainer.
World Meteorological Organisation Use of Radio Frequency bands for meteorological systems Jean-Michel Rainer.
OF OF First Regional Preparatory Group Meeting for ITU-R WRC-12 Agenda Item 1.7 WRC-12 Yoshiyuki Mikuni Office of Aeronautical Satellite Systems Civil.
CITEL Preparation World Radiocommunication Conference (WRC-12) Fortaleza Brazil August, 2010.
N AVISAT Middle East & Africa. 16 September ) NAVISAT System description 2) NAVISAT and worldwide estimated spectrum requirements for AMS(R)S 3)
ITU-R Working Party 8D Status Update Inte rnational Civil Aviation Organization Regional Preparatory Group (RPG) Meeting for World Radiocommunication Conference.
Direction générale de lAviation civile Ministère de l'Écologie, du Développement durable, des Transports et du Logement Direction des Services de la Navigation.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
WRC-11 Agenda on Satellite Issues APG March, 2008 Republic of Korea.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.1 The Directors Report to WRC-15.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.5 – Electronic News Gathering Presenter: Andrew King on behalf of Roger Bunch.
Regional Preparatory Workshop for the ITU WRC-2015
1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013.
Earth Stations on Mobile Platforms (ESOMPs)
BR WORKSHOP ON THE EFFICIENT USE OF THE SPECTRUM/ORBIT RESOURCE ESOA Limassol, Cyprus, April
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.13 – BSS and feeder links 21.4–22 GHz Presenter: Geoff McMillen.
Frequency Co-ordination -for what? The Agreement Frequency Co-ordination -Advantages Frequency Co-ordination -Disadvantages The Procedure Administrative.
World Meteorological Organisation Use of Radio Frequency bands for for meteorological systems Jean-Michel Rainer.
NBTC/ITU Workshop on Cross-Border Frequency Coordination June , 2015 Bangkok, Thailand.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
Agency, version?, Date 2012 Coordination Group for Meteorological Satellites - CGMS Add CGMS agency logo here (in the slide master) Coordination Group.
National Science Foundation 1 Dr. Tomas E. Gergely Electromagnetic Spectrum Manager National Science Foundation Registration of Radio.
Meteorological Spectrum Issues- Outcome of the 2003 World Radiocommunication Conference Presented By: David Franc National Weather Service December 2,
Spectrum for UAS UAS at WRC-12 European WRC-12 preparation Martin Weber, Federal Network Agency, Germany EU UAS Panel Workshop Brussels,
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.17 Presenter: Neil Meaney.
21 April 2009 Public Sector Conference 1 RSPG Opinion on Public Use of Spectrum Jean-Yves Montfort Deputy Director, Spectrum management.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.15 – Oceanographic radars 3–50 MHz Presenter: Paul Hettrick.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.14 – Radiolocation Service 30–300 MHz Presenter: Darrell Ninham.
 Cooperation and information exchange amongst financial supervisors and regulators are essential for effective oversight in an integrated financial system.
International Telecommunication Union Document WRC-15-IRWSP-15/16-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
National Preparatory Working Group meeting for World Radio-communications Conference 2015 Aeronautical Agenda Item 1.7 Presented by Takalani Tshikalaha.
1 Regional Commonwealth in the field of Communications RCC PREPARATION FOR THE WORLD CONFERENCE ON INTERNATIONAL TELECOMMUNICATIONS
Agenda item 9.2 On any difficulties or inconsistencies encountered in the application of the Radio Regulations (non-ESOMPS)
International Telecommunication Union Document WRC-15-IRWSP-15/8-E 3 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
Agenda item 8 Deletion of country footnotes. Here is the drill …. >to consider and take appropriate action on requests from administrations to delete.
CEPT position on WRC-12 AI’s 1.3, 1.4, 1.7, 1.12 and 1.25
CEPT Conference Preparatory Group
Richard Hill Counsellor ITU/TSB
Agenda Item ITU WRC-15 Presented by Koos Pretorius, SACAA
WRC-12 A.I. 1.7 Eric ALLAIX DGAC-DSNA.
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
SADC WRC-15 Preparatory Meeting
RADIO SPECTRUM MANAGEMENT
PRELIMINARY POSITION OF THE RCC CAs ON THE AGENDA ITEMS OF THE WORLD RADIOCOMMUNICATION CONFERENCE 2012.
Regional Preparatory Workshop for the ITU WRC-2015
Richard Hill Counsellor ITU/TSB Presented by Paolo Rosa ITU
Thomas Weilacher Chairman ECC Working Group FM
Bundesnetzagentur Use of the Fixed Satellite Service for RPAS C2 link (ITU Resolution 155 (WRC-15)) Martin WEBER REGIONAL PREPARATORY GROUP.
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
SADC WRC-15 Preparatory Meeting
WRC-15 Agenda Item 1.7 John Taylor ICAO Preparatory Spectrum Seminar for WRC-15 Thailand March 11-12, 2014.
WRC-07 decisions and follow-up
WRC-12 A.I. 1.7 Eric ALLAIX DGAC-DSNA.
5G and IMT Identification - Views from CEPT-
John Taylor ICAO Spectrum Workshop for WRC-15 CAIRO Feb 16-17, 2015
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
NAVISAT Middle East & Africa.
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
SADC WRC-15 Preparatory Meeting
Update of ARIB Activities on IMT Standardization
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
Status report from ITU-R WP 5A on ITS activities
Possible Future Agenda Items
Malcolm Johnson, Director, Telecommunication Standardization Bureau
Agenda Item Overview & draft India proposal
GSC position on key WRC-19 AI 1.5 ESIMs
INMARSAT > CTO> RMA
Presentation transcript:

