Practice Class Exercise SE Asia Enroute 1. PBN Implementation Processes 2.

Slides:



Advertisements
Similar presentations
ax2 + bx + c 2x2 + 11x + 5 ac 2(5) = b =11 ( ) 2x2 + 10x + 1x
Advertisements

1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Greg Down 2 nd ICAO Global TEM & NOSS Symposium FAA – Washington, DC Normal Operations Safety Surveys The NAV CANADA Experience.
SIP/2012/ASBU/Nairobi-WP/19
Global ATM Operational Concept
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Regional RAIM Prediction System – Progress Report
Industry Viewpoint – Block 0 Carlos Cirilo Assistant Director Infrastructure Strategy 16 November 2012.
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
David Gamper, Director, Safety and Technical Affairs ACI World PRE-CONFERENCE WORKSHOP for the ICAO AIR NAVIGATION CONFERENCE ICAO HEADQUARTERS MONTREAL.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ZMQS ZMQS
Airspace Volumes and Sectorisation Good Design Practice Airspace Volumes and Sectorisation Good Design Practice 1.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A AI Planning at airports:Departure Management PLANET Industry Day.
From Here to There – Group Activity Know how to use navigational aids and charts 1. Identify the types of air navigation charts 2. Know how to use air.
Overview of the PBN Airspace Implementation Processes
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Global Air Navigation Plan
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Quizzes Pencil and calculators only..
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
Figure Essential Cell Biology (© Garland Science 2010)
1 Unit 1 Kinematics Chapter 1 Day
Enroute Design 1 Lead Instructor:
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session Erwin Lassooij ICAO PBN Programme Manager.
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 PBN Flight Procedure Design Seminar.
PBN Plan Development Aviation Industry Forum 18 November 2009.
Washington DC Metroplex March 5, 2015 Implementation.
PBN Airspace Concept Workshop ReviewReview. Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan,
Practice Class Exercise CHINA Enroute 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Enroute Design 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Good Design Practices BEIJING, CHINA; 30 JUN-11 JUL 2014.
HUGHES PROPRIETARY NYC – Hamptons Southern Route.
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Users’ Perspective of PBN Achieving Improvements Joël Morin Head, ATM Harmonization.
Air Traffic Control System Team #3. Introduction The purpose of air-traffic control is to assure safe separation between en-route aircraft and the safe.
Introduction to PBN Seminar ICAO PBN Implementation 1.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
Ministry of Land, Infrastructure, Transport and Tourism Information for redesign of airspace composition Yoshimichi HAMAHATA ATC division, JCAB THE EIGHTH.
PBN Airspace Concept Workshop ReviewReview INTERNET: pin:
Chapter 6 Section A. STAR Standard Terminal Arrival Route –Depart the enroute structure –Navigate to destination –Terminate with an instrument approach.
Performance Based Navigation Aviation Industry Forum 18 November 2009.
Master Production Scheduling Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004.
Ministry of Land, Infrastructure, Transport and Tourism Seamless ATM in North & East Asia Hiromu HAYASHI ATC division, JCAB THE EIGHTH MEETING OF THE INFORMAL.
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
From Here to There Know how to use navigational aids and charts 1. State the elements of a map. 2. Describe how to use air navigation charts.
Federal Aviation Administration 1 Collaborative Decision Making Module 5 “The Collaborative Environment”
Overview of the PBN Airspace Implementation Processes
Users’ Perspective of PBN Achieving Improvements
Erwin Lassooij PBN Programme Manager 30 January 2014
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Continuous Climb Operations (CCO) Saulo Da Silva
Practice Class Exercise SE Asia Enroute
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
PBN and the benefits for GA
ALLPIRG/4 WP/33 Appendix 1.
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
Good Design Practices Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Presentation transcript:

Practice Class Exercise SE Asia Enroute 1

PBN Implementation Processes 2

3 Airspace Concept Activity Overview

Hi Altitude Structure

Enroute

HKK

HKK SID/STAR

HKK

Enroute

Return flight – nose to nose

Thailand

Good Design Practice 15 CORNER-POST Flows by quadrant, segregate Arrivals laterally and vertically from Departures

Design

Hong Kong Phnom Penh Bangkok Vientiane Phuket

Hong Kong / Thailand ✈ Team Lead ✈ Team Recorder ✈ Team Name ✈ Team Lead ✈ Team Recorder ✈ Team Name 19

Hong Kong / Thailand ✈ Safety ✈ Capacity ✈ Efficiency ✈ Environment ✈ Access ✈ Safety ✈ Capacity ✈ Efficiency ✈ Environment ✈ Access 20

Hong Kong / Thailand ✈ NavSpec? ✈ Corner Posts? ✈ ACC Transition points? ✈ NavSpec? ✈ Corner Posts? ✈ ACC Transition points? 21

FiniFini 22