WRC-12 Agenda Item 1.7 ICAO WG-F Mexico City April 2010

Issue WRC-12 Agenda Item 1.7 requires the consideration of studies in accordance with Resolution 222 to ensure long-term spectrum availability and access to spectrum to meet requirements for AMS(R)S Inmarsat’s view is that existing RR provisions are sufficient to meet the requirements no changes are needed to the RR to strengthen or enforce AMS(R)S spectrum priority at L-band

AMS(R)S Operators and Coordination Process Inmarsat provides AMS(R)S globally MTSAT provides AMS(R)S over Japan and surrounding area A few others are considering new systems, including ESA and Navisat The bands MHz and MHz are shared with several other MSS systems Frequency coordination is conducted in accordance with Article 9 of the RR. To facilitate coordination, the notifying administrations of MSS operators have established two MoUs, one for Regions 1 & 3, another for Region 2. Under these MoUs, the operators conduct coordination at Operator Review Meetings (ORM)

The Radio Regulations Guarantee AMS(R)S Spectrum Access No A gives priority for AMS(R)S in MHz and MHz Resolution 222 reinforces the priority These RR provisions are taken into account in frequency coordination between Administrations Notifying Administrations have an obligation to adhere to the RR and ensure proper functioning of MoU/ORM

Coordination Works in Practice There is no evidence that AMS(R)S traffic demand has not been met during the 12 years that the generic MSS allocations have been in place ORM has accommodated a new AMS(R)S system in the past No Administration so far has invoked the priority provisions of No A or Resolution 222 Future AMS(R)S requirements are modest (up to about 3 MHz according to WP4C studies) and will grow gradually over many years – therefore no difficulty is envisaged in accommodating these requirements The ORM process is spectrum efficient Allows essential peer review of spectrum requirements It is essential to maintain the flexibility and efficiency of the current process This goes hand in hand with retaining unchanged the generic allocations, as required by the agenda item Concerns raised are answered in the following slides

Operator Review Meetings are the Most Effective Means of Agreeing on Spectrum Requirements Frequency coordination is a difficult process, but most do lead to coordination agreements, including the ORM Creating a new forum would not change the dynamics or make it easier to reach agreement, since the same operators and possibly other parties would participate While the ORM is focussed on technical details, a new forum could complicate the process, e.g. make it less objective and more “political”, especially if additional parties not directly involved in L-band MSS are involved ICAO inputs can be obtained without creating another forum

The ORM Process provides a means for administrations and AMS(R)S operators to develop long-term plans for spectrum access The coordination process must necessarily involve significant confidentiality because of the sensitivity of the technical data exchanged, but there are mechanisms available for interested parties to participate in the process The Notifying Administrations have access to ORM information New Administrations and their operators can join the process as required Any other administration could approach the AMS(R)S service provider or national user directly to seek information on whether AMS(R)S demand has been met AMS(R)S operators can share information about their spectrum assignments and use with other parties as desired If requirements were not met, there would be complaints from users and service providers to operators/administrations/ITU-BR/ICAO citing specific problems – but none so far

Even Where Unanimous Agreement is not reached at an ORM, the Process Still Works As mentioned above, coordination meetings are difficult and at times they do not result in unanimous agreement The current MoUs do not require the spectrum assignments to be frozen in the absence of unanimous agreement An agreement was always reached within the ORM, allowing for: Clarity of spectrum access rights New assignments to be made Any resulting effects to be limited to one or two operators Satisfaction of the AMS(R)S requirements There are provisions in the MoU to address the situation where the ORM fails to agree on adequate assignments for any operator So far, all difficulties have been resolved within the ORM process, and these provisions have not been invoked

Having two ORM groupings does not prevent AMS(R)S spectrum access The current arrangements for frequency coordination with two MoU groups (and two ORMs) in Regions 1 & 3 and Region 2 are more efficient at achieving harmonised spectrum assignment than the usual bilateral coordination process Coordination and consultation between the regions do take place, for instance as bilateral meetings between administrations. Even if there is a need to increase these activities, this would not require any change to the Radio Regulations, as current provisions allow for necessary coordination.

Conclusion The ORM process has allowed AMS(R)S systems to work successfully for many years, and has accommodated a new AMS(R)S system The coordination process is open to new entrants Information from ICAO can be fed into the process No changes are needed to the Radio Regulations to meet the objectives of WRC-12 agenda item 1.7